Risk Management for Highway Design Jeffrey Shaw, P.E. Safety & Design TST.

Slides:



Advertisements
Similar presentations
December 5, 2011 Presented by: Sue DAgnese Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS TV Highway at 185th Ave.
Advertisements

PROJECT RISK MANAGEMENT
Interactive Highway Safety Design Model (IHSDM)
Information Risk Management Key Component for HIPAA Security Compliance Ann Geyer Tunitas Group
HSM Implementation Tools Safety Analyst
Project Management Risk Management. Outline 1.Introduction 2.Definition of Risk 3.Tolerance of Risk 4.Definition of Risk Management 5.Certainty, Risk,
Flexibilities in VDOT’s Design Policies and Standards 2012.
ICS 417: The ethics of ICT 4.2 The Ethics of Information and Communication Technologies (ICT) in Business by Simon Rogerson IMIS Journal May 1998.
1 Context Sensitive Design A.K.A. The “Think” Method of Design Howard Preston, P.E. Senior Transportation Engineering CH2M HILL.
SafetyAnalyst Michael S. Griffith FHWA July 2003.
Service Design – Section 4.5 Service Continuity Management.
6-1 Lesson 6 | Practice RSA. Perform a practice-RSA of a design-stage or an in-service road. Analyze data acquired from site visit or design plans and.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
ENVIRONMENTAL MANAGEMENT PLAN
PAVEMENT MANAGEMENT SYSTEMS OVERVIEW Lecture 2. n Provide a historical perspective of the evolution of PMS over the last 20 years n Describe the basic.
Incorporating Safety into the Highway Design Process.
Road Safety Audits Ghazwan al-Haji PhD student ”On whats goes wrong in road design and how to put it right safely”
Session 6Slide 6-1 Risk Management Lessons from Outside the United States Session 6 Slide Deck.
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO GENERAL RISK MANAGEMENT 2.
Safety Audit Components Safety assessment for risk Management.
61 What is hazard risk management?. 62 Emergency risk management is “a systematic process that produces a range of measures that contribute to the well.
© 2011 HDR All rights Reserved. Value Engineering Ken L. Smith, PE, CVS (360) April 27 th, 2011.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Opportunities & Implications for Turkish Organisations & Projects
Codex Guidelines for the Application of HACCP
I n t e g r a t I n g C S S Practitioner Module 5 1 Module 5: CSS and Livability in Project Development.
I n t e g r a t I n g C S S Practitioner Module 2 1 Module 2: Building the Case for Change.
Transportation leadership you can trust. presented to NCHRP Project Panel presented by Cambridge Systematics, Inc. with PB Consult Inc. Texas Transportation.
Environmental Impact Assessment (EIA): Overview
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
Project Risk and Cost Management. IS the future certain? The future is uncertain, but it is certain that there are two questions will be asked about our.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Performance Measurement and Analysis for Health Organizations
1 Development of countermeasures Hossein Naraghi CE 590 Special Topics Safety March 2003 Time Spent: 6 hrs.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
NIST Special Publication Revision 1
Center for Risk Management of Engineering Systems University of Virginia, Charlottesville 26 Schedule.
Local Government Section
Overview of the Work Zone Safety and Mobility Rule Module 1.
INTEGRATING ENTERPRISE RISK MANAGEMENT IN THE FEDERAL GOVERNMENT
Generally Accepted Recordkeeping Principles Generally Accepted Recordkeeping Principles ® Registered Trademark of ARMA International.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
Management & Development of Complex Projects Course Code MS Project Management Risk Management Framework Lecture # 22.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
Incorporating Safety into Design CE 453 – Highway Design October 2, 2006 Jerry Roche, P.E. Transportation Safety Engineer FHWA – Iowa Division Federal.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Quantitative Safety Information and Project Development Session 8 Policy Level Issues Related to Safety Timothy Neuman, PE Chief Highway Engineer CH2M.
Design Speed and Target Speed Norman W. Garrick Lecture 3.1 Street and Highway Design Norman W. Garrick Lecture 3.1 Street and Highway Design.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
Putting Together a Safety Program Kevin J. Haas, P.E.—Traffic Investigations Engineer Oregon Department of Transportation Traffic—Roadway Section (Salem,
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Preserving the Lost Art of Geometric Design: Tools, Techniques and Talent TRB Workshop - January 23, 2011 Understanding the Art Mark Doctor, PE Federal.
Interdisciplinary teams Existing or new roadway
Flexible Design and Design Exceptions
Data-Driven Safety Analysis
TSMO Program Plan Development
Presentation transcript:

Risk Management for Highway Design Jeffrey Shaw, P.E. Safety & Design TST

“RISK” A factor, element, or course involving uncertainty regarding harm, loss, danger or damage

Risk Management Test for Design 1.Does your agency have adequate and dynamic processes in place to identify existing and new risks faced? 2.Does your agency have the right balance of arrangements in place to deal with these risks? 3.Does your agency have an adequate framework for risk analysis and evaluation to support decision-making processes? Source: "Guide to Risk Assessment and Allocation for Highway Construction Management", FHWA-PL

Risk Management Characteristics Explicitly addresses uncertainty Based on the best available information Part of the decision-making process Systematic, structured, and an integral part of organizational processes Dynamic, iterative, responsive to change, and capable of continual improvement and enhancement Accounts for human factors Transparent and inclusive

Risk-oriented Highway Design Not a new concept May involve different approaches and viewpoints  Who or what is “at risk” and what is the core motivation –Safety of Facility Users (i.e. motorists, pedestrians, etc.)? –Road Agency (tort liability concerns)? Underlying theme is addressing the risk  Implication is that relying solely on standards does not guarantee a facility free of risk  Identifying/defining the risk is essential for managing the risk

Fundamental Aspects Understanding Design Risk involves:  Knowing the basis and assumptions underlying the standards  Defining the conditions of the project –Physical –Traffic –Safety

Identify & Characterize the Degree of Risk What are the variables that influence Risk? Exposure  Traffic Volume  Location  Duration Deviation from Nominal  Degree of variance Severity of Outcome  Possible worst-case scenario

Assessing Design Risks Assessing the probability and severity of adverse consequences associated with activities, recommendations or designs. Does not need to be a complicated quantitative assessment, but rather a practical assessment based on experience, engineering judgment and historical standard of practice. To the extent possible, risks should be quantified, both on the basis of their potential probability and for their potential consequences.

Risk-based Safety Analysis Tools Safety Effects Studies  horizontal alignment  vertical alignment  cross-section  intersections IHSDM (ihsdm.org)  Includes crash prediction, design consistency and capacity calc Highway Safety Manual

Latest Research and Best Practices Design-stage Road Safety Audits Risk-based Safety Analysis Tools

Safety Performance Evolution NOMINAL SAFETY examined in reference to compliance with standards, warrants, guidelines and sanctioned design procedures SUBSTANTIVE SAFETY actual or expected crash frequency and severity for a highway or roadway segment or intersection

RSAs Add Value to a Project Compromises and constraints are a normal part of transportation budgeting RSAs demonstrate the safety implications of roadway elements RSAs ensure that safety is an explicit consideration, and that safety does not “fall through the cracks” RSA focus corresponds to stage of project

Early Stage RSAs PRECONSTRUCTION  planning / feasibility  preliminary (draft) design  detailed design CONSTRUCTION  work zones  pre-opening EXISTING  in-operation reviews HIGH VALUE!

Integrating RSA + VE Consider the sequence scenarios of conducting both an RSA and a VE study on the same project Possible Outcomes: 1.RSA conducted before VE 2.VE conducted before RSA 3.RSA and VE conducted in concert, with separate teams of individuals

Considering Risk of Design Exceptions Evaluating design exceptions in determining whether:  An appropriate criterion for a CORRIDOR is less than the minimum normally applicable (design speed, roadway width)  An appropriate design value to use at a LOCATION is less than the minimum standard (curve radius, gradient)

Common Denominator of Highway Design Effectively dealing with the “TRADE-OFFS”  Adding lanes vs. minimizing property takes  Clear zones vs. preserving mature trees  Property access vs. high mobility  Designing for vehicle traffic vs. accommodating other user groups

Design Controls with High-Reward Potential Functional Classification Design Speed Design Traffic Design Vehicle Design User

Design Risk Management Process MEASURE MITIGATEMANAGE IDENTIFY

Link Between Risk Mgt and Flexible Design Helps deliver both a PROJECT and a PROGRAM Underlies a National Priority (FHWA and AASHTO) Allows consideration of a wider range of alternatives and design options Facilitates cost-effectiveness, with emphasis on increasing safety & efficiency

Recognition of Risk-Reward Basis “It is not feasible or intended for highway projects to be entirely risk- free, as there are potential rewards to the project when risk is taken.“

Using Risk Mgt to Improve Design “In many cases, the risks associated with decisions can be mitigated with inclusion or enhancement of other features, which may offset the risk.” “The evaluation of risk is an interdisciplinary process requiring involvement of project team members and stakeholders based on the specific issues and an evaluation of risk tolerability.”

A Peer Model Requires a Plan/Process Identify Related Risks Analyze in terms of Severity and Likelihood Decide and Document Permits either Quantitative or Qualitative Assessments

Related Training & Technical Assistance FY2010 NHI # Highway Design: Applying Flexibility & Risk Management FHWA Resource Center Safety & Design Team NEW