1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.

Slides:



Advertisements
Similar presentations
Tips to a Successful Monitoring Visit
Advertisements

Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Accel Computerized Maintenance Management System.
Course Material Overview of Process Safety Compliance with Standards
Quality Improvement and Control System QuIC ILYA NIKANOROV
The Implementation of Top Up Operation at the Australian Synchrotron Light Source Don McGilvery.
New Radiation Safety Interlock System for the SPring-8 Accelerator Complex C. Saji, M. Toko, T. Matsushita, R. Furuta, H. Hanaki, S. Hashimoto 1), Y. Hashimoto,
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Shielding Workshop S. Buda Personnel Protective Systems March 27, 2007.
F. Fernandez 28/10/ Ferran Fernandez WAO2014 Operators training experience at the ALBA synchrotron light source.
1 SESAME as International Research Lab by: Salman Matalgah Synchrotron-light for Experimental Science and Applications in the Middle.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Summary Role of Software (1 slide) ARCS Software Architecture (4 slides) SNS -- Caltech Interactions (3 slides)
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Quality Assurance/Quality Control Policy
Maintenance and Engineering Procedures and Tools at Soreq Applied Research Accelerator Facility I. Gertz, Y. Buzaglo, A. Grin, R. Michael, R. Raizman,
ONLINE AUTOMATION SOFTWARE FOR PWDS ( Palmyrah Workers Development Society ) Under the Guidance of Miss.V.Amuthavani M.Sc., M.Phil.,
Taking the Web to the Next Level. Current Web Issues  Not reaching target audiences  People can’t find the information they need  Too difficult to.
LCLS NEH Operational and User Safety Programs
Electronic Radiation Safety Work Control Forms at SLAC Zoe Van Hoover, SLAC AD Safety Officer 2012 Workshop on Accelerator Operations.
Old Policy – which no one ever seem to have heard of.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
SUKESHI MEHTA COORDINATOR, CHEMICAL SAFETY OFFICE OF RADIATION, CHEMICAL & BIOLOGICAL SAFETY FRIDAY OCTOBER 3 RD,
Data management in the field Ari Haukijärvi 2nd EHES training seminar.
Software Tools for Operations and Maintenance Planning Theo Larrieu, Steve Suhring.
1 Advanced topics in OpenCIM 1.CIM: The need and the solution.CIM: The need and the solution. 2.Architecture overview.Architecture overview. 3.How Open.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Training Advanced Photon Source Operators: From the Street to the MCR Joseph Sutton Assistant Chief of Operations Advanced Photon Source Argonne National.
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
March 2008EPICS Meeting in Shanghai1 KEKB Control System Status Mar Tatsuro NAKAMURA KEKB Control Group, KEK.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Light Source Reviews The BES Perspective July 23, 2002 Pedro A. Montano Materials Sciences and Engineering Basic Energy Sciences BASIC ENERGY SCIENCES.
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
1 BROOKHAVEN SCIENCE ASSOCIATES Redundancy Requirements for Critical Devices R. Casey August 8, 2007.
The Users Perspective on control systems (some truisms) Heiko Ehrlichmann, DESY.
ALS Operator Training Rick Bloemhard Operations Supervisor Advanced Light Source Lawrence Berkeley National Lab WAO 2012.
SharePoint Administrative Communications Planning: Dynamic User Notifications for Upgrades, Migrations, Testing, … PRESENTED BY ROBERT FREEMAN (
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Microsoft Dynamics ® NAV 2009 Service Management.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Information And Communication in Operation At GSI Uwe Scheeler operation department GSI Helmholtzzentrum Darmstadt Germany.
Slide 1/5 Safety of Operations Jefferson Lab operates the accelerators in accordance with the Accelerator Safety Order, DOE O 420.2B, guided by DOE G
Information System Analysis Implementation & Security.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Scientific data storage: How are computers involved in the following?
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Qualifications:  Graduate of BS Business Administration, Engineering, Marketing or equivalent.  With at least 3 years Planning experience in semiconductor.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Andreas Lüdeke, Trieste, 24. Sep., WAO '07 Operation Information Management at the Swiss Light Source Andreas Lüdeke of the Swiss Light Source at the Paul.
Pipeline Safety Management Systems
WHY VIDEO SURVELLIANCE
Operations Machine Simulator.
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Preliminary Decommissioning Plan for the Canadian Light Source
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Presented by Jon Pastuszynski, Lead M&D Engineer
CESR Vacuum System Monitoring and Component Quality Assurance
PLC-based control systems at SOLEIL - ICALEPCS 2017
THE AUSTRALIAN SYNCHROTRON ELECTRONIC LOG BOOK
You’ve bought a LIMS, now what?
The EPICS running envirionments in the five accelerator projects
1 Zoe Van Hoover 1 User Safety: Commissioning and Early Experiments NEH ARR User Safety: LCLS NEH Commissioning and Early Experiments.
Electron Beam Systems ETC and Methodology
WHY VIDEO SURVELLIANCE
Safety Program for LCLS Experiments
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different groups. Focus on internal communications and methods which increase operational effectiveness. Kenneth Osborne Advanced Light Source LBNL

2 Kenneth Osborne, 9/14/07 Advanced Light Source Synchrotron light source Approx. 40 beamlines 196.8m circumference. Linac and Booster ring are in the same building. Operated separately from other accelerators at the lab. 15 yrs old and currently being upgraded to 1.9 GeV Top Off injection

3 Kenneth Osborne, 9/14/07 Detail How ALS is structured for context in how the different groups communicate. Internal structure of the operations group. –Communications with Control Room to keep the ALS operating effectively Influences of the growth of online communication methods.

4 Kenneth Osborne, 9/14/07 External Groups External vs. Internal not clearly defined Safety Radiation Safety Building Construction and maintenance User services Beam line proposals Experiment proposals Other Laboratories

5 Kenneth Osborne, 9/14/07 User Groups Experimenters vary from permanent accelerator employees or temporary guests for a single day –Some beamlines useful for accelerator diagnostics Training needs Operations, technicians and engineers support both accelerator and experimenters.

6 Kenneth Osborne, 9/14/07 Internal groups Accelerator physics Engineering (including Technicians) –Mechanical, vacuum –Electronics –instrumentation –Controls –User support Beam Line Coordinators

7 Kenneth Osborne, 9/14/07 Beamline Coordination Beam Line Coordinators –Beamlines are at almost full capacity. –Work closely with users ensuring changes to experiments are done safely. –Help with many daily user needs. –Interface between users and control room for many items.

8 Kenneth Osborne, 9/14/07 Current challenges for ALS 15 year old machine. Control system is being slowly upgraded or replaced. Top off mode – booster upgrade in progress.

9 Kenneth Osborne, 9/14/07 Documents for communication Proposals, reviews and other documents for external (and internal) use. “ALS Procedure Center” maintains central internal reference documents for both technical reference and safety or regulatory purposes. Control Room Logbook Distributed electronic methods- Reference documents on separate servers maintained by each group.

10 Kenneth Osborne, 9/14/07 ALS procedure center Maintained on server Longer term documents Some are required for safety or regulatory purposes and archived. Others may be for operational or engineering reference only Many are reviewed regularly Very useful for training

11 Kenneth Osborne, 9/14/07 Control Room Logbook Center of Operations daily communication. Daily events to be recorded. Also used for Accelerator Physics or engineering communications. Archived for a long time. ALS implemented electronic log keeping four years ago.

12 Kenneth Osborne, 9/14/07 Electronic Log keeping Advantages Implemented 4 years ago at ALS Legible Accessible remotely from other offices or buildings for reading and posting Enables communication with Control Room for Physicists and Engineers Searchable

13 Kenneth Osborne, 9/14/07 Electronic Log keeping limitations Searching not effective if there are many routine entries concerning item.

14 Kenneth Osborne, 9/14/07 Electronic bulletin boards Useful to bridge between Procedure Center which are reviewed every 1 to 3 years and logbook which is updated by the minute. Maintained by many different groups. Control room could use a wiki type site to link and organize the information from different groups according to equipment or subject.

15 Kenneth Osborne, 9/14/07 Remote access and operations Remote operations is not available or necessary for ALS Online Control Room logbook Status display 2 beam quality monitors Some troubleshooting and machine setup are available remotely

16 Kenneth Osborne, 9/14/07 Challenges for the future Finish upgrade to continuous injection Adjust to new demands in this mode. –Personnel changes, not just operators. –Equipment concerns; running linac and booster ring continuously