Hydrological Monitoring Microwatershed Monitoring Subwatershed Monitoring as part of overall hydrological network Lower Gumara Fogeda River Enkulal Outlet.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

HEALTH PLANNING AND MANAGEMENT
Ann D Hirekatur Project Manager State of Lake Wisconsin Meeting July 13, 2013 Wisconsin River Basin Water Quality Improvement Project.
Streamflow and Water-Quality Monitoring in Support of Watershed Model Development, Potomac River Basin A Cooperative Project between the U.S. Geological.
Pathleen Titus CARDI Representative , St Kitts and Nevis
OAS Management Modernization Overview for CAAP: 15 July 2014
Planning & Monitoring. The Purpose of Planning and Monitoring To ensure that the project is produced on time, within the cost constraints and at the quality.
Evaluating Potential Impacts of Climate Change on Surface Water Resource Availability of Upper Awash Sub-basin, Ethiopia rift valley basin. By Mekonnen.
Subwatershed Outlet (B1 project area) Hydrological Monitoring Institutional strengthening The newly established Tana Basin Organisation have been trained.
Lecture(1) Instructor : Dr. Abdelmajid Nassar Civil Engineering Dept. Master Program Civil Engineering Dept. Master Program
INDUSTRIAL & SYSTEMS ENGINEERING
Comprehensive M&E Systems
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
How to Improve your Grant Proposal Assessment, revisions, etc. Thomas S. Buchanan.
PERFORMANCE AUDIT REPORT ON MANAGEMENT OF PRIMARY HEALTH CARE (A CASE STUDY ON HEALTH CENTERS) 8/16/20151 Dr. Anna Nswilla CDHSMoHSW.
FUNDAMENTALS OF PROJECT MANAGEMENT. Need of Project Management Projects worth billions of rupees undertaken every year. Effective management has bearing.
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia Hydrological.
NRCS Watershed Rehabilitation
Slide 1 of 19 Lessons from the Foundation Learning provision for the new 16 to 19 Study Programmes Discussion materials Issue 1: Attendance, retention,
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
1 Ministry of Education Budget Execution March 28, 2010 As of.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
Watershed Monitoring and Evaluation (WME) component of the Tana Beles Integrated Water Resources Development Project (TBIWRMP) in Ethiopia 7 th April 2009.
Deksyos Tarekegn National DSS Specialist - Ethiopia
Author: Robin Razack- Civil Engineer, SPU, GGMC MINING ROADS GUYANA GEOLOGY AND MINES COMMISSION SPECIAL PROJECTS UNIT 25th August, 2015 PRESENTATION FOR.
Big Horn Lake Sediment Management Study. US Army Corps of Engineers Omaha District Study Background Bureau of Reclamation and Omaha District Interagency.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
FP7 – Capacities Research Infrastructures and Research for the Benefit of SMEs.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 2 C ertificate IV in Project Management
1 HYDROLOGY OF TIBET,CHINA 合作 求实 质量 创 新 Hydrology of Tibet, China  Hydrology administration in Tibet is undertaken in both central and local levels. There.
FLOOD MANAGEMENT By: Joyce Mathole Directorate: Hydrological Service Department of Water Affairs and Forestry.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Statistics Canada Statistique Canada Cost-Efficient Framework for Data Collection for CATI Surveys Social Surveys Collection Research Steering Committee.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
Nile Basin Initiatives (NBI) Easter Nile Technical Regional Office (ENTRO) Flood Preparedness and Early Warning Project (FPEW-I) Flood Forecasting in EN.
2.4 Key Management Roles KEY CONCEPT
Planning your Project Managing your 333T project is like managing any professional project.
M INISTRY OF WATER AND ENERGY M ODELING E XPERIENCE N OV, 2012.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
WISKI for Hydrologic Assessment Michael Seneka Water Policy Branch Alberta Environment and Sustainable Resource Development.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
Hydrological Monitoring of TBIWRDP programme watersheds Anteneh Kibret, TBIWRDP, BoWRD.
Heartland Network Data Management in the Heartland Network Background –Centralized staff –Protocols developed and implemented primarily in-house –12 of.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
Sydney (02) Melbourne (03) Brisbane (07) Carlo Biaro Capital Insight Conference 2013 – Tools and.
4th IPWG Workshop Chinese Meteorological Agency, Beijing, China, October, 2008 MAINSTREAMING THE OPERATIONAL USE OF SATELLITE PRECIPITATION DATA.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Malawi Public Expenditure Review: Road Sector 21 November 2007.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Status Report and Way Forward on Budget-related.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
NCOP PRESENTATION ON CONDITIONAL GRANTS AND CAPITAL EXPENDITURE – NORTH WEST. FOURTH QUARTER ENDING 31 MARCH
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
Coastal Aquifer Management in the Caribbean Workshop 14 th -16 th December 2011 The Water Resource Management Agency Ministry of Sustainable Development,
Case Lamong River Flood Problem Form (A): Inundation (a) Cause (B): Direct rainfall (a) Flood discharge from upstream runoff (b) Duration (C): Rapid on-set.
WATER RESOURCES DEPARTMENT
Local waste planning Félix Schmidt CSD engineers SA Territorial Reform and Waste Management Situation 1 year after the TAR June 2016.
National Hydrology Project
Donor Coordination Process
Geo-spatial Products, Services and Applications
Objectives of the Training
Vibration Measurement, Analysis, Control and Condition Based Maintenance 14 Predictive maintenance Dr. Michiel Heyns Pr.Eng. T: C: +27.
Middle Cache River Monitoring
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
Comprehensive M&E Systems
Ambient Monitoring Initial Report
Information system analysis and design
Presentation transcript:

Hydrological Monitoring Microwatershed Monitoring Subwatershed Monitoring as part of overall hydrological network Lower Gumara Fogeda River Enkulal Outlet Station

Insitutional responsibility MMP  Responsibility of BoWRD since 2009 Counterparts assigned 2009 Counterparts trained 2010 Budget allocated 2011 and idenpendently operational Operative to some extent – but not providing timely data Subwatershed Monitoring Programme  MoWE HD Subwatersheds identified, measured, design and procurement plan drawn up in Capacity weak in HD, little staff  TaSBO in 2012 Two basic stations set-up in 2012 TaSBO capable to continue and increase monitoring efforts

Number of observations and samples in MMP 2009 – 2012 Significant hydrological database (HYDATA) currently housed at BoWRD Proposal: Move the database management to TaSBO in 2013 Data is being used for water balance calculations, further use for precipitation – runoff modeling

Sediment concentration analyses

Crest stage results Promising preliminary results from MMP stations More crest stage gauges have been procured through NPCU Proposal: Suitable river sections to be identified with help of TB WME WRMA in 2013

Challenges – MMP institutionalisation BoWRD capacitated to carry out routine operations, but entering of data and QA not done timely Weak capacity for supervision and data analyses Maintenance failed in 2012 and severely delayed in 2013 Non-willingness to increase payments with increased workload  decrease in data quality and drop-out of stations in Conclusion: Routine operations integrated in BoWRD work, but the work is not carried out efficiently.

Recommendation and Proposal Move MMP routine operations to TaSBO in 2013 Simultaneously transfer one counterpart from BoWRD to TaSBO Transfer one pick-up from NPCU to TaSBO until the procurement for TaSBO has been finalised (1 pick-up for TaSBO, 4 for ABA, 1 for BeSBO, 1 for Lekemt, expected in rainy season 2013) Reduction of nr of MMP stations after rainy season (best operating stations kept).

= Stations to be closed after 2013 rains

Two out of five subwatershed stations established in 2012 – rapid uptake of activities

Baskura and Enkulal

Way forward – Subwatershed Stations  Road construction through TBIWRDP canceled  Continuation of Baskura and Enkulal?  Baskura at a critical location – upstream of Ribb Dam - short road required only – alternative financing?  Zefie outlet - A1 priority station but currently completely out of reach

Way forward – Subwatershed Stations  The complete cableway equipments for subwatershed stations have been procured through NPCU in 2012  Equipment procrement for TB hydrometric network is in progress ( ) – evaluation of tenders will take place third week May.  Way forward – integrate planning and pool equipment to serve overall TB hydrological  Recommendation: Identify alternative (priority) stations in Tana or Beles watersheds during rainy season – accessible throughout the year  Arrange a training course with the manufacturer in early dry season to build a model SEBA station.