Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status.

Slides:



Advertisements
Similar presentations
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
Advertisements

Chiho Wang ATLAS TRT Duke University Hampton, May Xe-CO 2 Stability Chiho Wang Duke University.
Straw tubes for forward tracking at the NLC O.K. Baker, K. McFarlane, V. Vassilikopolus Hampton University Arlington, TX Jan 9-11, 2003.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Module production at Heidelberg Responsibilities: assembly and test of 60 F- modules (5 m) September 28: Series module # 12 finished  20% reached Full.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN HV capacitor Testing.
26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler.
Chiho Wang ATLAS TRT Duke University Dubna, May Fuse Box Production Chiho Wang/Jack Fowler.
Seog Oh/ Duke University/September, 2003 TRT Workshop/ Peniscola, Spain Duke TRT Progress.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Chiho Wang TRD Conference Duke University Bari, Sep Design and Construction of the ATLAS Barrel TRT Chiho Wang Duke University.
Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, April, Athens,
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box Status Chiho Wang Duke University.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Status of Gain Mapping at Duke.
TRT workshop Argon Xenon mix stability Kramarenko Viktor Vorobev Konstantin 10/12/2015.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
High Voltage System outside Drawers Tilecal upgrade meeting at Stockholm (3-5 June 2013) François Vazeille on behalf of Roméo Bonnefoy, Christian Fayard,
Abe Seiden December 2003 SCT Week S USA SCT Barrel Module Assembly SCT Week CERN December 2003 Presented by Abe Seiden U.C. Santa Cruz.
Sound Sound waves are –Longitudinal –Pressure Waves Infrasonic – less than 20 Hz Audible – between 20 and 20,000 Hz Ultrasonic – greater than 20,000 Hz.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Feb ’02, TRT Meetings Jack Fowler – Duke University SEM Analysis of Wire from Aging Test #5 Jack Fowler.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
ICT Module 4 Revision. ICT Attenuation and cable type What is attenuation What cable should be used between buildings and why?
Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Test of the cleaning gas mixtures.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
1 Sasha Milov DC meeting Sept 12, 2007 HBD status Sasha Milov Sept 12, 2007.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Chiho Wang ATLAS TRT Barrel Duke University U. Penn. Workshop, 2000 Module Thermal Analysis Chiho Wang Duke University.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Chiho Wang ATLAS TRT Duke University CERN, Feb Fuse Box & Capacitor Status Chiho Wang Duke University.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
Chiho Wang Technical Training Duke University May, Stringing 101 Chiho Wang Duke University.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Chiho Wang ATLAS TRT Duke University CERN, Feb Gas-Flow Measurements Chiho Wang Duke University.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
Wire Procurement and Wire Joint Production
STATUS OF KLOE F. Bossi KLOE GM, ROMA Nov. 13/14.
Acceptance test at Duke
Jack Fowler Duke University Spain Workshop
Overview of the Frascati Production Facilities
MicroMegas Mechanical Meeting --- Cern April 2014
Module Production and Testing at Duke
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
Wire Diameter Variation
Production Status 39 modules produced
Test of the cleaning gas mixtures.
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
Presentation transcript:

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-Joint Production Stringing Status

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Wire-joint Status  One wire-joint production stations was reactivated in June and the other in July  The average production rate has been about ~80/station/8 hour shift.  QC  Pull test for the first three wire-joints before production  Requirement : the breakage has to occur other than wire- joint. Usual breaking tension : ~200 gram  Visual inspection of every wire-joints  Image of every wire-joint is captured and saved  Need ~200/day to meet the schedule

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Stringing Status  Before the stringing halt due to joint problem, 11 Type 2 and 1 Type 3 modules were strung.  Both stations are active.  15 Type 2 and 8 Type 3 modules are waiting to be strung.  30-40/day/station without re-work  Re-work : After the stringing, ~5-10% of wires are replaced  low tension < 50 grams ~ 130 Hz  Abs( T(front)-T(back)) >5 Hertz  HV problem – tested at 1700 V

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Module 2.12  2.12 History  The first module strung since the stringing resumption  Mechanical construction was completed in Sept,  Wire was cleaned only once just before it entered the module with 99% isopropyl alcohol in ultrasonic cleaner.  Exhibited many odd wave forms in the tension measurement.  Operation, signal test  Current draw : nothing unusual => <1 uA after a few days  4 noise channels -> reverse voltaged 3 ASD groups (3x16 straws) -> Ok after reverse voltage  Very few wires with local gain dip -> little problem with ‘dirt’ on the wire surface  No correlation between odd looking wave form and gain variation  Preliminary gain map exhibits no gross misalignment -> waiting for HU’s full gain mapping.

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Tension

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Tension

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN  Examples of gain dip due to dirt on wire (from 2.08).

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN Summary  Wire-joint production and stringing is in full production mode.  Should not be problem meeting the schedule – completion by August,  2.12  Proper wire cleaning is important.  No obvious alignment problem  Do not understand the odd tension wave forms. Re- measurement shows the same.

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN

Seog Oh/ Duke University/Oct, 2002 TRT/ ATLAS week at CERN