Qualification Tests for the ILC Blade-Tuner Carlo Pagani University of Milano & INFN Milano - LASA Material prepared by: Rocco Paparella & Angelo Bosotti.

Slides:



Advertisements
Similar presentations
of LFD Compensation Study S1 Global Cryomodule
Advertisements

Lorentz force detuning measurements on the CEA cavity
1 Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax :
Tuning system requirements
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
WP8.1 UMI Tuner A. Bosotti, N. Panzeri, R. Paparella, F. Puricelli Updates since the last CARE meeting: Life Time Test for PI-P Cryogenic calibration.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
Cost comparison of tuners H. Hayano, KEK AWLC14
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
, DESY, Hamburg ECFA Workshop, SCRF Session, Lutz Lilje, DESY Lutz Lilje DESY European Linear Collider Workshop ECFA LC2013 Fabrication and Quality.
Carlo Pagani University of Milano & INFN Milano - LASA Blade-Tuner Performance LCWS08 and ILC08 University of Illinois, Chicago, November 2008 Material.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
Blade Tuner L. Lilje for the INFN colleagues. Disclaimer The slides were prepared by R. Paparella and N. Panzeri for Carlo Pagani who could not attend.
A preliminary approach to the needs of open loop control of the Lorentz Force Detuning is to generate a custom piezo control signal with proper and tunable.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
Carlo Pagani University of Milano & INFN Milano - LASA WP8 Tuner Status & Perspective ILC-HiGrade Kick-Off Meeting DESY, Hamburg 29 August 2008 Material.
Cold Tuner test overview S1-Global at KEK 5-9 July 2010.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
Rocco Paparella INFN Milano - LASA WP8 - Tuners Report ILC-HiGrade Scientific and Annual Meeting LAL, Paris, March 6 th 2009 On behalf of LASA team: C.
ALCPG11 1 Comparison of Tuner Performance in S1-G Cryomodule Rocco Paparella, on behalf of S1-Global team.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Preliminary Results from First Blade Tuner Tests in HTS Yuriy Pischalnikov Warren Schappert Serena Barbannoti Matteo Scorrano.
Carlo Pagani University of Milano INFN Milano-LASA & GDE ILC and XFEL Cryomodules Preliminary thoughts for convergence ILC EDR Kick-off Meeting DESY,
20 October 2010 – C.Pagani IWLC S1-Global Tuner Performance Study Carlo Pagani, on behalf of INFN Milan team.
E. KAKO (KEK) 2010' August, 02 meeting Global Design Effort 1 Summary of Low Power RF Tests in S1-G Cryomodule E. Kako, H. Hayano, S. Noguchi,
Detail plan of S1-Global H. Hayano (KEK),
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov (FNAL) S1-Global tuners.
SLIM BLADE TUNER. Modifications & Reliability. Lessons learned from FNAL’s Cryomodule #2 & S1-Global Presented by Yuriy Pischalnikov for FNAL Tuner team.
Warren Schappert Yuriy Pischalnikov FNAL SRF2011, Chicago.
Superconducting RF: Resonance Control Warren Schappert PIP-II Machine Advisory Committee 10 March 2015.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Lutz Lilje DESY Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October.
Compton Gamma-ray Generation Experiment by Using an Optical Cavity in ATF POSIPOL 2007 Workshop at LAL Hirotaka Shimizu Hiroshima University.
SRF Cavities Resonance Control FNAL experience Presented by Yuriy Pischalnikov for Resonance Control Group Fermilab- Los Alamos MaRIE Project Meeting March.
Tuners for 1.3 GHz Elliptical Cavities Warren Schappert Fermilab TD/I&C Thursday May 29, 2013.
VISIT to DESY and SACLAY Tuners for SRF cavities XFEL cavities testing workflow Yu.Pischalnikov 05/07/2012.
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
Shuichi Noguchi, KEKTTC Meeting at IHEP Beijin, Slide Jack Tuner.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
A. Bosotti, N. Panzeri JRA1-SRF05 Legnaro 1 WP8.1 Fast Piezo Blade Tuner (UMI Tuner) for SCRF Resonators Design and Fabrication C. Pagani, A. Bosotti,
Piezo Tuning System (PTS)
S1G Experiment Schedule Plan
Status and plans for the 3.9 GHz section of XFEL
Test of the dressed spoke cavity
WP5 Elliptical cavities
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
LCLS II SRF Cavity Tuner (developed by FNAL)
Tuner system Zhenghui MI 2017/01/17
Crab Cavity R&D Plan Kirk 1 6/Dec/2016
Mechanical setups Lorentz Force Detuning System Setup
Nick Walker (DESY) EU GDE Meeting Oxford
Resonance Control for Narrow-Bandwidth, SRF Applications
Presentation transcript:

Qualification Tests for the ILC Blade-Tuner Carlo Pagani University of Milano & INFN Milano - LASA Material prepared by: Rocco Paparella & Angelo Bosotti

TILC 09 Meeting, Tsukuba, 18 April 2009 Carlo Pagani 2 Resuming Status of the Blade Tuner development: “Slim” design prototype with piezo realized from the original SuperStructures tuner. Manufactured and intensively cold tested at CHECHIA (DESY) and HoBiCaT (BESSY) searching for limits and performances From the experience gained, a “revised” Blade Tuner was designed. Guidelines: titanium, stiffness, strength, piezo action and further simplification. New design tuners manufactured in a small series of 8 units, 2 more are under production.

Qualification Strategy TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 3 Threefold strategy: Room temperature facility using single cell cavities at LASA: Acceptance test after manufacturing Measure of tuning range (limited) with a calibrated load Cold test in horizontal cryostat, Continuous Wave (CW) scenario: Hobicat facility at BESSY available, hopefully tests done by June. Active and positive collaboration with BESSY group is on-going these topics Final cold test in horizontal cryostat, ILC pulsed scenario: No time slots available for CHECHIA at DESY, used for prototype tests. Facility available at FNAL, 2 units already shipped and pulsed cold test before summer.

Carlo Pagani 4 Manufacturing Important installations to come in short times: Cryomodule 2 (CM2) of ILCTA facility at New Muon Lab, FNAL, US: 8 units S1-Global facility at KEK, Japan: 2 units ILC-HiGrade of EU FP7 is also on the way: 24 units TILC 09 Meeting, Tsukuba, Japan

Carlo Pagani 5 Room Temperature Qualification Devoted single-cell facility in use. The tuner acts on an external load with calibrated stiffness. Results meet expectations in terms of homogeneity and predictions (in within 5 %) Tuning range measured up to 11 motor spindle turns, no risk of plastic deformations TILC 09 Meeting, Tsukuba, Japan

Carlo Pagani 6 CW cold tests overview CW and PLL (Phase Locked Loop) facility represents an unique opportunity to deeply understand the performances of each component of the tuning system. Issues to be addressed by cold tests: 1.Tuning : tuning measurements over different ranges and cycles 2.Dynamic detuning : cavity detuning response to piezo actions 3.Sticking and backlash : investigation on eventual non-idealities in cavity constraints at sub-micrometer scale 4.Mechanical : Proper modes, resonances and group delay in the assembly structure 5.CW behavior : Active and passive microphonics compensation

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 7 Setup for the cold BESSY Main parameters for the incoming ILC Blade Tuner cold test : Cavity / tank: Z86 cavity with modified He tank, reduced pad distance and central bellow. A devoted tuner to tank interface has been realized Tuner assembly: Drive unit: Phytron stepper motor + HD gear, the reference choice. Treatments: XFEL “recipe”, Lamcoat + Balinit for HD splines and screw/nut. Piezo: two 40 mm length stacks from Noliac Facility equipment: Stepper motor driver: half-step mode available, 1 A set as maximum current. Lock-in amplifier: for Transfer Function measurements Piezo driver Phase Locked Loop …

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 8 The Phase Locked Loop Phase Locked Loop at HoBiCaT: O. Kugeler, ERL07, Daresbury, May

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 9 Cavity frequency is locked by PLL, stepper motor drive unit is energized. Tuning range and sensitivity (Hz/step) are measured. Qualification Tests: Full range: subsequent complete cycles. Bandwidth-level range: span of 1 ksteps around the nominal working point (1.3 GHz or half-way of the full span). Minimum range: span of 10 steps around the working point iterated by automated routine. Expectations: 600 kHz full tuning range 1.5 Hz/step (half-step) minimum resolution Negligible hysteresis and piezo unloading effect Experience with prototype: Expectations met after cycling. 1. Tuning

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 10 Cavity is locked by PLL and tuned to the nominal working point, piezo are energized. Tuning range and sensitivity (Hz/V) are measured. Qualification Tests : LFD compensation: cavity detuning response (phase error signal) to an half-sin piezo pulse with ILC timing scheme, each piezo alone and together. Piezo DC tuning range: cavity detuning response (phase error signal) to a DC voltage applied to each piezo as well as both in parallel. Expectations: At least 1 kHz dynamic or 2 kHz static piezo detuning as required by ILC RDR. No deviation from piezo nominal hysteresis curve. Experience with prototype: Extremely positive, expectations met with significant margin: 5 kHz static piezo detuning! 2. Dynamic detuning

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani Sticking, backlash and small scale issues Cavity is locked by PLL and tuned to the nominal working point, both drive unit and piezo are used to investigate sub-micrometer scale behavior. Qualification Tests : Motor driven: span of 10 steps around the working point, moving by single steps and iterated by automated routine. 1 step ~ 10 nm cavity displacement. Piezo driven: sinusoidal signal with low frequency (10 Hz) and amplitude applied to each piezo independently. 100 mV ~ 3 nm cavity displacement. Experience with prototype: Positive. No deviation from ideality in piezo behavior. The backlash introduced by planetary gear has been observed 1  m-level cavity strain The Cry3 support scheme with Ti pad sliding on rolling needles will be installed for horizontal cryostat cold test.

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 12 PLL and piezo actuator / sensor duality allow unique analyses of the assembly dynamic response Qualification Tests: Piezo-to-Detuning and Piezo-to-Piezo Harmonic Transfer Functions: main modes concurring to the final assembly dynamic response can be identified, together with group delay and piezo coupling to the cavity. Experience with prototype: Very detailed and repetitive TF acquired. 4. Mechanical analyses Analytical simulation can be performed making use of TF data as, for instance, the response of the system to an arbitrary piezo pulse! Piezo-to-Detuning TF piezo #1 & #2 in parallel

TILC 09 Meeting, Tsukuba, Japan Carlo Pagani 13 Measurements overview A detailed schedule for each experimental measurement is currently under finalization in view of cold tests. In particular, among other: Dynamic detuning: A single half-sin pulse will be used: 1.25 ms time length, 10 Hz rep. rate, amplitude as high as allowed by PLL dynamic range (max piezo voltage if possible). The error signal of the calibrated PLL will be acquired by a triggered oscilloscope, then cavity detuning can be easily reconstructed. The achievable dynamic detuning will be assumed to be the maximum  f obtained in a flat-top equivalent time window (1 ms). Sticking and backlash investigation: During minimum range measurements the motor drive unit will iteratively perform several tuning cycles, each direction inversion will highlight the amount of backlash. For piezo driven small scale measurements an harmonic modulated signal will be fed to piezo in order to perform a locked measurement with the lock-in amplifier. Mechanical analyses: In framework of time constraints, each measurement to be performed at the nominal working point (small tuning range, piezo action) will be repeated in different working points over the tuning range. This will allow to evaluate the effect of compressive pre- load on tuning parameters.