David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.

Slides:



Advertisements
Similar presentations
Basic Refrigeration, Its Components, and Its Cycle
Advertisements

Automotive A/C systems
Refrigeration Basics 101 By: Eric Nelson.
Coach Air Conditioning
Refrigerant Line Sizing Knowledge makes the professional DESIGN AIR UNIVERSITY.
HEAT PUMPS.
General System Maintenance BUS 4 COMPONENT FLOW.PPT
Student CD for Commercial Refrigeration for A/C Technicians
Basic Refrigeration Cycle
Left Side Discharge Pressure Regulator
Refrigeration Flow Control
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
COMMERCIAL REFRIGERATION
COMMERCIAL REFRIGERATION
Product Introduction.
Richard Simmons Drilling Company, Inc. 60 Drill Rig Drive, Buchanan, Virginia Telephone (540) Geothermal Heating & Cooling How it Works.
Evaporators For Air Conditioning
Oil Pressure Problems What to look for.
STEAM HEATING.
1 HVACR316 - Piping Condensation Removal Refrigerant Traps Condensation Removal Refrigerant Traps.
CHAPTER 6 Moving Heat: Heating and Air Conditioning Principles
Refrigerant Piping A Trane Air Conditioning Clinic Air Conditioning Clinic TRG-TRC006-EN © American Standard Inc
Air-Source Heat Pumps I North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Airsource Heat Pump 1.
 a machine that moves heat from a location to another location, using mechanical work.
North Seattle Community College HVAC Program Instructor – Mark T. Weber, M.Ed. Geothermal Heat Pumps.
Perfect solution for large building
Left side compressor behind Left control box Right side compressor behind Right control box.
Air Conditioning Circuit
Batteries The purpose of the battery is to act as a reservoir for storing electricity.
Air Handler Terminology
Refrigeration Basics 101.
Air Handler Terminology
1 A/C Pressure Test and Evacuation. 2 Leak Detection Leak detection must be done after every repair job. It must also be done anytime the appliance can.
Principles of correct VRV Installation A. Refrigerant pipe work
CCNA1 v3 Module 9 v3 A+ Type 2 JEOPARDY K. Martin.
Pressure-Enthalpy and the Variable Refrigerant Cycle
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
Automotive Engines: Theory and Servicing, 7/e By James D. Halderman Copyright © 2011, 2009, 2005, 2001, 1997 Pearson Education, Inc., Upper Saddle River,
Insco Distributing, Inc. R-410A UPDATE SEPTEMBER 15,
Refrigeration Systems
AIR CONDITIONING (COOLING)
Hybritec Refrigerated/Blower Purge Dryers (Combination Dryer)
Air condition installation
WELCOME. Glycol Refrigeration A most basic definition of refrigeration is taking heat from someplace we don’t want it and moving it to someplace where.
James McIntyre VRF Training Manager V5 Key Components.
Understanding the system.
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Pressure Regulators KVR + NRD Presentation , Jbm - Page 1.
Heat Transfer and Refrigeration Cycle
TXV Devices.
Heat Transfer and Refrigeration Cycle
Fixed Orifice Tube Cycling Clutch System (FOTCC)
R1 Fundamentals of Refrigeration
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Cooling technology Main components and equipments
Refrigeration Basics By: Mohamed Iqbal Pallipurath.
R3 Controls, Valves, Accessories & Heat Pumps
R1 Fundamentals of Refrigeration
By: JAGDEEP SANGWAN Refrigeration Basics 101.
FBE03: Building Construction & Science
First Exam is on March 21 Examples are posted on the course website !
Air Treatment School Refrigerated Dryer Training
Presentation transcript:

David Garvin Product Manager EarthDirEX Geothermal Copyright © 2015 Nortek Inc. All rights reserved.

Agenda Why EarthDirEX? Challenges Ground loops Features Charging

Why EarthDirEX? No outdoor unit 30% Tax Credit (until Dec. 31, 2016) Stable sub-surface temperature Less maintenance No pump, no glycol and no outdoor coil, no fan motor Lower operating cost and installed cost 60% Less drilling = lower cost boreholes Direct exchange ~80’/ton Water source ~200’/ton

Definition - Challenges Direct Exchange -There’s no water, no pump, no refrigerant to water heat exchanger. All these items do is reduce system efficiency. Heat exchanger is in direct contact with the Earth. But copper will corrode in the ground! Less than 1% of the ground is corrosive to copper Its illegal to bury refrigerant tubing! DOE/EPA approved direct exchange

EPA Letter

Earth Loop Sizing Two ways to size Earth Loop use the climate zone map use the formula below Cooling load ÷ heating load = less than 1, then use 65' per ton between 1 and 1.75, then use 80' per ton greater than 1.75, then use 100' per ton

Sizing is 65, 80 or 100 feet per ton depending on the climate zone 65 ft/ton 80 ft/ton 100 ft/ton

Sizing Earth loops

Earth Loops

Earth Loop

Some Earth Loop Details Watch out for corrosive ground Stay away from a ph below 5.5 or over 11 All liquid lines are ½ inch Encased in a 1 inch plastic pipe A vacuum must be pulled before backfilling 2 vapor lines are used in the Earth loop Coming out of the Earth loop is one vapor line Up to 250 foot loops are ¾ inch vapor line Over 250 foot loops are 7/8 inch vapor line

More Earth Loop Details The liquid line and the vapor line from the Earth loop to the compressor unit should be buried the deeper of 1.5 feet or below the maximum frost line Must insulate both lines from the top of the Earth loop to the compressor section with heavy duty ¾ inch closed cell insulation, capable of withstand 220°f degree

Features One bi-directional EXV in compressor section Interface control board Oil separator Accumulator with sight glass & float ball for charging Earth loop seal valve

Efficiency and capacities Cooling CapacityEER Heating CapacityCOP 2 ton ton ton ton

Match ups Compressor Section Air Handler Y1SA-024B6EMMN036K-B Y1SA-036B6EMMN036K-B Y1SA-048B6EMMN060K-C Y1SA-060B6EMMN060K-C

Refrigerant Charging Start In Heating Mode & Charge To Sight Glass let system operate 15 min let system operate 15 min check sight glass, add R410A check sight glass, add R410A when the ball is floating in the middle - done when the ball is floating in the middle - done

Oil Separator Temprite coalescent filters will pick up all dirt and particulates down to 0.3 microns Typical filter/driers only catch 50 microns or larger A second filter (shipped with the unit) is to be used as a replacement in 24 to 48 hours (no more then 5 psi drop)

Heating To Cooling Transition The compressor section includes a hot gas valve After heating cycle, the earth loop temperature is low – it was just operation as the evaporator In cooling the refrigerant returning to the compressor section could be two phase (flashing) In cooling mode after 3 minutes of operation, if the suction pressure drops below 95 psig (29°F), a hot gas solenoid valve opens for 10 seconds every 3 min. – Compressor discharge gas is injected into the outlet of the EXV in the compressor box This process will repeat until the suction pressure is above 95 psig If after 60 hot gas injections, the suction pressure is still below 95 psig, the system will go into soft lock out for 60 minutes

Well Seal Valve In 4 and 5 ton systems, the compressor section is equipped with a earth loop seal valve assembly to keep the refrigerant in the earth loop during the off cycle The assembly consists of a vapor line solenoid valve and a check valve for cooling mode The solenoid valve is opened during heating mode operation The purpose of this assembly is to: – Minimize the chance of refrigerant leaking indoors during the off cycle – Minimize the chance of leaking a large amount of refrigerant

Nortek Global HVAC is a subsidiary of Nortek Inc. © 2015 Nortek Inc., All Rights Reserved. Questions?