How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan.

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

Downhole Gas Separator Performance In Sucker Rod Pumping System
VSH2 Nitrogen Over Hydraulic Unit
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Drilling Engineering – PE311 Circulating System
WELL PERFORMANCE ANALYSIS
Presented by: Alex Hageman ( Accelerated Production Services, Inc.) May 15 th, 2013 Multiple Stage Hydraulic Jet Pump Presented to ALRDC.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Booster System Basics: Constant Speed Systems
INTEGRATED PRODUCTION SERVICES Wellhead Management from Day 1 December 11, 2001.
Trouble Shooting Lynn Rowlan Beam Pumping Workshop Houston, Texas October 4 - 7, 2005.
Chapter 1 VAPOR AND COMBINED POWER CYCLES
Pump Intake Pressures from Dynamometer Pump Cards Valve Check Load Tests Fluid Levels Shots Lynn Rowlan.
Standard conduit designations Steel pipe Ductile iron pipe Steel tubing Copper tubing Polymeric conduits Reinforced hoses.
Hydraulics.
Adaptive Product Technology for Coalbed Natural Gas (CBM)
Select the Appropriate Pumps and Controls. © Irrigation Association Understanding Basic Pump Selection Considerations Matching the pump and system Flat.
Introduction “…but we weary the unlearned, who need not know so much, and trouble the learned, who know it already.” From the preface, “To the Reader”
Hydraulic Pumps.
Pump Stroke Optimizer A patent-pending device for improving SRP performance, cutting lifting costs and reducing rod wear in horizontal oil wells enclinelift.com.
Irrigation Pumping Plants By Blaine Hanson University of California, Davis.
Electromagnetic Flowmeter Why use flow meters What is a magnetic flow meter – How do they work – How are the different from other meters Items that will.
CASE STUDY ENERGY CONSERVATION OPPORTUNITIES at A Foundry at Bhiwadi (Rajasthan)
Jim Chmielewski – HVAC Sales Manager Emerson Control Techniques
Reciprocating Electric Submersible Pump (RESP)
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
PRESENTED BY Toshiba International: Mike Tharp Hupp Electric Motors: Dave Patterson.
Adjustable Speed Drives (ASD): Failure Reduction and Production Optimization Notes go here. Frank Ochoa 07/25/2007.
Battery Principles.
ENGINEERING YOUR SUCCESS. PDF Market and Sales Meeting Refrigerated Dryers.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
By M. Ghareeb (Lufkin Middle East) Luca Ponteggia (Agip, Italy)
Batch Pumping – A New Method to Solve Downhole Liquid Holdup Bill Elmer 2005 Beam Pumping Workshop.
Breakout Session Operator Issues. Attendance 5 Operating Company reps 3 Service Company reps Multi-Vote Gas Lock/Gas Separation (6) Problems setting TAC.
By: Gatut Widianoko Weatherford Artificial Lift Systems
TEAM UP! FOR FAN AND PUMP SAVINGS It can be as easy as replacing an old drive belt.
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
To prevent cavitation:
Remote Operation of Gas-lifted Wells John Stewart Shell Technology.
© 2008 Data Power Services, LLC By: Tom Taranto 2010 Energy Expo Hosted by National Grid NYSERDA Reducing Compressed Air Energy Cost Using a Systems Approach.
11 th Annual Sucker Rod Pumping Workshop Renaissance Hotel Oklahoma City, Oklahoma September , 2015 Sensorless Artificial Lift Technology John Lesnick.
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
HYDRAULIC MOTORS.
Pressure-Enthalpy and the Variable Refrigerant Cycle
Dynamometers Cards Benefits of High Speed and High Resolution Data Acquisition Lynn Rowlan Beam Pumping Workshop Houston, Texas October 4 - 7, 2005.
Problem Wells Break out Session Beam Pumping Workshop Houston, Texas
Variable Speed Applied to Pumps. Life Cycle Costs - Courtesy of Hydraulic Institute and Europump Initial cost is not the only cost associated with a pump.
Hydro Multi-B – (2) or (3) CME Pumps in Parallel
IS BEAM PUMPING RIGHT FOR YOUR PRODUCTION Rugged, simple - easy to understand Forgiving Good diagnostics exist Possible to pump the well down to low bottom.
NUMERICAL MODEL FOR THE PREDICTION OF FLUID PRODUCTION AND GAS CONSUPTION OF GAS CHAMBER PUMPS PDVSA INTEVEP Fall 2001 ASME/API Gas Lift Workshop Aberdeen.
Pumping System Efficiency. Lower energy cost occurs with a master meter for several wells, but the operator usually is responsible for the poles and.
ARTIFICIAL LIFT METHODS
Kaeser Compressors, Inc.
Lecture 10 Production Engineering
Introducing Adaptive 3D Control for Sigma Air Manager™
EMERGING TECHNOLOGIES AVAILABLE TO REDUCE COMPRESSED AIR DEMAND Double Acting Air Cylinder Double Acting Air Cylinder Air Operated Diaphragm Pumps Air.
Oil and Gas Technology Program Oil and Gas Technology Program PTRT 2432 Artificial Lift Green Book Chapter 1 Planning an Artificial Lift Program.
Irrigation Pumping Plants
Energy Efficient Motors and Variable Speed Drives
HYDRAULICS & PNEUMATICS
Optimum Pump Performance for Process Applications
Enhanced Plunger Lift System plunger Lift for the 21st Century
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Artificial Lift System And Sucker Rod Pumps
Trouble Shooting Hydraulic System Failure
TWM Basic Steps to Perform Valve Check Load Test.
Preventative Maintenance & Service
Electrical Engineering Fifth Semester
High Liquid Volume Plunger Lift in the Permian Basin
Presentation transcript:

How to Maintain High Producing Efficiency in Sucker Rod Lift Operations Lynn Rowlan

What is High Efficiency? Electrical Efficiency Total System Efficiency Should be greater than 50% Surface Efficiency should be greater than 80% Mechanical Efficiency Pump, Rods, Pumping Unit Size and Balance Reservoir Producing Rate Efficiency Should be greater than 95%

High Efficiency? High electrical efficiency, mechanical efficiency and reservoir producing rate efficiency requires: Measurement of motor power, dynamometer data, the liquid level depth with casing pressure and a representative well test. (Electrical efficiency, mechanical efficiency and reservoir producing rate efficiency) All three must be high for the well to be produced at optimum conditions.

What Should be Known in Order to Analyze a Well? Recent and/or Representative Well Test Producing BHP & Static BHP Dynamometer Data Pump Capacity (or, Pump Card) Energy Use Wellbore Description Artificial Lift System Description Fluid Properties Past History

Analyze Well To Determine Efficiencies: Analyzes the well’s inflow performance to determine if additional production is available. ( >95% Eff. ) Determines the overall electrical efficiency. Analyzes the efficiency of the pump. Analyzes the efficiency of the down-hole gas separator. Analyzes the mechanical loading of rods and pumping unit. Analyzes performance of prime mover.

Well Flow Mechanism Flow Productivity = Flow Rate/ Drawdown Flow Rate = 250 Bbl/Day Drawdown = 1000 – 500 = 500 psi PI= (250 bbl/day)/(500 psi) = 0.5 Bbl/day/psi 1000 psi 500 psi Flow

Determine Well’s Potential using Inflow Performance = 357 Bbl/D = 500 Bbl/D

Vogel IPR Relationship PBHP < 10% of SBHP to insure that the well is produced at more than 97% of maximum rate

Power Measurement Equipment Acquire: RMS (thermal) motor current Average (real) motor current kW during a pump stroke cycle. Three voltage sensing leads “RIGHT", "CENTER" or “LEFT". 3. Two current sensors.

Electric Power (kW) and Current (Amps) Input to the Motor over the time of One Pump Stroke

Analyze System Efficiency 2 1 Determine: Input Kw PR Hp Pump Hyd Hp 3

Example of Low Surface Efficiency Bad Tail Bearing Results in Low Surface Efficiency of 66.5% Before Surface Efficiency of 83.0% After Repair of Bad Tail Bearing After

Motor Power and Electrical Analysis Cost $ Power System Efficiency

Use Both Producing Fluid Level Survey and Dynamometer Analysis to Answers the Following Questions: Is the well being produced at its maximum production rate? Does a fluid column exist above the pump intake? Is the pump completely filled with liquid? Is low efficiency caused by incomplete pump fillage due to over-pumping the well or due to gas interference?

Acoustic and Power Surveys Show System Efficiency Less Than 35% Drawdown Dynamometer Your Job Tubing Leak ?

Acoustic and Power Surveys Show System Efficiency Greater Than 35% Drawdown Dynamometer Your Job

Low Efficiencies of Sucker Rod Lifted Wells Are Often Caused by Partial Pump Fillage More efficient operations and lower electrical power usage will result if wells are operated with a pump filled with liquid. Full pump fillage also requires an efficient downhole gas separation that results in a full pump if sufficient liquid is present to fill the pump. Full pump fillage generally requires controlling the run time of the pumping unit to match the pump capacity to the maximum well inflow rate.

Gaseous Fluid Level Above Pump - Gas Interference Gaseous Fluid Level Above Pump - Gas Interference ? Increase Efficiency by Improving Downhole Gas Separator Fo Well Gas Interference Fo Rods

Fluid Level @ Pump - Fluid Pound Fluid Level @ Pump - Fluid Pound? Timer or Pump Off Controller Candidate Fluid Pound

Timers and Pump-off Control Systems Both timers and pump-off control systems can be used to control a pumping unit motor Timers are preset to turn the motor on and off at specific times Pump-off Control systems shut down the motor when incomplete pump fillage is detected, then, turn the motor on after a preset elapsed time

Pump-off Control System Monitors pump fillage when the motor is operating Shuts down the motor when partial pump fillage is detected After a preset down time, starts the motor and again monitors pump fillage

15 Minute Percentage Timer Reduce electricity demand charges Relatively simple to operate Relatively inexpensive Should be considered for low cost intermittent pumping unit operation

Optimize Efficiency of Well Before Installing TIMER or POC Is the PBHP low compared to SBHP at all times? Is the mechanical equipment properly loaded? Is the pump full of liquid when liquid exists in the casing annulus above the pump?

Startup Motor Power 0.7 seconds normal operation

Power Usage During Intermittent Motor Operation Start up Pumped Off Full Pump Stopped

HOW TO MINIMIZE ELECTRICITY USAGE? Maintain a high pump volumetric efficiency: Match pumping unit capacity with wellbore inflow. Pump a Full Stroke of liquid by controlling run time with a POC or Timer Eliminate Gas interference. When System Efficiency is low, find and fix problem. Mechanically/Electrically balance pumping unit. Properly size pumping unit, rods and pump to match well loads. On severely over-sized motors where surface efficiency falls below 50%, reduce motor size.

Periodically Monitor Well’s Operations To Maintain Efficient Operations Check pump for proper operation Produce all available liquid from the Wellbore Operate well with high volumetric pump efficiency Use POC or TIMER to reduce run time if pump capacity exceeds production rate

High Efficiency Reduces Equipment Operating Costs Uniform loading of pump and pumping unit reduces maintenance. Operating the pumping unit a portion of the time subjects the unit to less wear and tear. Fluid pound should be minimized. Reduced shock loading results in decreased rod buckling, pump wear, tubing wear, excessive rod loading changes and pumping unit vibration. Reduction of shock loading reduces maintenance costs.

Maintaining High Efficiency in Sucker Rod Lift Operations Results in: Reduced Electrical Costs Reduced Mechanical Operating Expense. Increased in Oil and Gas Production. Longer Run Times Before Failure.

Questions?