1 Moving Ahead for Progress in the 21 St Century (MAP-21) Public Law 112-141 Preliminary Briefing Pioneer Valley MPO Joint Transportation Committee September.

Slides:



Advertisements
Similar presentations
2013 TAP CONFERENCE MAP-21 FINAL GUIDANCE ODOT Office of Local Programs.
Advertisements

Transportation Authorization (MAP-21) Details: Safety and Other Provisions August 23, 2012.
Act 44 Transportation Funding John Dockendorf Pennsylvania Department of Transportation November 2007.
Tribal Consultations. Topics FY12 Extensions and IRR Program Funding MAP-21 Programs and Funding.
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
Performance Elements National Goals Performance Measures Performance Targets Performance Plans Target Achievement Special Performance Rules Performance.
1 How to Succeed in Statewide and MPO Transportation Planning.
MAP Washington State Public Transportation Symposium August 26, 2013.
January 16, 2014 Federal Highway Administration Arizona Rural Transportation Summit.
MAP-21 Overview and Programmatic Impacts February 4, 2013 Serge Phillips MnDOT Federal Relations Koryn Zewers.
Florida Commission for the Transportation Disadvantaged 07 August 2013 Jennifer Hibbert Director FTA Office of Planning and Program Development.
Transportation Alternatives. MAP-21 & TAP MAP-21 requires the following with respect to the allocation & selection of projects: ◦TAP funds sub-allocated.
THE PRESIDENT’S FISCAL YEAR 2012 BUDGET REQUEST Federal Transit Administration.
© 2015 AMPO 444 North Capitol Street NW, Suite 345 Washington, DC tel: fax: Washington Update MAP-21 Reauthorization, Highway.
Jack Basso Director of Program Finance and Management American Association of State Highway and Transportation Officials Audit Subcommittee Meeting Phoenix,
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users SAFETEA-LU Key Safety Provisions Federal Highway Administration.
Irene Rico Division Administrator Federal Highway Administration Moving Ahead for Progress in the 21 st Century ~ MAP-21.
Transportation Authorization (MAP-21) Details: Safety and Other Provisions August 22, 2012.
MAP-21: Bridges and Structures Moderated By Joey Hartmann Team Leader, Office of Bridge Technology Federal Highway Administration HIBT Webinar on MAP-21.
Federal MAP-21 Programs 1 Module 7 Safety Analysis in a Data-limited, Local Agency Environment July 22, Boise, Idaho.
Performance Measurement Requirements Notice of Proposed Rule Making.
Funding Levels Similar funding levels to the Transportation Enhancement Activities under SAFETEA-LU: FY 2013: $808,760,000 FY 2014: $819,900,000 Total.
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) National Historic Trails Workshop, October
Webinar: August 28, Transportation Alternatives Program Webinar: August 28, 2013 Introduction: Shari Schaftlein, Director, FHWA Office of Human.
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) International Snowmobile Congress — June
Statewide Local Agency Project Delivery Conference SAFETEA-LU: Earmarks and Federal Programs Relating to Local Agencies Travis Brouwer ODOT Federal Affairs.
Fiscal Years Outlook Preliminary Six-Year Financial Plan and Six-Year Improvement Plan Strategy John W. Lawson, Chief Financial Officer Reta.
State and Federal Funding Programs for Local Agency Projects Alan Lively Local Government Section Project Delivery Specialist.
2012 FTIP/FSTIP Workshop Project Selection Process.
SAFETEA-LU Highlights Roger Petzold Office of Interstate and Border Planning Federal Highway Administration Transportation Border Working Group Nov. 9,
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
FY 2012 President’s Budget Released February 14, 2011.
Trail Funding Sources & General Information
Distribution Guided by State Law Surface Transportation Program (STP) Surface Transportation Program (STP) Congestion Mitigation & Air Quality Improvement.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration Regional Workshop on Performance Management and Performance-Based.
Ron Hall Tribal Technical Assistance Program Colorado State University
MAP-21 Moving Ahead for Progress in the 21 st Century Virginia Association of Planning District Commissions October 4, 2012.
KEY PROVISIONS OF THE DRIVE* ACT H.R. 22, as passed by the Senate on July 30, 2015 *Developing a Reliable and Innovative Vision for the Economy Thomas.
Washington Update Paul Feenstra ITS America / Keystone Public Affairs.
Surface Transportation Authorization AASHTO Executive Director John Horsley SCOH Subcommittee on Construction Chicago, Illinois August 4, 2009.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO TCC & CAC Presentation – August 21, 2012.
U.S./Canada Transportation Border Working group April 9, 2014 Roger Petzold Office of Planning Federal Highway Administration.
MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY MAP-21 Volusia TPO Board Presentation September 25, 2012.
Nelson Castellanos Federal Highway Administration March 12, 2013.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Measure Update.
Highway Program Structure Highway Recommendations Neil Pedersen Chair, ASC Highway Legislative Team Vice Chair, AASHTO Standing Committee on Highways Administrator,
SAFETEA-LU System Management and Operations Key Provisions Jeff Lindley Office of Operations Federal Highway Administration U.S. Department of Transportation.
Action 2020 Training Local Context August 15, 2012.
Transportation Alternatives Program (TAP) Recreational Trails Program (RTP)
IFTA Annual Business Meeting Virginia Beach, VA August 17, 2011 Federal Highway Administration.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Transportation Equity Act for the 21st Century TEA-21 Prepared by Iowa Department of Transportation September 1998.
PennDOT’s Transportation Alternatives Program November 16, 2015.
Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users Advancing Safety through SAFETEA-LU Michael Halladay FHWA Office of.
November 8, MAP-21 themes 2 Strengthens America’s highway and public transportation systems Creates jobs and supports economic growth Supports the.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
Fixing America’s Surface Transportation (FAST Act) Association of MPOs 444 N Capitol St., NW Suite345 Washington, DC
Association of Metropolitan Planning Organizations Fixing America’s Surface Transportation (FAST Act) April 7, 2016.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21st Century An Update on Implementation.
FAST, What does the new transportation bill mean to you April 6, 2016.
UW - Madison Federal Highway Administration (FHWA) David L. Kopacz, P.E. Wisconsin Division Office February 20, 2015.
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Developed from a summary prepared for the New York State Association of MPOs 1.
0 Freight Activities: Year in Review Dec. 12 th 2015.
FAST Act Overview $305 billion 5 year bill – FY ‘16 – FY ’20
Moving Ahead for Progress in the 21st Century Act (MAP-21)
Transportation Alternatives (TA) Set-aside
Chris Metka 2017 Statewide Conference on Heritage ???
Moving Ahead for Progress in the 21st Century Act (MAP-21)
Presentation transcript:

1 Moving Ahead for Progress in the 21 St Century (MAP-21) Public Law Preliminary Briefing Pioneer Valley MPO Joint Transportation Committee September 12, 2012 | MassDOT Office for Transportation Planning |

Moving Ahead for Progress in the 21 st Century (MAP-21) P.L Passed by Congress on June 29, 2012 and signed into law by President Obama on July 6, 2012 The 27-month, $118 billion authorization bill funds highway, transit and highway safety programs through September 30, 2014 – supports/creates over 1 million jobs Authorizes & extends existing motor fuel taxes collected & deposited into the Highway Trust Fund (HTF) through September 30, 2016, and various truck and tire excise taxes through September 30, 2017 Transfers $18.8 billion from the General Fund to the HTF over the life of the bill and identifies new revenue “transfer” sources & offsets to fully fund the bill MAP-21 contains no federal earmarks and does not increase the deficit | MassDOT Office for Transportation Planning | 12, 2012

Highway and transit funding at current levels with 2014 inflation adjustment Maintains the approximate 80/20 highway/transit funding split Provides State spending flexibility with limited HTF resources to focus funding where it’s needed Eliminates or consolidates approximately 60 programs into four core highway programs (NHPP, STP, HSIP, CMAQ) Environmental/project streamlining provisions to accelerate project delivery Promotes performance based investment decisions in support of national goals and performance measures Significant expansion of the TIFIA credit assistance program - $1 billion, increases maximum share of projects from 33% to 49% MAP-21 Highlights/Themes September 12, 2012| MassDOT Office for Transportation Planning |

MAP-21 Highlights/Themes Continued Re-calibrates distribution formulas for several core transit programs Requires recipients to develop Transit Asset Management Plans/Systems Requires reasonable access for private intercity/charter bus operators to federally funded facilities (ITCs, park & ride lots and bus only highway lanes) Expands the use of performance measures and targets to evaluate transit system condition and performance September 12, 2012| MassDOT Office for Transportation Planning |

MAP-21 Funding Estimated Highway Apportionment Levels Program FFY 2012 FFY 2013FFY 2014 Total Highway Apportionment - All States$ 37,476,819,674 $37,798,000,000 Total Highway - Massachusetts$ 588,290,944 $ 588,290,994$ 593,332,710 National Highway Performance Program -$322,999,805$325,734,242 Surface Transportation Program-$148,569,769$149,827,524 Highway Safety Improvement Program -$35,494,484$35,794,972 CMAQ Program-$61,090,663$61,607,842 Transportation Alternatives Program-$11,564,595$11,723,886 Metropolitan Planning-$8,571,678$8,644,244 September 12, 2012| MassDOT Office for Transportation Planning |

Consolidation of the Highway Program National Highway Performance Program (NHPP) Consolidates the Interstate Maintenance (IM) and National Highway System (NHS) programs and the on-system portion of the Highway Bridge Program Provides funding support focused on improving the condition and performance of the NHS States are required to set performance goals to improve the condition & performance of the NHS consistent with National Goals and performance management measures promulgated by the Secretary Surface Transportation Program (STP) STP’s broad project eligibility is further expanded Includes off-system bridges as well as certain consolidated programs authorized under the new Transportation Alternatives Program including enhancements, recreational trails, ferry boats and terminal facilities, safe routes to school, and adds a new category “boulevards and other roadways largely in the right of way of former Interstate routes and divided highways” 50% of TA funds are sub allocated to MPOs over 200K to operate competitive grant programs September 12, 2012| MassDOT Office for Transportation Planning |

Consolidation of the Highway Program Congestion Mitigation and Air Quality Program (CMAQ) Remains largely intact under MAP-21. Funds highway and transit projects that reduce congestion and improve air quality. Removes current prohibition on use of CMAQ for construction of single-occupancy vehicle lanes. Performance metrics and standards for CMAQ will be set by the Secretary Highway Safety Improvement Program (HSIP) Funding is doubled and most existing requirements have been retained. To obligate HSIP funds, each State must have a performance-based strategic highway safety plan and have a highway safety improvement program in place. The Federal share of projects remains 90%. Performance metrics and standards for HSIP will be set by the Secretary September 12, 2012| MassDOT Office for Transportation Planning |

More on Transportation Alternatives Nine Eligible TA Activities 1. construction, planning, and design of on-road and off-road trail facilities for pedestrians, bicyclists and other non-motorized forms of transportation, including sidewalks, bicycle infrastructure, pedestrian and bicycle signals, traffic calming techniques, lighting and other safety-related infrastructure, and transportation projects to achieve ADA compliance 2. construction, planning, and design of infrastructure projects and systems that provide safe routes for non-drivers, children, older adults and individuals with disabilities 3. conversion and use of abandoned railroad corridors for pedestrians, bicyclists and other nonmotorized users 4. construction of turnouts, overlooks, and viewing areas 5. inventory control & removal of outdoor advertising 6. Historic preservation & rehabilitation of historic transportation facilities 7. Vegetation management within transportation ROW to improve safety, prevent invasive species and provide erosion control 8. Archaeological activities associated with project impacts 9. Any environmental mitigation activities - definition is expanded from stormwater runoff and wildlife mortality A fundamental shift in program focus under MAP-21 form strictly enhancing the transportation system to inclusion of planning, design and construction associated with compliance with existing federal regulations September 12, 2012| MassDOT Office for Transportation Planning |

Transportation Alternatives (continued) Previous enhancement activities not eligible under MAP-21 pedestrian & bicycle safety and education programs acquisition of scenic/historic easements and sites scenic or historic highway programs (tourist & welcome centers), and establishment of transportation museums Suballocation 50% 0f the state’s apportioned TA funds will be suballocated to MPO’s >200k in population MPO’s have authority select & award funding from its suballocation to eligible project within its boundaries through a competitive selection process Eligible TA entities Local governments RTA’s and other transit agencies Natural resource and public land agencies Schools, school districts and LEA’s Tribal governments Other local/regional governmental entities with responsibility for recreation trails (other than MPO’s or state agencies) September 12, 2012| MassDOT Office for Transportation Planning |

MAP-21 Highway Funding Distribution How it Works States are guaranteed a 95% rate of return on their HTF contributions Once States receive their formula highway apportionment, the CMAQ and Metropolitan Planning set asides are taken “off the top” based on FFY 2009 below-the-line distribution percentages The balance funds are distributed to the remaining three major core MAP- 21 highway programs as follows: National Highway Performance Program % for projects on NHS facilities that support national performance goals Surface Transportation Program % to improve the condition and performance of Federal-aid highways & bridges on any public road Highway Safety Improvement Program - 7 % for projects that improve the safety of road infrastructure September 12, 2012| MassDOT Office for Transportation Planning |

National Goals 1. SAFETY —To achieve a significant reduction in traffic fatalities and serious injuries on all public roads. 2. INFRASTRUCTURE CONDITION —To maintain the highway infrastructure asset system in a state of good repair. 3. CONGESTION REDUCTION —To achieve a significant reduction in congestion on the National Highway System. 4. SYSTEM RELIABILITY —To improve the efficiency of the surface transportation system. 5. FREIGHT MOVEMENT AND ECONOMIC VITALITY —To improve the national freight network, strengthen the ability of rural communities to access national and international trade markets, and support regional economic development. 6. ENVIRONMENTAL SUSTAINABILITY —To enhance the performance of the transportation system while protecting and enhancing the natural environment. 7. REDUCED PROJECT DELIVERY DELAYS —To reduce project costs & accelerate project completion by eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies’ work practices. September 12, 2012| MassDOT Office for Transportation Planning |

Additional Highway Program/Policy Provisions Establishes a National Bridge and Tunnel Inventory and Standards program which essentially replaces the current Highway Bridge Program – requires an asset inventory, risk based assessment for safety/ serviceability, and development of a priority system for preventative maintenance, rehabilitation, and replacement of assets Establishes a National Freight Policy but not a funded freight title. Designates a primary national freight network up to 30,000 miles and requires the development of a national freight strategic plan Increases the federal share for freight mobility projects from state freight plans – from 80% to 90% for non-interstate projects and from 90% to 95% for projects on the interstate system Freight mobility projects are eligible for funding under the Projects of National and Regional Significance program which is extended under MAP-21 for FFY 2013 only at $500 million – this program is paid for through a General Fund authorization. Continues the Ferry Boat and Terminal Facilities Program at $67 million annually but re- categorizes the program as a formula program within the new Transportation Alternatives program Redefines and modernizes the Metropolitan and Statewide Planning Process by moving to a performance-based process September 12, 2012| MassDOT Office for Transportation Planning |

The MPO Planning Process The process will establish and use a performance-based approach to investment decision making and will consider projects and strategies that: Support the economic vitality of the MPO region by enabling global competitiveness, productivity and efficiency Increase the safety and security of the transportation system for all users Increase the accessibility and mobility of people and freight Protect and enhance the environment, promote energy conservation, improve the quality of life and promote the consistency of transportation investments with economic development patterns Enhance the integration and connectivity of the transportation system across and between modes for people and freight Emphasize preservation of the existing transportation system September 12, 2012| MassDOT Office for Transportation Planning |

MAP-21 Funding Estimated Transit Apportionment Levels Program FFY 2012 FFY 2013FFY 2014 Total Transit Apportionment - All States$ billion$ billion$ billion Formula Urbanized Area Grants - Sec. 5307, 5336 $4.459 billion$4.398 billion$4.459 billion Bus and Bus Facilities Formula $984 million Competitive/discretionary $442 million$427.8 million Fixed Guideway Capital Investment Grants (New Starts) $1.955 billion$1.907 billion High Density/Growing States Sec Formula million $518.7 million $525.9 million Rural Area Grants Sec $547.3 million$599.5 million$607.8 million State of Good Repair (SGR) Grant Program Competitive/discretionary $2.136 billion$2.166 billion High Intensity Motorbus SGR Program – 2.85% set aside from SGR -$60.9 million$61.7 million Total Transit – Massachusetts tbd September 12, 2012| MassDOT Office for Transportation Planning |

Changes to the Transit Program Bus and Bus Facilities and SGR become formula programs JARC is folded into the Section 5307 Urbanized Area formula program Elderly and Disabled (Sec. 5310) and New Freedom (Sec. 5317) are combined under a single Section 5310 program to enhance the mobility of seniors and individuals with disabilities A new State of Good Repair Program replaces the current Fixed Guideway Modernization program – new formula to apportion funds Establishes a High Intensity Motorbus State of Good Repair Program – SGR set aside for public transportation projects on facilities with HOV lanes New Starts – process is reformed and streamlined, alternative analysis step is dropped and limits are placed on the number of years a project can be in the process. Programs of interrelated projects are now eligible. September 12, 2012| MassDOT Office for Transportation Planning |

Changes to the Transit Program (continued) Allows systems in urbanized areas >200k to utilize portions of 5307 funding on operating assistance if the system operates fewer than 100 buses during peak service Eliminates the Clean Fuels Formula Program and the Transit in the Parks Program Expanded use of warrants to receive automatic ratings for qualifying projects with New Starts shares less than $100 million or 50% of total project costs Requires MPOs to establish performance targets for transit safety and state of good repair Establishes a pilot program to fund planning efforts for Transit-Oriented Development Projects (TOD) - $10 million annually for FY 2013 and FY 2014 September 12, 2012| MassDOT Office for Transportation Planning |

Okay, Now What? While the new surface transportation bill authorizes programmatic and streamlining reforms and a new array of consolidated transit and highway programs, Congress approves final funding authorizations through the annual budget appropriations process Ordinarily the FFY 2013 THUD appropriations bill would need to be passed by Congress by September 30, 2012, however a 6-month continuing resolution is likely to be passed this month authorizing MAP-21 programs through March 2013 only U.S. DOT’s modal administrations, FHWA and FTA need to develop MAP-21 implementing regulations and publish Notices of Proposed Rulemaking in the Federal Register for review and comment by state DOTs, MPOs, the public and other transportation stakeholders – it’s imperative that this happen quickly given the limited 2-year authorization of programs The bill stipulates that U.S. DOT shall promulgate performance measures associated with the attainment of national goals (for NHPP, HSIP, CMAQ, Transit and Freight) in consultation with States, MPO’s, RTA’s and stakeholders within 18 months of MAP-21 enactment References to the “date of enactment” should be understood to mean October 1, 2012 September 12, 2012| MassDOT Office for Transportation Planning |