ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

CS 325: Software Engineering January 13, 2015 Introduction Defining Software Engineering SWE vs. CS Software Life-Cycle Software Processes Waterfall Process.
Software for Science Support Systems EVLA Advisory Committee Meeting, March 19-20, 2009 David M. Harland & Bryan Butler.
Network Configuration Management hite_paper0900aecd806c0d88.html.
Jim UlvestadEVLA Mid-Project Review May 11-12, EVLA Operations Jim Ulvestad Array Science Center Concept (Requirements) Staffing and Cost Plans.
Computers & Employment By Andrew Attard and Stephen Calleja.
ANASAC, , Chicago Computing B.E. Glendenning (NRAO)
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
ADASS XI Sept30-Oct3, 2001 The ALMA Common Software (ACS) as a basis for a distributed software development G.Raffi, G.Chiozzi (ESO), B.Glendenning (NRAO)
Starting a New Project at IPAC Lee Bennett IPAC Systems Engineering Team Lead June
Software System Engineering: A tutorial
DCS Overview MCS/DCS Technical Interchange Meeting August, 2000.
EVLA Early Science: Shared Risk Observing EVLA Advisory Committee Meeting, March 19-20, 2009 Claire Chandler Deputy AD for Science, NM Ops.
ALMA Operations and the North American ALMA Science Center Al Wootten NRAO.
McMullinEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Data Post-processing: SSG (AIPS++/CASA) Development J. McMullin.
The ALMA Software System Joseph Schwarz (ESO). ACS Course, 15 January 2007The ALMA Software System ALMA is… A radio aperture-synthesis telescope covering.
The ALMA Software and Release Management Ruben Soto Software Operations Group & Release Manager Joint ALMA Observatory.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
N. RadziwillEVLA NSF Mid-Project Report May 11-12, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
Lessons learned from cm-wave interferometry Interferometry analysis is less straightforward than single aperture analysis. Astronomers need ‘support’.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
The North American ALMA Science Center Interim Director, Paul A. van den Bout.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
Response to ASAC Report of May 2004 Response to ASAC The Atacama Large Millimeter Array Tom Wilson and Al Wootten Science IPT.
ICALEPCS’ GenevaACS in ALMA1 Allen Farris National Radio Astronomy Observatory Lead, ALMA Control System.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
FASR Software Considerations Gordon Hurford SSL AUI – August 2007.
Status of Computing at PDR B.E. Glendenning (NRAO), G. Raffi (ESO)
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
December2002, Garching ALMA Computing IDR ALMA AIPS++ Audit Steven T. Myers (NRAO)
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
ALMA’s Roots in Three Scientific Visions Paul Vanden Bout NRAO The Dusty & Molecular Universe – Paris 28/10/04.
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Production ( ) Lecture 3: Dr. Samer Odeh Hanna (PhD) office: 318.
ICALEPCS’ Geneva The ALMA Computing Project Update and Management Approach Brian Glendenning (1) Gianni Raffi (2)
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
Overall Data Processing Architecture EVLA timeline and priorities.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Jim UlvestadEVLA Advisory Committee Meeting May 8-9, EVLA Operations Jim Ulvestad Array Science Center Concept Requirements Staffing and Cost Plans.
Metadata for the SKA - Niruj Mohan Ramanujam, NCRA.
Jeff Kern NRAO/ALMA.  Scaling and Complexity ◦ SKA is not just a bigger version of existing systems  Higher Expectations  End to End Systems  Archive.
NRAO VLA Archive Survey
Computing Architecture
IEEE Std 1074: Standard for Software Lifecycle
EVLA Overall Software Design
EVLA Computing Software Overview.
Atacama Large Millimeter Array
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
Gustaaf van Moorsel September 9, 2003
Software Requirements
Shared Risk Science with the EVLA
Mark McKinnon EVLA Project Manager
Observatory Science Operations
EVLA Operations Jim Ulvestad
Observatory Science Operations
EVLA Construction Status
Presentation transcript:

ALMA Software B.E. Glendenning (NRAO)

2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining –$1B final cost

3 Chajnantor Site, Chile 5000m

4 VLA Comparison VLAALMA N2764 D25 m12 m 7 mm0.35 mm

5 ALMA Computing Computing: –Software development –Necessary operational computer equipment –System/network planning and administration (operations phases) Subsystems: proposal preparation, monitoring, dynamic scheduling, equipment control and calibration, correlator control and processing, archiving, automated pipeline processing, offline processing –Not: embedded software (hardware groups), algorithm development (Science) Activities: management, requirements, analysis, common software, software engineering, integration and test

6 ALMA Computing Budget 230 FTE-y of software development effort on the construction budget 110 FTE-y of software maintenance and system and network administration effort on the interim operations budget starting in ~3 FTE/y in-kind contributions to augment baseline systems in various areas (e.g., Archive, ACS) ~10 FTE/y in NRAO and ESO institutional development of AIPS++, NGAST  ~50 FTE/y $7.1M of equipment required to operate ALMA on the construction budget. $3.8M of communications costs and equipment upgrades on the interim operations budget starting in The above does not include impacts of the operations plan or the Japanese enhancements.

7 Software Scope From the cradle… –Proposal Preparation –Proposal Review –Program Preparation –Dynamic Scheduling of Programs –Observation –Calibration & Imaging –Data Delivery & Archiving Afterlife: –Archival Research & VO Compliance

8 And it has to look easy… From the Scientific Software Requirements: –“The ALMA software shall offer an easy to use interface to any user and should not assume detailed knowledge of millimeter astronomy and of the ALMA hardware. –“The general user shall be offered fully supported, standard observing modes to achieve the project goals, expressed in terms of science parameters rather than technical quantities...” The expert must still be able to exercise full control But what is simple for the user will therefore be complex for the software developer. –Architecture should relieve developer of unnecessary complexity –Separation of functional from technical concerns

9

10

11

12 Configuration Database: DO Schemas

13

14

15