PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IBDR 27/28 Feb 2002 PACS Cryo Harness1 U.Grözinger, D.Lemke, R.Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from CSL,
COIL & ASSEMBLY READINESS REVIEW, SEPT 2013 D. Smekens.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
Just cause you got the monkey off your back doesn't mean the circus has left town.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
PACS IBDR 27/28 Feb 2002 Photoconductor Detector Arrays1 IBDR Hilmar Richter ANTEC-GmbH Germany Günter Bollmann, Peter Dinges, Otto Frenzl, Heidrun Köppen,
W. Aalders FPU CDR 1-3 July 2003 HIFI 1 FPU CDR MCS HIFI MECHANISMS 1.Focal Plane Chopper (FPC) 2.Diplexer Rooftop Mirror Translator (DRT) 3.Pivot development.
Magnetism Any time electrical power is moving through a wire magnetism is created Any time magnetism moves past a wire electrical power is created.
TECHNICAL AND TECHNOLOGICAL CAPABILITIES OF TEST BENCH.
Integration and Test 14 October 2008 Martin Nordby.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
Coil Manufacture, Assembly and Magnetic Calibration Facility for Warm and Cold Magnetic Measurements of LHC Superconducting Magnets CERN AT-MTM 1 / 21.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IBDR 27/28 Feb 2002 PA/QA Status1 PA/QA STATUS MPE /PACS/IGL.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
ASPERA-3 Apr. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/00 Schedule statused.
CERN Rui de OliveiraTS-DEM TS-DEM Development of Electronic Modules Rui de Oliveira CERN CERN hybrid production experience (or how to stay out of trouble)
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IIDR 01/02 Mar 2001 PACS Cryo Harness1 U.Grözinger, D.Lemke, R. Hofferbert Max-Planck-Institut für Astronomie Heidelberg Based on input data from.
ASPERA-3 Mar. 25, 00 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/00 Schedule statused.
Dept. Physics & Astronomy Space Research Group Nick Nelms Space Research Group Dept. Physics & Astronomy University of Leicester UK GERB International.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
THEMIS Instrument PDR 1 UCB, April 19-20, 2004 Spin Plane and Axial Boom Preamps & Sensor Cable Fabrication Critical Design Review Daniel Schickele University.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
Dec
FGM peer CDR FGS - 1 Berlin, April 6, 2004 FGS Mechanical Design Hans-Ulrich Auster Institut für Geophysik und Meteorologie TU Braunschweig.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The University of Tokyo KAGRA external review (Cryogenic payload) 18 April 2012.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
01.Oct.01 SPIRE BSM Product Assurance Team Briefing 1 BSM Product Assurance Plan Team Briefing & PA plan roll-out Ian Pain.
Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October Lutz Lilje, DESY Lutz Lilje DESY Tuner meeting - ILC / Fermilab / LCLS-II Monday 13 October.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Status of the SWAP instrument
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Production & Maintenance
A Systems Approach Automotive Technology PowerPoint® Presentation
Presentation transcript:

PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg

PACS IBDR, Garching 27/28 Feb Chopper mechanical I/F electrical I/F housing mirror actuator P-sensor flex pivot T-sensor Design Status LM:QM: –Major changes ITT Cannon/GORE pigtail Cover with straylight baffles “Vacuum cleaner” magnet Black coating on housing and cover Pre-qualified parts –Minor changes FP bushings Cable routing Grounding pins T-sensor internal

PACS IBDR, Garching 27/28 Feb Chopper Manufacture procedures completed: –Cryo motor coils High purity Al wires, laminated, pre-tempered Cryoperm cores, microscope controlled coiling, ~1100 windings –Position sensor Precision gluing of magneto resistive field plates, optically aligned, cryo-qualified soldering –Rotor Precision gluing of drive/sense magnets and flex pivots, ZEISS in-house procedures for mirror coating incl. Au diffusion blocker cryo motor coil Design Status - Details P-sensor rotor

PACS IBDR, Garching 27/28 Feb Chopper AIV QA Activities KIP 1: QA checks… –Procurement/material certificates –Event records (“Logbuch”) –Inspection certificates –Non-compliances MIP 1: QA checks… –Event records (“Logbuch”) –Inspection reports –Non-compliances –As built documentation MIP 2: QA checks… –Event records (“Logbuch”) –Qualification or acceptance reports –Non-compliances –Final inspection

PACS IBDR, Garching 27/28 Feb Chopper Testmatrix 4 independent models Test items: –Performance at 4K, 77K, 300K –Lifetime –Vibration capability –EMC –Thermal cycling –Bake-out

PACS IBDR, Garching 27/28 Feb Chopper The 5 th Model Engineering model: –pre-tests of parts and unit –Determination of control parameters –Preparation of test procedures –Handling of chopper wrt. cleanliness, storage, mounting in cryostats, cool- down/warm-up requirements –Dummy for first compatibility tests with warm electronics (MEC, CSL) „dummy chopper“

PACS IBDR, Garching 27/28 Feb Chopper LM Verification Flowchart

PACS IBDR, Garching 27/28 Feb Chopper CuBe double-stage flex pivot Engineering Lifetime Test of Flex Pivots Test at Fraunhofer LBF (Darmstadt): –300K environment: Worst case scenario (higher loads) due to reduction of fatigue strength by factor 1.3 –6 FPs in 3 independent rotors (simult. excitation, 50Hz,  9°, goal: 2 x lifetime = 126 Mio. cycles) –Damages of two flex pivots in first run, optical measurement indicated bad alignment of ONE FP HOLDER on mounting bench  test setup has been crucially improved, second run presently underway actuator rotor laser control FP

PACS IBDR, Garching 27/28 Feb Chopper Schedule today

PACS IBDR, Garching 27/28 Feb Chopper Open Points How to order space-qualified pigtails (via TECNOLOGICA or directly) ? When to put black coating on the chopper parts ?

PACS IBDR, Garching 27/28 Feb Chopper Conclusion Valuable experience wrt. flex pivot alignment and lifetime from tests at Fraunhofer LBF (Darmstadt) LM and QM test phases practically in parallel –Fastes way of completing verification plan –Critical wrt. transfer of lessons learned Start of cold lifetime tests in April 2002 QM delivery in May 2002 critical due to –Tight schedule (no margins) –Pigtail procurement (GORE cables, ITT Cannon connectors + manufacture)