E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL,

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

Henrik Loos LCLS FAC Meeting 27 October RF Gun Status LCLS Facility Advisory Committee Meeting October 26, 2005 Mechanical.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
1 VACUUM ATMOSPHERES Co NEW PRODUCT ANNOUNCEMENT November 28, 2001.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Ice Pile Air Conditioning Joseph Cooper: Project Lead Kylie Rhoades, Clara Echavarria, Jonathon Locke, Alex Gee.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
Single-Cavity Module Installation at MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government.
CONFIDENTIAL Pressure Cure Oven (PCO). CONFIDENTIAL System Overview  Pressure Cure Oven (PCO) or Autoclave is used to minimize voiding and increase adhesion.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
1 Choice of the cleanroom Laser specifications  class 10,000 b) Softwall cleanroom Entire room = cleanroomLaser size = cleanroom Entire room = cleanroom.
Alex Gee Jon Locke Joe Cooper Kylie Rhoades Clara Echavarria Ice Energy Extraction.
Lutz Lilje DESY -MPY- SCRF Infrastructure for ILC EGDE Meeting Lutz Lilje.
Orsay, Sergio Calatroni - CERN 1 CERN facilities for Superconducting RF S. Calatroni, J.-P. Delahaye, J. Tückmantel, B. Vullierme.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
LALEucard WP IN2P3 Les deux infinis IN2P3 Les deux infinis W. Kaabi, Y. Peinaud, A. Thiebault, E. Herry, A. Variola. M. Lacroix, F. Letellier-Cohen,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Mickaël LACROIX (LAL)ILC-HiGrade Scientific and Annual Meeting 1 IN2P3 Les deux infinis IN2P3 Les deux infinis Mickaël LACROIX (LAL) ILC-HiGrade Scientific.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Installation of the T600 at Fermilab CSN2, September 22,
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
TTF3 Coupler Assembly Cleanroom SLAC March 26, 2007 Jeff Tice.
Multiple Module Vacuum Oven Productivity Enhancement System.
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
CMTF Infrastructure Jerry Leibfritz PIP-II Machine Advisory Committee 9-11 March 2015.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Status of TTF3 Coupler Assembly Program November 26, 2007 Jeff Tice.
A European SCRF Infrastructure DESY -MPY Goals of the Infrastructure – ILC – Other projects Timeline – Phasing of work Needs.
CMS Double Chooz HESS Edelweiss Herschel ALICE Detecting radiations from the Universe. EXPERIENCE WITH VACUUM SYSTEM FROM DESY AND CEA SOLUTIONS TTC topical.
Overview on DESY Infrastructure and up date/ grade Activities schedule status and plans Axel Matheisen DESY.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
Installation of the T600 at Fermilab Fermilab, February 15,
ILC : Type IV Cryomodule Design Meeting Main cryogenic issues, L. Tavian, AT-ACR C ryostat issues, V.Parma, AT-CRI CERN, January 2006.
JLab UHV omponent leaning and nitrogen blow off procedures and development Ari D. Palczewski JLab Ari D Palczewski, TTC topical 13Nov2014 Sacley France.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Summary of STF-EP facility at KEK.
Tongming Huang (IHEP) On behalf of the power coupler working group
Cryomodule test stand at ESS site
at STFC Daresbury laboratory
ILC-SCRF Test Facilities considerations
Cleanroom Upgrade in SM18 Optical Inspection bench
EDR HLRF Work Packages Draft Summary
Mathieu, Gabriel, Max, Spyros, Guillaume
WP 3 coordination meeting Saclay May 2008
IHEP Cryomodule Status
Maintenance at ALBA facility: Strategy for the conventional services
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
Presentation transcript:

E. Doyle 7/20/06 rev 9/13/06 1 / 16RF Coupler Assembly Facility SLAC TTF3 Coupler Assembly Facility Specifications Based on TESLA facility built at LAL, Orsay.

E. Doyle 7/20/06 rev 9/13/06 2 / 16RF Coupler Assembly Facility Finished Product – Pair of Couplers on Stand SLAC will assemble and test couplers and ship them to Fermilab for use in ILC superconducting cavity tests. 12 couplers to be shipped by summer ’07. ~30 in

E. Doyle 7/20/06 rev 9/13/06 3 / 16RF Coupler Assembly Facility Model Assembly Facility – LAL, Orsay Assembly in B006 Testing Elsewhere - ESB(?) Parts Storage – B006 SLAC will duplicate DESY assembly/test procedure as implemented at Orsay. Clean room to be modular, factory assembled, installed at SLAC by vendor.

E. Doyle 7/20/06 rev 9/13/06 4 / 16RF Coupler Assembly Facility Gowning area Air shower Material Pass- through - more area recommended Air Handling System – outdoor concrete pad Class 10 – more area recommen ded Class 1000 Clean Room ~50 m 2 (500 ft 2 ) LAL Coupler Assembly Facility Vacuum Oven Washing Vat

E. Doyle 7/20/06 rev 9/13/06 5 / 16RF Coupler Assembly Facility Air Shower Gowning Material Passthrough Class 1000 Class 10 Clean Room Air Handling System Updated flow values shown on next slide

E. Doyle 7/20/06 rev 9/13/06 6 / 16RF Coupler Assembly Facility 106B - SSRL office/storage – possible office space 50m 2 clean room CTL - possible expansion extent unknown Laser HV power Possible clean room storage & office areas – extent unknown Air System 20m 2 footprint - possible locations B006 High Bay – possible home for ILC RF coupler assembly facility Possible clean room storage area High Bay

E. Doyle 7/20/06 rev 9/13/06 7 / 16RF Coupler Assembly Facility B006 High Bay – Bunker Currently Installed in Proposed Site 9’ W x 25’ L x 9’ H Experimental apparatus removed previously. Radiation survey completed inside and out. Ultra-Pure Water System: high pressure rinsing and particle counter to be saved

E. Doyle 7/20/06 rev 9/13/06 8 / 16RF Coupler Assembly Facility B006 High Bay – preliminary layout 9/12/06 GowningClean Room Material Pass- Through Class 10 Storage Lockers Class 1000 Office Space Vacuum Oven Locate Air Handling System?

E. Doyle 7/20/06 rev 9/13/06 9 / 16RF Coupler Assembly Facility Manpower assignments

E. Doyle 7/20/06 rev 9/13/06 10 / 16RF Coupler Assembly Facility Project Phases Safety Oversight Committee Review [8/31/06] –Eight Safety committees to approve before start work Project Plan [10/15/06] –Write plan –approval Site Preparation [12/15/06] –UPWS removal * –Bunker removal * Clean Room Installation (Modular, factory assembled & tested) –Design, write spec and order [11/15/06] –Installation by vendor * [1/15/07] Clean Room Operation –Optimize cleaning process (ultrasonic+detergent vs high pressure water) [3/15/07] –Assemble couplers [3/15 – 8/15/07] –Ongoing production: ~12 in 08; ~30 in 09 * Possible use of outside contractors

E. Doyle 7/20/06 rev 9/13/06 11 / 16RF Coupler Assembly Facility Numerical Specifications

E. Doyle 7/20/06 rev 9/13/06 12 / 16RF Coupler Assembly Facility Clean Room & Air Handling System Air Shower (Laminar Flow) GowningMaterial Pass- through Class 1000Class 10 Area (ft2) Height (ft)88888 Air in (cfm) Recirculation (cfm) Transfer (cfm) Air Return (cfm) Overpressure(in H2O) Exchange (V/hr) Orsay Modified Note: Orsay contacts recommend increased area for Class 10 and material pass-through. This table reflects, in red, changes resulting from a 50% increase in Class 10 area and a 100% increase in mat’l pass-through area and a corresponding decrease in Class 1000 area.

E. Doyle 7/20/06 rev 9/13/06 13 / 16RF Coupler Assembly Facility Power load –Cooling: 38.3 kW –Heating: 16.5 kW –Heating for feed-throughs: 9 kW –Added heating for class 1000: 15 kW Air Conditioning specs –Occupancy: two people –Temp 18 – 22C +/- 1C –RH 50% +/- 10% –Ambient Summer 30C, 40% RH Winter 7 C, 90% RH Air Handling System

E. Doyle 7/20/06 rev 9/13/06 14 / 16RF Coupler Assembly Facility 20 L/h Tank: 350 L (per Orsay) 200 L (per Millipore) Footprint: ~ 4 m2 18 MOhm-cm Output to process: 10 bar equivalent to Milli RX 20 (Millipore current model is Elix 20) Final polishing: ionex filter, organex filter (for organics), durapore filter (0.22 um mesh). Sufficient capacity for high pressure washing? (NLC high-pressure system: 2000 psi) Ultrapure Water System

E. Doyle 7/20/06 rev 9/13/06 15 / 16RF Coupler Assembly Facility Detergent – Tickopur R33 –Concentration: 5 parts per 160 parts H2O Washing tank –Inside L, W, D: 1000x500x400 mm –Outside L, W, D: 1180x600x800 mm –Volume: 180 L –Ultrasonic specs: 25 / 40 khz, 2 kW –Make: Bandelin RM180 Rinsing station(s) –Inside L,W,D: 800x600x450 mm (216 L) Vacuum oven –External: 2 m L, 800 mm diam –Internal: 1.2 m L, 380 mm diam (.14 m3, 4.8 ft3) –Rough pump: 12 m3/h scroll –Turbo pump: varian 550 L/s –Vac: C (.75 x 10-6 Torr) –Vac: 10-7 mbar at r.t. after bake (.75 x 10-7 Torr) –Power requirement: –Make: company no longer in business Fixtures, etc

E. Doyle 7/20/06 rev 9/13/06 16 / 16RF Coupler Assembly Facility Ionized N2 system –Flow: 5.5 SCFM –Pressure: 3 bar –Ionization System: 3.5 – 8 kV –Make, model: Simco PG-8 Assembly tables –120 x 60 cm, SST –5 tables located in class 10 Hoist (?) Storage cabinets (external to clean room) –Qty: five total, two with N2 purge –Dimensions: ~ 2x1.2x0.7 m –N2 pressure: small overpressure –Make: home-built Fixtures, etc, continued