May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 1 ILA - GAUSS Standardization Group Update Presented by Robert W. Lilley, Ph. D. Co-Secretary Contact:

Slides:



Advertisements
Similar presentations
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
Advertisements

WRC–12 Industry Debrief 23 April 2012 Agenda item 1.10 – Allocation requirements of safety systems of ships and ports Presenter: Peter Pokorny.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
NELS status 31th Annual Convention & Technical Symposium ILA October 27-30, 2002 Washington D.C NELS Co-ordinating Agency Office (CAO) Gunn Marit Hernes.
Chesapeake Bay Program Goal Development, Governance, and Alignment Carin Bisland, GIT6 Vice Chair.
WRC-12 Preparation CPG Chairman /
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
LORAN C By Farhan Saeed.
1 Presentation to: Civil GPS Service Interface Committee (CGSIC) U.S. States and Localities Subcommittee (USSLS) U.S. Coast Guard Integrated Support Command.
TPC Meeting | April 30 – May 1, 2014GAMA | Washington, DC E. Restructuring of Airworthiness Standards - Status of Part 23 & ASTM Standards - Strategy for.
1METLTM – DAMGM ILA Convention and Technical Symposium 32 nd Annual Convention and Technical Symposium of the International Loran Association Boulder,
U.S. Space-Based Positioning, Navigation, and Timing Policy and Program Update The Third Annual European Defence Geospatial Intelligence Conference (DGI.
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
GLONASS Government Policy, Status and Modernization
2 Overview With active participation from individuals and chapters all over the world, the Information Systems Security Association (ISSA)
GNSS International Cooperation Munich Satellite Navigation Summit Munich, Germany March 6, 2007 Ralph Braibanti Director, Space and Advanced Technology.
GLONASS Government Policy, Status and Modernization
U.S. Programs & Policy Jason Y. Kim Senior Advisor, National Coordination Office United States of America U.N./Colombia/U.S.A. Workshop on the Applications.
GPS Modernization 14 March 2005 CGSIC IISC Europe.
ILA 2003 in Boulder, Colorado 4-6 November 2003 NELS beyond 2005 Gunn Marit Hernes NELS Co-ordinating Agency Office (CAO) Northwest European Loran-C SystemCo-ordinating.
GPS Vulnerability Assessment CGSIC International Sub-Committee Meeting Melbourne, Australia February 10,   CAPT Curt.
32 nd International Loran Association November 3-7, 2003 FERNS Status and Future Tamotsu Ikeda Erik Johannessen Linn Roth.
Protecting GPS Transportation Infrastructure – Action Plan Status Report 43rd CGSIC Meeting Washington, DC March 10, 2004  CDR Peter Keane U.S. Department.
Satellite Navigation Program Federal Aviation Administration.
New Loran-C Receiver Performance Levels for Extended Range Eurofix and Kinematic Applications G.W.A. Offermans, A.W.S. Helwig, R. Kellenbach, W.J. Pelgrum,
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
James T. Doherty Institute for Defense Analyses 16 October 2007
U.S. Space-Based Positioning, Navigation, and Timing Policy and Program Update Briefing to the International Committee on Global Navigation Satellite Systems.
GNSS Regional and Global Cooperation Asia Pacific Economic Cooperation 11 th GNSS Implementation Team Tokyo, Japan June 2007 Alice Wong Senior Advisor,
Global Navigation Satellite Systems Progress through Cooperation 5 March 2009 Michael Shaw, Director U.S. National Coordination Office.
Transition to Digital Broadcasting and Digital Dividend 6-7 October 2011, Belgrade, Serbia 1 Sub-Regional Workshop on Transition to Digital Broadcasting.
David A. Turner Office of Space Commercialization National Oceanic and Atmospheric Administration U.S. Department of Commerce U.S. Government Role in Fostering.
08 June 2006 Portland 2006: aircraft certification session Yves Morier The EASA Advance -NPA for UAV systems Certification Presentation by: Y Morier EASA.
GCM, Annecy – France Activity Report Piotr Grygier Vice President Multifunctional forest management and society matters.
Deputy Assistant Secretary for International Affairs for Fossil Energy Justin “Judd” Swift – U.S. Department of Energy.
SDCG-6 Oslo, Norway October 22-24, 2014 SDCG 3-Year Work Plan Stephen Ward, SDCG EXEC (Australia) SDCG-6: Oslo,
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
RADIONAVIGATION CAPABILITIES ASSESSMENT TASK FORCE CGSIC March 10, 2004   John Augustine U.S. Department of Transportation.
GPS POLICY AND PLANNING Mr. Joe Canny US Department of Transportation Presented at IISC Meeting December, 1999.
USCG NAVIGATION CENTER NAVCEN and GPS CGSIC IISC European Meeting Prague, Czech Republic 14 March 2005 Rebecca M. Casswell Chief, GPS Branch.
WSIS and WGIG Update An APNIC Perspective AP* Meeting Kyoto.
PRESENTATION TO SELECT COMMITTEE ON ECONOMIC AND BUSINESS DEVELOPMENT 13 OCTOBER 2015 RATIFICATION OF THE AFRICAN MARITIME TRANSPORT CHARTER 1.
Source: OEA/Ser.W /XIII.2.3 CIDI/CIDS/doc. 6/02 The Inter-American Program on Sustainable Development establishes the priorities and policy guidelines.
CHALLENGES TO EFFECTIVE SPECTRUM MANAGEMENT CGSIC – 43 rd MEETING MARCH 10, 2004   Gregory A. Wheeler DOT Office of Navigation.
Alice Wong, Senior Advisor U.S. Department of State Bureau of Oceans and International Environmental and Scientific Affairs Office of Space and Advanced.
2003 FRP User Conferences 1 FAA’s Transition Strategy for Navigation and Landing Services Dave Olsen Navigation System Engineer Architecture and Systems.
Examining the Risk Posed by GPS Jamming & Spoofing Professor David Last Strategic Advisor General Lighthouse Authorities of United Kingdom and Ireland.
U.S. International Activities Supporting Global Navigation Satellite System (GNSS) Compatibility and Interoperability October 16, 2008 David A. Turner.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Satellite Navigation Program
Progress Report Performance Audit Subcommittee - PAS INTOSAI Governing Board meeting Mexico City, November 2 and 3, 2006.
Regional Action Plan for Sustainable Transport of Dangerous Goods along the Mekong River Final Regional Workshop, October 2014 Bangkok, Thailand.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
PNT International Challenges and Opportunities PNT Advisory Board Washington, D.C. March 29, 2007 Ralph Braibanti Director, Space and Advanced Technology.
European eLoran Status Dr Sally Basker & Dr Nick Ward General Lighthouse Authorities of the United Kingdom and Ireland International Loran Association,
CGSIC International Subcommittee Prague, Czech Republic March 14, 2005 Michael E. Shaw Director, Navigation and Spectrum Policy U.S. Department of Transportation.
19-21 February 2008 Michael Shaw, Director U.S. National Coordination Office for Space-Based Positioning, Navigation, and Timing (PNT) GPS-Galileo Progress.
The importance of resilient position-fixing for e-Navigation George Shaw PNT Seminar, RNN, Stockholm 18 May 2011.
Agenda item 1.16 VHF data exchange system (VDES).
FERNS Status and Future
The Codex Alimentarius Commission
RATIFICATION OF THE AFRICAN MARITIME TRANSPORT CHARTER
RADIO SPECTRUM MANAGEMENT
Overview of U.S. Participation in ISO and IEC
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
Proposed IHO Work Programme for 2018
European 5G regulatory developments
IHO Secretariat, Monaco, November
Status Report of the SPRWG of the Council
Presentation transcript:

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 1 ILA - GAUSS Standardization Group Update Presented by Robert W. Lilley, Ph. D. Co-Secretary Contact:

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 2 GAUSS Background (1) Global AUgmentation of Satellite Systems Created by Northwest Europe Loran System (NELS) consortium NELS, with HQ in Oslo, is a treaty organisation of Denmark, Ireland, France, Germany, Norway and The Netherlands. Formed GAUSS in January, 2000 Tasked to revise ITU-R M to include data transmission Includes both Loran-C and Chayka "Technical Characteristics of Methods of Data Transmission and Interference Protection for Radionavigation Services in the Frequency Bands Between 70 and 130 kHz" ( Standardises 3-level pulse position data transmission modulation (Eurofix) I ncludes a standards placeholder for other data-link designs Revised standard accepted by ITU -- now...-3 Provides a world-wide standard for the technology

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 3 GAUSS Background (2) Global AUgmentation of Satellite Systems Once ITU-R M was completed, GAUSS identified new work Integrated radio navigation services using Loran-C/Chayka Includes data communications outside NELS coverage and political boundaries Gauss sought an independent international organisation as host Facilitates standardisation work with states world-wide Representatives from eight countries in Europe, North America, Asia. The International Loran Association (ILA) was approached Specific interest in Loran-C/Chayka services for land, sea and air worldwide ILA agreed to host Gauss, endorsing its expanded charter

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 4 Scope Integrated navigation and timing systems Using Loran-C/Chayka technologies Both the transmitting and the receiving elements All transportation modes plus timing Maritime, aviation & land users Positioning/navigation and communications applications All stakeholders Service providers, administrations, manufacturers and users Global approach Allows for regional adaptations Provides guidance, promotes standardisation Facilitates regulation, cooperation, harmonization

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 5 GAUSS Goals To facilitate development of performance standards for submission to relevant international fora To facilitate standardisation by providing relevant documentation and expertise to the relevant international standardization fora To provide information and guidance to interested parties The general public The potential users Manufacturers Administrations Service providers Policy makers To encourage the development of integrated radio navigation system equipment that incorporates Loran-C/Chayka technologies To encourage system providers to improve their existing systems by introducing enhanced features while preserving backward compatibility with existing Loran-C/Chayka technology

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 6 Participants GAUSS is inclusive Recognise the value of radionavigation and timing systems using Loran-C/Chayka technologies Public providers Manufacturers of transmitting and receiving equipment Administrations and organisations with an interest in these systems Users of these systems. Membership in ILA is not required for participation in GAUSS

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 7 What Does GAUSS Do? (See ILA radionavigation policy at GAUSS implements elements of ILA Radionavigation Position "We did a good thing when we retained Loran-C, reversing earlier plans" " We need it now, more than ever" "It's not your father's Loran-C any more" From "ILA radionavigation policy" Integrated systems need Loran-C in a satellite and terrestrial mix ILA advocates orderly progression in all regions worldwide Loran-C + data communications is necessary and critical to the future mix Benefits accrue when these systems are used in concert. Recent analyses and events re-validated the long-standing policy GAUSS standards proposed for regional/international use

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 8 Recent Meetings Fifth meeting: Bonn Germany, February 22-23, 2001 Completion of draft ITU-R M revisions as assigned by NELS Sixth meeting: St Germain en Laye, France October 11-12, 2001 First meeting as special committee of ILA and with expanded TOR Stand by for news of upcoming events...

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 9 Everything Changed… or did it? The Volpe Vulnerability Report on GPS: "Volume 4" of the chronicle of the evolution away from Sole-Means GPS GPS still the centerpiece in the US, and available to the world Response to Volpe report from agencies with safety-critical applications Non-satellite alternatives desirable, and required in some applications Not a safety-policy change, but one of implementation

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 10 Navigation's Larger Picture In the US: DOT working group is preparing a requirements matrix System performance as a member of a system of systems Determine the best mix of systems Change: Aviation required to dispatch with two dissimilar systems Change: Upgraded Loran-C can "play" -- positioning and timing Upgrades in transmitting and receiving elements Aviation needs instrument approach performance Data transmission will be desirable In Europe: Moves toward Galileo underway Consideration of dissimilar integrated navigation services may follow. For international seamlessness where it's possible/desirable, standards are needed. GAUSS supports standards.

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 11 The US prepares to decide... From FAA ASD Presentation "Overview of Satellite Navigation Transition" CAASD Industry Day with Users May 7, 2002

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 12 GAUSS Activity update: Sixth meeting Received reports from representatives RTCM SC-104 IALA IEC TC-80 Working Group - test development arm of IMO SOLAS Recognized differences between Eurofix and U.S. LDC Technical and standardization Recognized receiver advances Modern signal processing, less hardware, more software GPS - like "all-in-view" processing emphasized Recognized system advances Modern Loran/Chayka can perform better existing standards require

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 13 Tighten up? …and if so, how much? Some Loran/Chayka systems routinely exceed standards, or are capable of performing considerably better than existing standards require. How much "headroom" can be captured for enhanced user performance? Must retain system provider flexibility, to protect availability GAUSS designated authors for a Technical Information Paper and companion Executive Summary, to make visible the current technical status of Loran-C/Chayka systems. A basis for the debate and discussion...

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 14 The Loran-C / Chayka Technical Information Paper Executive Summary and TIP are in editing now. For completion at GAUSS seventh meeting, June, 2002 Provide technically-correct information for a wide audience Look for final drafts for comment on ILA, GAUSS web sites ( / Describe the systems, and call out regional differences Seek to standardize transmissions where possible Position, timing and digital data International scope Emphasis Loran-C data transmission methods A path toward specifications for enhanced performance

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 15 TIP Summary "Loran C and Chayka Services for the 21st Century" Background Loran-C and Chayka in the US, Northwest Europe (NELS), Far East RadioNavigation Service (FERNS), and Other regional services (Canada, Saudi Arabia, Russia) User Equipment Development encouraged, but awaits US DOT 2002 announcement Provider commitments to the system needed in US, Europe, elsewhere All-in-view, new methods for ASF corrections - Wales, US studies Interference, CDMA (cross-rate), H-field antennas; skywave performance improved by DSP Improvements to Infrastructure U.S. Program underway - clocks, timing, automated integrity alarm Potential for GPS/WAAS and Loran_C control functions broadcasts Loran-C sans SAMs? - U.S. considering TOE or selectable-reference options

May 15, 2002 RTCM 2002 Annual Assembly GAUSS Update 16 GAUSS Next Meetings Seventh meeting: Regensburg, Germany June 10, 2002 (The meeting is one day before the DGON Symposium "Integration of LORAN- C/EUROFIX and EGNOS/Galileo" ( to be held on June 11 and 12 in Regensburg.) One-day meeting - begins 10:00 Completion of Loran-C/Chayka Technical Information Paper and Executive Summary Planning for future work You are welcome - contact Chair, Eighth meeting: Washington, DC, October 27 and 31, 2002 Associated with the annual meeting of the International Loran Association Information will be posted at