Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012.

Slides:



Advertisements
Similar presentations
In-Situ Remediation at Silver Lake Region 4 Hazardous Materials Geo/Bridge/Environmental Unit.
Advertisements

NAS Brunswick Story Steve Levesque, Executive Director, MRRA September 26, 2013.
Dion Novak, EPA Region 5 RPM
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Environmental Impairment (Pollution) Insurance
Young-Rainey STAR Centre
By Chris Ford and James Hughes ( ) ( )
Greenwich Peninsula.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Land Use Program Septic System Overview Scott Weldon
J-Field Edgewood Aberdeen Proving Ground. Description From 1940 to 1970s, the Army disposed of chemical agents, high explosives and chemical wastes. APG.
AHMET UCANOK JOHN E. ELVIS Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon.
Plaistow, New Hampshire
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
1 Thermal Remediation Services, Inc. Electrical Resistance Heating for In-Situ Remediation of Soil & Groundwater December 10, 2002 Greg Beyke (770)
Department of Defense Facilities Unit Hazardous Waste Management Program of the EPD Land Protection Branch.
B ROWN W OOD P RESERVING S UPERFUND S ITE Live Oak, Florida U.S. Environmental Protection Agency Lisa Moore Daniel Stern.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
1 Remediation and Redevelopment at the Former Fort Devens, Massachusetts, USA.
Contaminated ‘Brownfield’ site in south-eastern Michigan By Zhanyuan Cai And William Chow.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
Trane’s DOE GHP Super ESPC Fort Knox Energy Program
Connecticut Department of Public Works -- Rebecca Cutler – Environmental Analyst.
75TH CIVIL ENGINEER GROUP BE AMERICA’S BEST Hill Air Force Base Environmental Compliance 17 DEC 09 Environmental Compliance 75 CEG/CEVC
Jhon Carilli Low-Level Radioactive Waste (LLW) Activity Lead
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force As of:1 Jane Yagley Program Manager ANG/A7CVP (301) Cultural.
Sustainable waste management by an integrated solid waste treatment plant in Friesland, the Netherlands.
November 2008 Eureka Facilities Meeting. Introduction.
Fort Ord, Monterey County, California History and Closure of a Landfill on a former Military Installation and Current Superfund Site Derek S. Lieberman,
TURNING BROWNFIELDS. Definition US EPA 1997 abandoned, idled or under-used industrial and commercial facilities where expansion or redevelopment is complicated.
Denver Federal Center Calibration Silo Removal Plan What are the DFC Calibration Silos? Installed in 1981 by Bureau of Mines Support minerals industry.
Typical Design of a Production or Monitoring Well.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Mrs. Gamari Physical Science.  Land that was previously used for industrial or commercial purposes and is possibly contaminated by hazardous waste or.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Nevada National Security Site (NNSS) Nevada Field Office (NFO) FY 2015 Status Report Milinka Watson-Garrett Analytical Services Manager U.S. Department.
Monitored Natural Attenuation and Risk-Based Corrective Action at Underground Storage Tanks Sites Mike Trombetta Department of Environmental Quality Environmental.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN & ZONING MAP AMENDMENT RZ-OTH
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Waste Management and Research Center Waste Management and Research Center l Formed in 1984 l IL Dept of Natural Resources l Located at University of Illinois.
Team Successes at the Former Memphis Depot, Memphis, Tennessee Presented by: David D. Nelson, P.G.Thomas C. Holmes Project Manager, CH2M HillProject Manager,
Wastewater Treatment. Municipal Systems … ~75% of Canadians are on these waste water systems Waste leaves your home  enters a service line  enters sewer.
Contamination What is it? Where does it come from? How does it affect us?
Waste Management and Research Center Waste Management and Research Center l Formed in 1984 l IL Dept of Natural Resources l Located at University of Illinois.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
Office of Legacy Management Land Transfer and Reuse November 2006 Steven R. Schiesswohl Senior Realty Officer, Office of Legacy Management.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
The Voluntary Investigation and Cleanup Program Investing in the environment and your economic future Gerald Stahnke, VIC Program Project Manager Minnesota.
Groundwater Pollution
Farmland Industries Lawrence Site Briefing for the City of Lawrence March 11, 2008 March 11, 2008.
Community Development Department FUTURE LAND USE MAP AMENDMENT SMALL-SCALE LU-MIN-07-03a & ZONING MAP AMENDMENT RZ-OTH
Brownfields 2004 September 2004 NTC Orlando Using All the Tools.
New Life for Landfills One Man’s Trash Another Man’s Treasure.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Remediation and Redevelopment at the Former Fort Devens, Massachusetts.
What Do You Know About Michigan’s Hidden Resource?
Georgia Brownfield Program Update
2017 Environmental Trade Fair Shannon Gibson
Average person produces 1700 lbs of MSW per year
Scientific or Engineered Landfilling of Waste
SOIL CONTAMINATION.
Remediation of Environmental Lead Contamination
2018 Environmental Trade Fair Shannon Gibson
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Presentation transcript:

Military Redevelopment – Kelly AFB to Port of San Antonio Tim Underwood Deloitte Consulting LLP May 2012

Copyright © 2011 Deloitte Development LLC. All rights reserved. 1 Kelly AFB Overview Realign to Lackland Light Industrial/ Warehouse (Rail Access) Administrative/ Services Industrial (Aircraft Maintenance) Multimodal Logistics Distribution Center  1,887 Acres  9 Million sq. ft.  Airfield  Industrial  Office Space  Warehouse  Transportation Established 1917 – Closed 2001 At its peak the Kelly AFB and Air Logistics Center employed over 15,000 military and civilian staff Aircraft maintenance, engine repair and logistics

Copyright © 2011 Deloitte Development LLC. All rights reserved. 2 Environmental Overview  700 environmental sites  52 Post-closure Solid Waste Management Units  334 additional sites required investigation  360 above and below ground storage tanks  Industrial waste treatment system and industrial sewer  Groundwater contamination extending 6 miles off base  Remediation included excavation, containment systems, pump and treat systems, soil vapor extraction, in-situ bioremediation and permeable reactive barriers OPS and FOSTLRIP Site Closure (SC) Sites included: landfills, spill sites, former fire training areas, low-level radioactive waste sites, underground storage tanks, aircraft maintenance areas, sludge lagoons, sludge- spreading beds, a small arms range, container storage areas, wash racks, drains, oil/water separators, silver recovery units and spill sites

Copyright © 2011 Deloitte Development LLC. All rights reserved. 3 Three sample facilities: Aircraft Maintenance Hanger  Immediate occupancy desired  Reuse of some of the 37 SWMUs  Immediate renovation  Dual facility occupancy  Combined closure and re- permitting of SWMUs  Combined corrective action and renovation

Copyright © 2011 Deloitte Development LLC. All rights reserved. 4 Three sample facilities: Office Facility (452,000 sq. ft.) B\ 171 SLURRY WALL - INSTALLED JUN 99 DNAPL PUMPING OCCURS WITHIN A FENCED COMPOUND RECOVERY WELLS - UPGRADED MARCH 1998  Incomplete investigation  Active interim and final restoration  Institutional controls  Remedy change  Land use covenants  Performance based contract impact

Copyright © 2011 Deloitte Development LLC. All rights reserved. 5 Three sample facilities: Engine Maintenance Facilities 41 Unit Breakdown 23 Above ground storage tanks (some with underground piping); 03 Oil/Water separators; 11 Vaulted tanks registered as SWMUs 01 Grease trap 03 Washracks Plating shop

Copyright © 2011 Deloitte Development LLC. All rights reserved. 6 Results: Port of San Antonio Environmental:  Final property transfer: 389 acres September 30, 2010  660 sites closed  14 sites entering long term maintenance Commercial:  7.7 million sq. ft. of space occupied  70 commercial organizations  14,000 jobs  Annual economic impact of $4.2 billion