Doc.: IEEE 802.11-11/1341r0 Submission September 2011 Andrew Myles, CiscoSlide 1 JTC1 SC September 2011 - Closing Report 22 Sept 2011 Authors: Meeting.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0908r1 Submission July 2013 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 SC closing report (July 13) Date: Authors:
Advertisements

Doc.: IEEE /1205r0 Submission Sept 2013 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 SC closing report (Sept 13) Date: Authors:
Doc.: IEEE /0075r1 Submission January 2009 Jesse Walker, Intel CorporationSlide 1 JTC1 Ad Hoc January 2009 Agenda Date: Authors:
Doc.: IEEE /0194r0 Submission Jan 2015 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 SC closing report (Jan 2015) Date: Authors:
Doc.: IEEE /1454r7 Submission March 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 20 March 2013 Haasz et al, IEEESlide.
Doc.: IEEE /1627r0 Submission Dec 2011 Andrew Myles, CiscoSlide 1 JTC1 Ad Hoc January 2012 agenda 23 December 2011 Authors:
Doc.: IEEE 802 ec EC Submission July 2014 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 Standing Committee opening report for IEEE 802 EC 14 July.
Doc.: IEEE / Submission March 2004 Larry Taylor (Staccato)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0795r2 Submission July 2014 The China NB contributed a variation on the “usual comment” on IEEE China NB comment on
Doc.: IEEE /1273r1 Submission September 2011 Andrew Myles, CiscoSlide 1 JTC1 Ad Hoc September 2011 agenda 16 Sept 2011 Authors:
Doc.: IEEE /1528r0 Submission Nov 2014 Andrew Myles, CiscoSlide 1 IEEE 802 JTC1 SC closing report (Nov 2014) Date: Authors:
Doc.: IEEE /0173r0 Submission Jan 2010 Andrew Myles, CiscoSlide 1 Closing Report Date: Authors:
Doc.: IEEE /0355r0 Submission Mar 2010 Andrew Myles, CiscoSlide 1 JTC1 ad hoc March 2010 agenda 5 March 2010 Authors:
Doc.: IEEE /0982r1 SubmissionBruce Kraemer, MarvellSlide 1 WG11 Plenary - Supplementary Information - September 2012 Date: Authors:
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /1454r0 Submission Jan 2013 IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process 15 January 2013 Haasz et al, IEEESlide.
September Session Supplementary Material
January Session Supplementary Material
September Session Chair’s Supplementary Material
July Session Supplementary Material
March Session Supplementary Material
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
July 2011 Closing Plenary Motions
July 2010 doc.: IEEE /0xxxr0 IEEE 802 JTC1 Standing Committee Motions for WG mid-session plenary 9 May 2017 Authors: Name Company Phone.
TGaf San Francisco Closing Report
JTC1 ad hoc closing report (July 11)
JTC1 Ad Hoc November 2011 agenda
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
IEEE 802 status report for ISO/IEC JTC1/SC6 meeting on 30 Oct 2017
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
JTC1 Ad Hoc November 2011 agenda
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee July 2016 opening report for EC
JTC1 Ad Hoc September 2011 agenda
Bruce Kraemer Jesse Walker Al Petrick
IEEE 802 JTC1 Standing Committee May 2018 (Warsaw) closing report
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
IEEE 802 JTC1 Standing Committee July 2018 (San Diego) closing report
JTC1 Ad Hoc Sept 2009 Closing Report
July 2010 doc.: IEEE /0xxxr0 IEEE 802 JTC1 Standing Committee September 2017 (Hawaii) closing report 14 September 2017 Authors: Name Company Phone.
IEEE 802 JTC1 Standing Committee Nov 2016 closing report
July 2010 doc.: IEEE /0xxxr0 Proposed liaison presentation to SC6 in relation to liaisons between IEEE WG and ISO/IEC JTC1/SC 9 May 2011.
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
IEEE 802 JTC1 Standing Committee Mar 2017 closing report
IEEE 802 JTC1 Standing Committee July 2016 opening report for EC
September Session Chair’s Supplementary Material
July 2010 doc.: IEEE /0735r2 Proposed liaison presentation to SC6 in relation to liaisons between IEEE WG and ISO/IEC JTC1/SC 9 May 2011.
July 2010 doc.: IEEE /0xxxr0 Proposed liaison presentation to SC6 in relation to liaisons between IEEE WG and ISO/IEC JTC1/SC 9 May 2011.
TGaf San Francisco Closing Report
JTC1 Ad Hoc May 2011 agenda 10 May 2011 May 2011 Authors: July 2010
IEEE 802 JTC1 Standing Committee Nov 2016 closing report
IEEE 802 JTC1 Standing Committee March 2019 (Vancouver) closing report
July 2010 doc.: IEEE /0xxxr0 IEEE 802 JTC1 Standing Committee September 2018 (Hawaii) closing report 13 September 2018 Authors: Name Company Phone.
July 2010 doc.: IEEE /0xxxr0 IEEE 802 status report to ISO/IEC JTC1/SC6 for SC6 meeting in April 2019 in Beijing, China 22 March 2019 Author:
November Session Supplementary Material
JTC1 Ad Hoc May 2011 agenda 10 May 2011 May 2011 Authors: July 2010
July 2011 Closing Plenary Motions
IEEE 802 JTC1 Standing Committee Proposal for SC6 contribution process
JTC1 ad hoc closing report (May11)
IEEE mc Closing Report for July 2013
March Session Supplementary Material
Introduction Andrew Myles chairs the IEEE 802 JTC1 standing committee
IEEE 802 JTC1 Standing Committee Mar 2017 closing report
November Session Supplementary Material
ARC-agenda-report-minutes-july-2011
November Session Supplementary Material
January Session Supplementary Material
IEEE 802 JTC1 Standing Committee July 2018 opening report for EC
Presentation transcript:

doc.: IEEE /1341r0 Submission September 2011 Andrew Myles, CiscoSlide 1 JTC1 SC September Closing Report 22 Sept 2011 Authors: Meeting document:

doc.: IEEE /1341r0 Submission September 2011 JTC1 SC agenda items Status of WAPI in SC6 Status of 802.1X/AE and security replacements Status of N-UHT (802.11ac replacement) Plan for 8802 standards Plan for next SC6 meeting Feb 2012 in Guangzhou Andrew Myles, CiscoSlide 2

doc.: IEEE /1341r0 Submission September 2011 ISO/IEC JTC1/SC6 met in San Diego in June 2011 and will meet in Guangzhou, China in Feb 2012 SC6 has a F2F meeting every 9 months or so The last meeting was held on June 2011 in San Diego –All WGs met in San Diego — WG1: Physical and data link layers — WG7: Network and transport layers (also known as Future Network) — WG8: Directory — WG9: ASN.1 and registration The next meeting is in Guangzhou, China in February 2012 –Now confirmed for week of 20 Feb 2012 –Only two WGs are planning to meet — WG1: Physical and data link layers — WG7: Network and transport layers –The IEEE 802 will need to send a delegation again! — Please start planning to attend! Andrew Myles, CiscoSlide 3

doc.: IEEE /1341r0 Submission September 2011 The WG has liaised various Sponsor Ballot drafts to ISO/IEC JTC1/SC6 Bruce Kraemer will send the red highlighted documents after Okinawa The WG told SC6 it will liaise ac as soon as it passes a LB will be submitted to SC6 when approved by the SASB – early 2012 Andrew Myles, CiscoSlide 4 Task Group After SD After Hawaii After Dallas After LA After Sing. After Palm Sp After SanFran After Okinawa July 10Sept 10Nov 10Jan 11Mar 11May 11July 11Sept 11 TGae D5.0 TGaa D6.0 TGac TGmb--D6.0-D8.0--D10.0 TGs--D8.0-D10.0-Ratified- TGuD11.0-D13.0--Ratified-- TGvD13.0D Ratified-- TGzD12.0D Ratified--

doc.: IEEE /1341r0 Submission September 2011 There have been attempts to make progress on WAPI NP at a series of CRM teleconferences In San Diego, the US NB proposed that progress could be made on resolving the WAPI NP comments by teleconference IEEE objective is to expunge false commentary on security SC6 subsequently agreed to hold comment resolution meetings (The CRMs were held –10 Aug, 31 Aug, 15 Sept held so far, 21 Nov scheduled (probably last!) –US, UK, Switzerland, China, Korea and IEEE 802 have been represented –Convenor: Mr Seung Ok Lim (Korea) – also new WG1 Chair After the first two teleconference made little progress, it was decided to use as well –Hundreds of s resulted Andrew Myles, CiscoSlide 5

doc.: IEEE /1341r0 Submission September 2011 The Chair would like to thanks various individuals for representing IEEE 802 at the CRMs Andrew Myles, CiscoSlide 6 Bruce Kraemer Dan Harkins Dorothy Stanley Jodi Haaz Brian Weis 10 August Bruce Kraemer Dan Harkins Dorothy Stanley Jodi Haaz Brian Weis 31 August Bruce Kraemer Dan Harkins Dorothy Stanley Jodi Haaz 15 September

doc.: IEEE /1341r0 Submission September 2011 There will be one final CRM on 21 November... The CRM convenor stated that there will only be one more CRM –It will be held on 21 November – discussion is encouraged in the meantime The various parties are far apart... –Latest s are not very encouraging –China NB & Swiss NB technical experts do not seem to understand the implementation of functional entities defined by i –Swiss NB rep is continuing to asserting that all of i is insecure because it includes WEP and TKIP –US NB, UK NB and IEEE 802 reps appear to be aligned –SC6 Chair has stated, “Unless the allegations around 'serious security loopholes' in the NP are deleted and the NP form is revised, it's chair's position not to accept the DoC” Andrew Myles, CiscoSlide 7

doc.: IEEE /1341r0 Submission September 2011 Other topics in SC6 China NB has proposed –An 802.1X/AE replacement –An security replacement –An ac replacement Withdrawal of a number of standards including the 8802 series – responsibility delegated to IEEE 802 to report back with definitive list in February 2012 Andrew Myles, CiscoSlide 8

doc.: IEEE /1341r0 Submission September 2011 The discussion in San Francisco decided to send 802 standards to ISO/IEC under certain conditions Summary from San Francisco 802 plenary meeting There was consensus that it was important for 802 to send standards to ISO/IEC for “registration” Need to guarantee that these will not be edited without the explicit agreement of the 802 owner An implementation plan will be further explored during the November plenary Andrew Myles, CiscoSlide 9