X-33 Environmental Impact Statement: A Study in “Velocity” Or How Fast Can You Do an Environmental Impact Statement?

Slides:



Advertisements
Similar presentations
We need a moratorium Give us the time to find a solution We have an incompatible land-use puzzle to solve The southwestern portion of Buffalo County is.
Advertisements

OR 22 – Greenwood Road to Doaks Ferry Road Expressway Management Plan.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
URBAN INFILLING IMPACTS ON FLORIDA’S SOLID WASTE FACILITIES Debra R. Reinhart, PhD, PE, DEE Roger Wayson, PhD, PE University of Central Florida Marc Rogoff,
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
Surface Transportation project delivery program
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
SOUTH COAST RESOURCE MANAGEMENT PLAN REVISION BUREAU OF LAND MANAGEMENT Palm Springs-South Coast Field Office California Desert District.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Other Environmental Issues U.S. Department of Housing and Urban Development Noise Endangered and Threatened Species Explosive/Flammable Hazards and Underground.
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
Federal Regulation of Land Use 9/27/11. What is NEPA? NEPA = National Environmental Protection Policy Act – Mandates an environmental assessment of all.
Community Preparedness & Disaster Planning. Why Disasters occur ?
What does an Environmental Professional Do?
Fort Bliss Army Growth and Force Structure Realignment Draft Environmental Impact Statement Public Meeting November 2009.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
S.A.V.E. is a non-profit community organization whose aim is to sustain the southern Chester County region’s rural quality of life and community character.
Risk Assessment/Risk Reduction © Risk Assessment/Risk Reduction Risk Assessment Risk Reduction Software.
Transportation Services Report and TCCAP Update March 5, 2014.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Engaging Freight and Supply Chain Representatives in Public Sector Projects.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
January ‘06Advice to Minister1. January ‘06Advice to Minister2 Understanding Climate Change Climate Change Action Plan Elements Climate Change Action.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
Clean Air Act  The Federal Clean Air Act, passed in 1970 and last amended in 1990, forms the basis for the national air pollution control effort.
Welcome Opportunity to Learn – Public, Groups, Agencies and FS Patience Respect Ask.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation May 2004.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
USA Parkway Project Welcome Public Information Meeting to the
Florida Space Transportation Infrastructure Planning Mark Bontrager Vice President, Spaceport Operations.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
COMSTAC Launch Operations Support Working Group May 17, 2007 Jim Ball Spaceport Development Manager NASA Kennedy Space Center Kennedy Space Center Spaceport.
Traditional Project Development Process ConstructionPlanningNEPA Design ROW CE, EIS, EA Location and Design Concept approval.
Managing the Environmental Impacts of Power Canada Europe Roundtable for Business Toronto, 31 May 2005.
Federal Lands Highway Commitment to Excellence Environmental Concerns with Estimating TEA/TUG Conference Portland, Maine October 2006 Jack Van Dop Eastern.
Environmental Protection Agency (EPA)  Founded by U.S. government (under Richard Nixon) in 1970  William Ruckleshaus was first EPA administrator  a.
The Kern Regional Transportation Plan A Vision and Guidebook for Kern County in 2025.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
The Spaceport Enterprise Defining and Developing the Concept Kevin Brown Command and Control Technologies Corp. Advanced Spaceport Technology Working Group.
California’s Flood Future Recommendations for Managing the State’s Flood Risk Flood Risk Management & Silver Jackets Workshop August 21, 2012.
Public Scoping Open House Wabash Avenue/Porter Access Area Environmental Assessment Indiana Dunes National Lakeshore June 28, :00-8:00 p.m.
Economics, Policy,and the FutureSection 2 Section 2: Environmental Policies in the United States Preview Bellringer Objectives History of U.S. Environmental.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
DAPL Dakota Access Pipeline. DAPL Need to Know 1,172 mile pipeline, 30 inches in diameter Connecting the North Dakota oil fields to refineries across.
Ascending to IED compliance
Draft Transportation Element September 6, 2017
Ascending to IED compliance
Section 2: Environmental Policies in the United States
Fifth Standard Solar Project Complex
Construction Management & Inspection
How do councils make decisions on where to build new homes?
SEQRA as a Tool to Review Energy Projects
Section 2: Environmental Policies in the United States
Chicago to Council Bluffs-Omaha
National Oil and Gas Program and NEPA
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

X-33 Environmental Impact Statement: A Study in “Velocity” Or How Fast Can You Do an Environmental Impact Statement?

X-33 Environmental Impact Statement: A Study in “Velocity” SO YOU WANT TO BUILD A SPACEPORT? Well, what are the environmental challenges ahead of you? We have much to learn from the X-33 experience: What are the issues associated with constructing and operating spaceports? Who wants to have input to your decisions? How long does it take to identify and resolve the issues? Are there any surprises in store?

X-33 Environmental Impact Statement: A Study in “Velocity” X-33 was designed to be sub-orbital Testing technologies for VentureStar This presented unique issues regarding landing sites and recovery operations It also required construction of facilities at multiple sites And transportation between sites

X-33 Environmental Impact Statement: A Study in “Velocity” An EIS normally takes from 18 to 24 months to complete Scoping Field Studies Analyses Document Preparation Public Review We were given 12 months We did it in 13 months

X-33 Environmental Impact Statement: A Study in “Velocity” Edwards Air Force Base had already been selected as the launch site This had been selected using a previous environmental study for the program There were three flight expansion envelopes But multiple landing sites for each envelope These became the alternatives addressed in the EIS SHORT MEDIUM LONG

X-33 Environmental Impact Statement: A Study in “Velocity” So once you have the site, the rest should be relatively easy. That is, the main issues that could cause you to spend time and resources should be obvious, right?

X-33 Environmental Impact Statement: A Study in “Velocity” Enter the Desert Tortoise: This is an Endangered Species native to this region There are strict controls protecting them Harassment is prohibited Picking one up to move it off the road to “save” it is considered harassment because if you scare it, it may “lose all its water” and dehydrate and die Therefore, strict controls during construction such as stopping all traffic when a tortoise was crossing the road.

X-33 Environmental Impact Statement: A Study in “Velocity” Short range landing sites included numerous “dry”lake beds in the EAFB region Many of these were on federal (Bureau of Land Management) lands These areas are open for public use So, what’s the Problem? Silurian Dry Lake Bed While private vehicles can drive on the lake without permission, NASA was required to get permits to use it The specific types of activities and areas of impact needed to be approved by BLM And, State Highway 127 is the only road with miles of the site, a traffic control plan was required

X-33 Environmental Impact Statement: A Study in “Velocity” So assuming you’ve got all the site construction issues addressed, What about operations? Well, again, you have to be aware of and protect our friends, the Desert Tortoises. Of course, flight safety and the probability if catastrophic failure was a major concern and the corresponding risk assessments took much of the analysis efforts. However, some of the more interesting issues arose from the noise impacts analyses….

X-33 Environmental Impact Statement: A Study in “Velocity” We looked at noise impacts for static test firing and lift- off at the launch site We also looked at noise impacts related to flight conditions to both on-base and off-site communities

X-33 Environmental Impact Statement: A Study in “Velocity” The flight path generates two types of sonic booms: Mid-range Long-range The focused boom results from the acceleration of the vehicle It is more powerful that the sonic boom from normal or decelerating flight The position and intensity of the effect is dependent on the trajectory, vehicle configuration and atmospheric conditions Focused Normal

X-33 Environmental Impact Statement: A Study in “Velocity” Of interest to us were the recipients of these noise impacts Land Use Categories We addressed this, in part, by looking at the land use categories that lay underneath the projected flight paths for each alternative

X-33 Environmental Impact Statement: A Study in “Velocity” The launch noise and focus boom did not affect much but BLM lands However, for the mid-range site, the landing sonic booms had the potential to impact several Indian Reservations, much of which is considered Sacred Lands by the residents!

X-33 Environmental Impact Statement: A Study in “Velocity” However, the peak sonic boom overpressures from normal flight operations to the proposed long-range landing site could effect eight mountain passes and five ski areas. So we had to address the potential for these flights to produce snow avalanches! The Long-range site also had few issues associated with launch impacts

X-33 Environmental Impact Statement: A Study in “Velocity” We asked how the vehicle would be returned to the launch site We were told that the ONLY possible way to bring it back was atop the NASA 747 Carrier Aircraft

X-33 Environmental Impact Statement: A Study in “Velocity” After completion of the EIS, during implementation planning, it was determined that this approach was not workable It was decided to put the vehicle on a carrier and bring it back to the launch site over the public roads There was then a follow-on study done to determine the most feasible route to use

X-33 Environmental Impact Statement: A Study in “Velocity” Summary The environmental process is your friend, it can help resolve potential problems before they become bigger, so use it. Allow sufficient time and resources to perform the needed analyses. Start early. Each project is unique, so don’t be surprised at what you find. We are here to help, if you want it! Mario Busacca