Status of the n-XYTER and CBM-XYTER development line Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.

Slides:



Advertisements
Similar presentations
Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Advertisements

H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Multichannel readout system of inner tracker for NICA-MPD Rogov Victor AFI, JINR, Dubna Afi.jinr.ru.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
15. CBM Collaboration Meeting, GSI, Darmstadt, April 12–16, 2010 Status of Front End Electronics N-XYTER PCBs & Power Supply Volker Kleipa, GSI Darmstadt.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
J.M. Heuser — CBM Silicon Tracker 1 Johann M. Heuser, GSI Darmstadt CBM Collaboration Meeting JINR Dubna, 15 October 2008 CBMCBM Review of the first in-beam.
Test Results on the n-XYTER, a self triggered, sparcifying readout ASIC Christian J. Schmidt et al., GSI Darmstadt TWEPP 2007, Prague, Sept. 3. – 7.
Silicon Strip Readout and the XYTER Electronics Development Christian J. Schmidt et al., GSI Darmstadt 10th CBM Collaboration Meeting, Dresden, Sept. 24.
"Indian Participation in FAIR: Science and Technology"
Status n-XYTER and CBM-XYTER Christian J. Schmidt et al., GSI Darmstadt GSI, Darmstadt, Feb. 29 th 2008.
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
September 8-14, th Workshop on Electronics for LHC1 Channel Control ASIC for the CMS Hadron Calorimeter Front End Readout Module Ray Yarema, Alan.
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
3 rd Work Meeting of CBS-MPD STS, Karelia, 2009 Towards CBM STS Volker Kleipa, GSI Darmstadt.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Progress on STS CSA chip development E. Atkin Department of Electronics, MEPhI A.Voronin SINP, MSU.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
Self triggered readout of GEM in CBM J. Saini VECC, Kolkata.
Recent developments on Monolithic Active Pixel Sensors (MAPS) for charged particle tracking. Outline The MAPS sensor (reminder) MIMOSA-22, a fast MAPS-sensor.
Christian J. Schmidt 14th CBM Collaboration Meeting, Split, Oct. 6 – 9, 2009 CBM FEE Summary on CBM Technological Competence Buildup and Front-End ASIC.
Summary of the FEE Session Christian J. Schmidt JINR, Dubna, Oct. 17 th 2008.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
Development of the Readout ASIC for Muon Chambers E. Atkin, I. Bulbalkov, A. Voronin, V. Ivanov, P. Ivanov, E. Malankin, D. Normanov, V. Samsonov, V. Shumikhin,
CBM Silicon Tracking System. Microstrip Detector Module Assembly and Test V.M. Pugatch Kiev Institute for Nuclear Research GSI (CBM experiment), Darmstadt.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
N- XYTER Front-End Boards Christian J. Schmidt, GSI Darmstadt CBM STS Workshop, Karelia, June 1 – 4, 2009.
Results from first beam tests for the development of a RICH detector for CBM J. Eschke 1*, C. Höhne 1 for the CBM collaboration 1 GSI, Darmstadt, Germany.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
ASIC Activities for the PANDA GSI Peter Wieczorek.
Status of the n-XYTER testing Knut Solvag, Gerd Modzel, Christian Schmidt, Markus Höhl, Andrea Brogna, Ullrich Trunk, Hans-Kristian Soltveit CBM.
LHCb Vertex Detector and Beetle Chip
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Readout Architecture for MuCh Introduction of MuCh Layout of Much ( proposed several schemes) Read ASIC’s Key features Basic Readout chain ROC Block Diagram.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
N- XYTER Front-End Boards Christian J. Schmidt, GSI Darmstadt 13. CBM Collaboration Meeting, GSI, Darmstadt, March 10 – 13, 2009.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Albuquerque 1 Wolfgang Lohmann DESY On behalf of the FCAL collaboration Forward Region Instrumentation.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
The Silicon Tracking System of the CBM experiment FAIR 2014, Worms, October 2014 requirements and detector concept system performance prototype.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
H. Krüger, , DEPFET Workshop, Heidelberg1 System and DHP Development Module overview Data rates DHP function blocks Module layout Ideas & open questions.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
The STS-module-assembly:
DAQ ACQUISITION FOR THE dE/dX DETECTOR
n-XYTER Hybrid Developments
Progress with System Integration of the CBM Silicon Tracking Detector
Ivan Peric, Christian Kreidl, Peter Fischer University of Heidelberg
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
TK Upgrade report.
DTS Fields of Interest POF IV
Status of n-XYTER read-out chain at GSI
The digital read-out for the CSC system of the TOTEM experiment at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Status of the n-XYTER and CBM-XYTER development line Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 n-XYTER, current workhorse chip for prototyping workhorse readout chip for detector prototyping architectural example front-end for DAQ development (self triggered, data driven) sample ASIC for technological front-end electronics hybrid developments bonding technology, circuit board technology thermal management, active cooling concepts power management (integraly high currents, low voltage, high B-fields, high rad. environment) very dense mechanical boundary conditions

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 "Simple" FEB for the n-XYTER Starter Kit A simple hybrid PCB with signal fan-in, ADC and interconnect to SysCore DAQ chain Allow development of the DAQ chain Allow the readout of various detector prototypes Allow to explore the challenges of hybrid development The September beam time has shown the whole signal chain operative! Silicon Strip / GEM Gas Detectors --- n-XYTER --- SysCore DAQ System

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 n-XYTER FEB: At the limits of PCB-technology Chip-In-Board solution avoids space eating vias allows pitch adaptation: 50,7 µm on chip to PCB side 101,4 µm on two levels Interference point of many technologies, each imposing limiting boundary conditions:

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 n-XYTER FEB: At the limits of PCB-technology 100 µm pitch on PCB is at the limit of PCB technology! landing area for bonds comes out much smaller than 50 µm high yield wire bonding technology finds limits at ~65 µm landing space Chip-In-Board technologically impeeds use of cooling vias Unplugged vias spoil bonding structures Plugged vias spoil bonding surface quality Current Solution: Macroscopic metal inlay underneath the chip realized after PCB manufacturing will give thermal link to cooling infrastructure FEB-Rev B FEB-Rev C  Realize 125 µm pitch on PCB at the expense of more complicated fan-out bonding with Chip-In-Board, two layer bonding and metal in-lay cooling contact  FEB-Rev D

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 It is all a question of yield! PCB-Technology 50µ / 50µ shatteres yield close contact to manufacturer special solutions (Chip in Board) metal inlay solution Wire Bonding Technology: Maximum bond length ~ 4 mm Staggered fan-out complicates bonding Bonding machine determines specs on dimensions of landing space Home made issues: -- Cooling strategy: Wire bonds demand cooling from below Flip-Chip bump bonds may allow cooling from either side -- Limitations on Orcad layout tool -- On Chip bond-pad layout

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 STS specific hybrid developments Hybrid for STS Ladder Modules Combined challenges of high density chip assembly needs sensitive microcable detector interconnect integrated cooling integrated powering scheeme in high magnetic fields and rad. env. Temptatively, a completly different technology comes into play: Silicon based circuit board flip chip assembly of XYTERs high efficiency cooling contacts and hybrid stackability tap bonding for micro-cables (V. Pugatch, Kiev) separated potential domain for upper and lower side det. readout (see STS meeting for more details)

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 Activities in Heidelberg: Preparation of n-XYTER engineering run n-XYTER prototype showed a large temp. coeff. due to unmatched circuitry assembled from different labs (DETNI collaboration). The correction of it is the major modification currently realized. A process more suited for mixed signal designs will be employed Rearranged bond-pad lay-out will faciliate bonding Enhanced on-chip shielding will inhibit cross-talk and inter circuit feed-back two versions of dynamic range ( e, e) will widen scope of applications Hans K.Soltveit, Physik. Inst. Heidelberg An Engineering Run of the n-XYTER will supply us with chips for detector prototyping activities! Towards this production, some issues may be addressed.

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 TEMPERATURE SENSITIVITY FAST SHAPER Reworked (preliminary) TYPICAL RESPONSE Peaking time: ~35ns Conv.gain: 59.7mV/fC Noise: Negative temp. coefficient Positive temp. coefficient New Hans K.Soltveit, Physik. Inst. Heidelberg Additional compensating circuitry added to undo former TC-mismatch

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 TEMPERATURE SENSITIVITY FAST-SHAPER OUTPUT DC-LEVEL TEMP(°C) Old TEMP.COEFF. ~29 mV/°C Config for negative input signals NEW: TEMP.COEFF. ~0.7 mV/°C Config. for positive input signals NEW: TEMP.COEFF. ~0.5 mV/°C Hans K.Soltveit, Physik. Inst. Heidelberg

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 Time Line towards the engineering run Temperature compensation also realized on slow shaper energy signal chain! Currently: Extensive corner analysis on new schematics Beginning of November: Review on schematical modifications Until the end of the year: Layout modifications Beginning of Jan.: Submission readiness review Jan to Feb.: Submission to AMS

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 Midterm and Beyond, the CBM XYTER Exploit detector prototyping experiences Self triggered architecture Rates adapted Radiation hard On chip energy conversion Efficient, low lead-count serialized data transfer DC-coupled double sided Silicon readout A dedicated CBM-XYTER development gets on its rails...

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 CBM-XYTER Family Planning CBM-STS-XYTER minimize power realize dc-leakage compensation compact, high channel density MIP sensitivity in Si dense mounting CBM-TRD-XYTER high resolution needs (8 to 9 bit) lower channel density next neighbor forced trigger logic? ion tail cancellation facilities baseline restauration lower occupancy MUCH needs are somewhere in between. Preferably adopt these specs within one of the two! (see V. Niculin) MUCH needs are somewhere in between. Preferably adopt these specs within one of the two! (see V. Niculin) Both XYTER chips will employ common rad. hard library and common design blocks for the readout FiFo and MUX (data sparcification and de-randomization), slow control interface, data transfer serializers, testability features and clocking and time stamp generation.

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 CBM-STS-XYTER Robert Szczygiel and Pawel Grybos (AGH Krakow) will realize the job. They share experience on the n-XYTER development within DETNI) Pre study ongoing MIP sensitivity with around e dynamic range 128 channels, high density Time over threshold (TOT) architecture extremely power saving due to less architectural overhead low resolution needs, 4 to 5 bit low demand on silicon real estate Particular demands on S/N for clean discrimination

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008 CBM-TRD-XYTER Peter Fischer et al. (ZITI Heidelberg) will realize this chip, Vasili Catanescu (NIHAM Bucharest) adds a proposal for the front-end (see Mihai Petrovici on current test chip preparation) The specific architectural needs for the TRD-XYTER have not entirely crystalized yet. We intend to have a concerted workshop in Dec with detector physicists and electronics engineers.... to work out the TRD-XYTER spec-frame Our discussion on this meeting should give us guidance for the preparation of this workshop. Also, MUCH specifics should be collected to evaluate the feasibility of a combined TRD-MUCH-XYTER version.

12th CBM Collaboration Meeting, Dubna, Oct. 15th 2008