BRIDGE DESIGN & RATING REPORTS TECHNICAL ADVISORY GROUP (RTAG) Amjad Waheed, PE 2014 RADBUG Presentation Traverse City, Michigan August 13, 2014.

Slides:



Advertisements
Similar presentations
CIEG 301: Structural Analysis
Advertisements

Page 1 of 11 Lessees can submit individual Unit Values for their Production Entities if they do not want to utilize the default unit value. If no Unit.
Section 1: Process to create EAS Interface File  DoD Batch and Timecard Status Report  DoD Employee Missing Payroll Data Report  Distribute Labor Cost.
T4. DESIGN OF TIMBER COLUMN (axial compression) T4. Design of timber column page 1. Timber framed building Floor plan Section Example: Checking column.
Special Education Student Information System Project New York City Department of Education | Special Education Student Information System Project 1 SESIS.
RAM Frame Release (January 2010) Bulent N. Alemdar, Ph.D., P.E. SR Software Product Research Engineer.
AASHTOWare Bridge Update
Informationive Report. Definition:  A report where only facts are given; no conclusions; no recommendations  A summary is often included at the end.
The Application for Renewal Accreditation: Electronic Submissions.
Page 1 of 21 This module will describe the procedure for a Metis Bid Request and how to upload the Metis supporting documentation. Welcome To the ETS –
Design and Rating for Curved Steel I- and box-girder Bridge Structures
Virtis/Opis Technical Update Virtis Opis Bridgeware User Group 2011 Conference Helena, Montana 1.
© 2009 Bentley Systems, Incorporated Steve Willoughby, Bentley Systems Bridge Product Specialist LEAP Bridge: Product Update and Direction.
Virtis-Opis Update Virtis-Opis User Group Training Meeting Helena – August 2011.
Todd Thompson, PE – SD DOT AASHTOWare Bridge Task Force, Chair Presented to the RADBUG Traverse City, MI August 12, 2014.
Integrating Access with the Web and with Other Programs.
Oracle Assets Release 12 Enhancements SM. Copyright © 2007 Chi-Star Technology SM -2- High-Level Overview Subledger Accoutning Enhanced Mass Additions.
Customizing Outlook. Forms Window in which you enter and view information in Outlook Outlook Form Designer The environment in which you create and customize.
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
1 Shared Financial Systems WISDM2 Difference Training October 2006.
Tutorial 5: Working with Excel Tables, PivotTables, and PivotCharts
1 ADVANCED MICROSOFT WORD Lesson 15 – Creating Forms and Working with Web Documents Microsoft Office 2003: Advanced.
2013 Design Rating User Group Presentation Virginia Beach, Virginia August 8, 2013.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
AASHTOWare Bridge Rating – Curved Girder Module
Carolina Environmental Program UNC Chapel Hill The Analysis Engine – A New Tool for Model Evaluation, Sensitivity and Uncertainty Analysis, and more… Alison.
Oracle Assets Release 12 Enhancements. High-Level Overview Subledger Accounting Enhanced Mass Additions Interface Auto-Prepare Mass Additions Flexible.
10 Adding Interactivity to a Web Site Section 10.1 Define scripting Summarize interactivity design guidelines Identify scripting languages Compare common.
SALESFORCE.COM SALESFORCE.COM
Medicaid Allowable Expenditure Report- MAER Amy Kanter, SBS Auditor Michigan Department of Health and Human Services 2015 MDHHS SBS Conference – Traverse.
Using Templates to Increase Efficiency
GTSTRUDL 27 This latest version of GTSTRUDL includes numerous new features, feature enhancements, error corrections, and prerelease features. GTSTRUDL.
1 AASHTOWare Bridge Technical Update AASHTOWare Bridge Rating/Design User Group Training Meeting Traverse City – August 2014.
Karen Herter (HMG) Mike Langley (DGS) April 15, 2008 Portfolio Manager for California State Buildings Meeting the Requirements of Executive Order S
What’s New in SEER-H 7.3 The Galorath Team. New Features Currency and Exchange Rate (with Multi-Currency option) Addin Enhancement Local Quantity, Schedule.
Virtis-Opis Beta Testing Todd S. Thompson, PE South Dakota DOT Office of Bridge Design August 3, 2011.
AASHTOWare Bridge Design and Rating TAG Overview RADBUG Traverse City, Michigan August 2014.
SuccessMaker. Where are they? Math: Intranet On a server at Vanhoose Reading Web-based.
Pasewark & Pasewark 1 Access Lesson 5 Creating and Modifying Reports Microsoft Office 2007: Introductory.
Tulkarem Multipurpose Sport Hall Prepared by: Moatasem Ghanim Abdul-Rahman Alsaabneh Malek Salatneh Supervisor: Dr. Shaker Albitar.
CE 382 Structural Analysis
1 TRI-MEweb: The Future Is Now Juan Parra Washington DC November 3, 2010.
Analysis Stages in GSA and Construction stage analysis using GSA Thomas Li, Thomas Ward & Chris Kaethner 30 June 2010.
Bridge Design Implementation Jeff Olsen, PE – MT DOT AASHTOWare Bridge Task Force
GTSTRUDL Using the GTSTRUDL Base Plate Wizard Example of Creating and Analyzing a Base Plate Rob Abernathy CASE Center GTSUG June, 2009 Atlanta, GA.
Design and Rating for Curved Steel I- and box-girder Bridge Structures
COMPREHENSIVE Access Tutorial 3 Maintaining and Querying a Database.
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
A Load Rating of a 3 Span Continuous Deck-to- Through Truss Bridge in Br|R AASHTOWare BrDR 2013 User Group Meeting A Load Rating of a 3 Span Continuous.
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
Pasewark & Pasewark 1 Access Lesson 5 Creating and Modifying Reports Microsoft Office 2007: Introductory.
ENGR 211 Bridge Design Project
Social Science Research Design and Statistics, 2/e Alfred P. Rovai, Jason D. Baker, and Michael K. Ponton Modifying Tables PowerPoint Prepared by Alfred.
User Interface Improvements AASHTOWare Bridge Design/Rating User Group Training Meeting Virginia Beach – August 2013.
Analyzing Redundancy in Bridge Deck Superstructures Using Finite Element Modeling By Whitney Hill Mentor: Dr. William McCarthy.
Labcheck Next Generation Quick Start Guide Distributions.
To the Unit Agreement Exhibit A Unit Tract Revision Online Training Course The purpose of this course is to provide guidance and information to ETS clients.
SP5 - Neuroinformatics 3DSomaMS Tutorial Computational Intelligence Group Technical University of Madrid.
Airplane Hangar Design The design of a steel-framed airplane hangar Matthew Klein Edward F. Cross School of Engineering, Walla Walla University, College.
Green Office Program Introduction RESOURCE MANAGEMENT &
QMS Quotation Management System.
What’s New in I-Hub for ADP Workforce Now
Welcome! Crown Mineral Activity To the ETS – Crown Mineral Activity
Course Preparation Check List
OPENING REMARKS 2019 Rating & Design Bridge User
AASHTOWare Bridge Task Force
AASHTOWare RADBUG Meeting July 30-31, 2019 South Lake Tahoe, CA
Batch Analysis of BrR Models
Presentation transcript:

BRIDGE DESIGN & RATING REPORTS TECHNICAL ADVISORY GROUP (RTAG) Amjad Waheed, PE 2014 RADBUG Presentation Traverse City, Michigan August 13, 2014

PURPOSE/GOAL Produce reports/results in AASHTOWare Bridge Design and Rating Programs to satisfy Users’ needs

RTAG MEMBERS 1BeckieCurtis Michigan DOT 2CindyWang Ohio DOT 3ArthurD’Andrea Louisiana DOT 4ToddThompson South Dakota DOT 5PaulCampisi New York State DOT 6JeffOlsen Montana DOT 7AmjadWaheed Ohio DOT

RTAG UPDATE (SINCE RADBUG 2013)  Report submitted to BrDR TF in November 2013  Report has 25 recommendation to improve the reports  TF asked the contractor to review the recommendations and prepare estimates  The Baker (contractor) submitted their responses and estimates (some) to the TF in June 2014

1.Naming convention for the reports be made standardized & meaningful. 2.Provide a list of all reports with short introduction in the help menu. 3.Provide option to include the name of the rater and the date of report generated in the report header. RTAG Recommendations

4.Show Bridge ID/Bridge Alternate/Structure ID/Structure Alternate in the report header 5.Control Options & default values used in the analysis should be shown & labeled accordingly in the reports 6.Create a summary report of load ratings of all current and existing “Bridge Alternates.” pages concise rating summary report.

8.A comprehensive report to re-create a bridge data file without going through bridge plans. 9.The reports generated in the BrDR programs should display which elements of the bridge had been checked 10.List dead loads in separate columns (e.g., DC & DW should be in separate columns).

11.List deflections due to parts of dead and live loads separately 12.List live load alone and L+I load moments and shears separately. List impact factor on all reports that include impact of the live load 13.Live load forces should be clearly labeled if they are distributed or not distributed.

14.Provide a list of report parts at one place to create a la carte reports (“smart reports”). Provide a report tab listing all the reports. 15.Provide separate Spec Check Reports of passed and failed checks. Hyperlinks are good & recommended. 16.Provide all essential cross-section properties at critical points

17.Summarize moments/shear/axial forces for various components 18.Option to upload a logo file (jpg/png/gif) in the report header 19.Enhance truss reports 20.Give option to generate output reports in the PDF format at member and bridge levels 21.Some headers and other formatting of the XML reports are needed to be revised

22.Include wind data in Substructure Design output report 23.Include eccentricity with the girder reactions in the Substructure 24.Provide moment, shear and axial force tables for all members of the culvert analyzed 25.Detailed/comprehensive reports at BE level. Modify the Bridge Rating Results report at BE level to include location of controlling rating factors & limit state.

 Estimated  Recommended for Modernization  Scope Required CONTRACTOR RECOMMENDATIONS 3 CATEGORIES

RTAG UPDATE  Modernization Meeting in Baker’s Office, Pittsburgh, PA, from July 29-31, 2014 Brainstorming of the modernization ideas Review of the Enhancement Bucket Lists Review of the User Interface  All Report Enhancements will be rolled into the Modernization

Amjad Waheed, PE Bridge Rating and Bridge Management Ohio Department of Transportation, CO 1980 W. Broad St., Columbus, OH Phone: