Walter Boltz, Chairman ERGEG Gas Working Group 16 th Madrid Forum, 29 May 2009 Storage Capacity allocation & congestion management Criteria to determine.

Slides:



Advertisements
Similar presentations
1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.
Advertisements

Second Asia Gas Buyers’ Summit Mumbai, 2-3 February 2004
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
1 XVI Florence Forum Jose Sierra Madrid, 4 June 2009 Chair, RIG ERGEG Electricity Regional Initiative Update & Progress.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
André Piérard, ERGEG Project Leader on Complaints Citizens’ Energy Forum, London, September 2009 Draft advice on Customer Complaint Handling, Reporting.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
Christina Veigl-Guthann, Chair of ERGEG Customer Empowerment Task Force Citizens’ Energy Forum, London, September 2009 Definitions of vulnerable.
Madrid Forum 15 October 2014 Massimo Ricci Chairman.
Rocío PRIETO – Comisión Nacional de Energía Benoît ESNAULT – Commission de Régulation de l’Energie LNG TF chairs 18th Madrid Forum Madrid, 27/28 September.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Erik Rakhou - Energiekamer 19th Madrid Forum 22 March 2011 Amendment of the Guidelines of Good Practice for Storage System Operators - Capacity allocation.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
IFIEC EUROPE 1 European gas market Where do we stand ? Peter Claes President - IFIEC Europe SVSE – 14 September 2005.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Directorate General for Energy and Transport Johannes ENZMANN European Commission DG Energy and Transport Unit Electricity and Gas GIE Annual Conference.
Ricardo CARDOSO DE ANDRADE, DG COMP B-1 6 September 2006 Competition Directorate-General Energy Sector Inquiry – findings and the way forward Presentation.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
Directorate General for Energy and Transport1 Ana Arana Antelo Head of Unit Electricty & Gas – European Commission/DG TREN GIE Annual Conference, ,
13 February 2007, Brussels Electricity Infrastructure Workshop Shaun Kent, co-chair Electricity Regional Initiative TF.
Jonas Törnquist EFET Gas Market Transparency Requirements ERGEG Enabler Group Meeting Dublin, April 2007 Törnquist.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Directorate General for Energy and Transport Johannes ENZMANN Administrator DG Energy and Transport European Commission GTE 2nd Annual Conference 23 September.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Johannes Kindler Florence Forum – 4/5 June 2009 Transparency & Trading Analysis of energy and financial regulators.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
The industrial consumer’s view IFIEC EUROPE 1 GTE 2 nd Annual Conference September 2004 Copenhagen Barriers to competition in the view of a consumer.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Johannes Mayer (E-Control), Chair ERGEG URB TF Karsten Bourwieg (Bundesnetzagentur), ERGEG URB TF Citizens’ Energy Forum, London, September 2009.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Rocío Prieto, Co-Chair CEER LNG TF 20 th Madrid Forum September 2011 Amendment of GGPSSO for CAM and CMP.
Capacity Allocation and Congestion Management Monitoring results & proposal for new measures Stefanie Neveling (BNetzA) Benoît Esnault (CRE) Madrid Forum,
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
ETSO-GTE Supporting a secure and liberalized European energy market A Joint Presentation by Mr Geert Joosten, GTE Mr Juha Kekkonen, ETSO 22 January 2003.
13th March 2009, Bilbao GLE Workshop on LNG ERGEG MONITORING GGPLNG Rocío Prieto.
Doug Wood GTE-CEER transit workshop Brussels, 24 January 2007 Doug Wood GTE-CEER transit workshop, 24 Jan 2007 European Federation of.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
Directorate-General for Energy and Transport Mark van Stiphout – C2 Electricity and Gas GSE Workshop on storage investment 24 May 2007 Policy framework.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
The 3rd package for the internal energy market
New transparency guidelines
Gas Transmission Europe
GSE worked with ERGEG on CAM/CMP since
Background and Process
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Gas balancing – where next
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
DRAFT DG TREN Staff Working Paper on LNG
XIIIth Madrid Forum (16th/17th October 2007)
EUROGAS LNG TASK FORCE Bilbao, 13 March 2009 Presentation by
ERGEG’s reaction on DGTREN LNG study results and policy conclusions
Presentation transcript:

Walter Boltz, Chairman ERGEG Gas Working Group 16 th Madrid Forum, 29 May 2009 Storage Capacity allocation & congestion management Criteria to determine access regime to storage

216 th Madrid Forum, 29 May 2009 Background  Improvement of storage access conditions ●Most European storages are fully booked ●Poor transparency on actual use of storage capacity and available capacity ●Capacity hoarding is without consequences ●This results in entry barriers for new entrants  ERGEG Status Report on CAM & CMP to storage published in December 2008  Assessment Report – Public consultation in August 2009  Guidelines on CAM & CMP on storage planned for 2010

316 th Madrid Forum, 29 May 2009 Structural problems identified Long term contracts play a major role in the storage market and impede competition, especially  when capacity is allocated via FCFS  when incumbents / affiliated companies are the main or sole users Level of competition between SSOs is quite limited due to little available capacity and severe geographical constraints Integration of storage operators and supply companies  Possible cross subsidies Dominance of FCFS as CAM:  FCFS gives wide range for discrimination, which cannot be verified  no legal competence for NRAs in developing CAM and CMP in most countries No incentives against hoarding, no effective legal requirements to discontinue hoarding

416 th Madrid Forum, 29 May 2009 GSE Survey and ERGEG Status Report 2008 Conclusion of the 15th Madrid Forum: “The Forum asked ERGEG and GSE to analyse in cooperation the apparent discrepancies in their reports presented at the Forum and report their findings to the next Forum” Meeting of ERGEG with GSE, Eurogas and EFET (invited) in February Differences identified: Agreement to jointly investigate storage users’ needs more thoroughly Eurogas, EFET, GSE and ERGEG questionnaire to storage users Results to be integrated in the ERGEG work on guidelines for CAM and CMP GSE surveyERGEG status report ScopeSSOsSSOs, users and NRAs SSOs coveredonly GSE members18 GSE and 11 non GSE members Effectiveness of CAM & CMPnot analysedanalysed (e.g. FCFS by incumbents)

516 th Madrid Forum, 29 May 2009 ERGEG update of work Joint questionnaire of ERGEG, Eurogas, EFET, GSE for storage users For collecting information on the competition situation and the main problems (with CAM and CMP) in the storage markets from the storage users´ point of view Remarks of GSE, Eurogas and EFET integrated in the questionnaire Addresses: from last survey, addresses of Eurogas and EFET members checked, Eurogas and EFET will send a mail to their members to participate in the survey Sending out the questionnaire on Thursday, 14th May 2009 Response time 5 weeks Results of the survey will be integrated in the assessment paper for CAM and CMP

616 th Madrid Forum, 29 May 2009 Assessment Report 2009 Assessment Report on different CAM & CMP to focus on Defining preconditions under which market situations the various mechanisms are appropriate – information sources  Eurogas, EFET, GSE and ERGEG questionnaire to storage users  Analysis of different national storage markets – Workshop with experiences from UK, Germany, Austria, Hungary, The Netherlands  Findings in economic literature  Assessment of CAM and CMP regarding criteria stated in the GGPSSO BUT assessment not only according to the mechanisms but also regarding the structural problems (integration of SSO and supply) the transport situation (harmonised capacity release for storage and transport, harmonised application of UIOLI) influence capability by NRAs on the competition Mid-August 2009 Public Consultation on Assessment Report

716 th Madrid Forum, 29 May 2009 Analysis of different storage markets I Hungary: rTPA, only 1 SSO competition in 2010 (2 SSOs) / 2012 (3 SSOs)  change to nTPA essential facility Germany: nTPA, 25 SSOs No regular information for the regulator on storage contracts Ex-post regulation in case of misuse No official complaints regarding TPA to storage facilities so far Existence of a variety of products, but very little capacity available Investment situation: new entrants tend to build their own storages

816 th Madrid Forum, 29 May 2009 Analysis of different storage markets II UK: SSOs choose mechanisms on their own – Ofgem can intervene (nTPA + undertakings; TPA arrangement under network code) Limit capacity held by Centrica to 20% (decrease over time with 15% floor) UIOLI: non-nominated capacity offered on bulletin board on an interruptible basis Interruptible space, injection and withdrawal available Capacity typically sold on a Day ahead and Within day basis 3 tiers of services: Price structure (from Rough website):

916 th Madrid Forum, 29 May 2009 Analysis of different storage markets III Austria: nTPA, FCFS applied by all SSOs ex post regulation in case of misuse (also monitoring of storage contracts) main flexibility tool in Austria, has no substitute in seasonal balancing The Netherlands: nTPA:  light  extended, in case of dominant positions (NAM, TAQA) main improvements to be made:  facilities are exempted for TPA because of ‘production tasks’ (SoS)  to which extent can (existing) storages be made available to the market

1016 th Madrid Forum, 29 May 2009 Criteria to determine access to storage Under the 3rd Package, Member States may choose between nTPA and rTPA (Art. 32 of new Gas Directive)  NRAs/MS define which criteria are the basis for the choosen TPA regime and publish which facilities or which part of those is offered under different procedures nTPA: NRAs/MS shall require SSO to publish their main commercial conditions for the use of storage  when developing these conditions, SSOs shall consult the system users rTPA: NRAs/MS shall take measures to give access to storage on the basis of published tariffs and/or other terms for use of storage  NRAs/MS shall consult system users when developing these tariffs or the methodologies for these tariffs

1116 th Madrid Forum, 29 May 2009 Duties and Powers of NRAs 3rd Package foresees the following tasks for NRAs regarding access to storage  Monitoring the correct application of the criteria that determine whether a storage facility falls under Article 32(3) or (4) – nTPA or rTPA  NRAs shall have the authority to require SSOs to modify the terms and conditions, including tariffs and methodologies proportionate and non - discriminatory

1216 th Madrid Forum, 29 May 2009 Possible criteria to assess competition I The following criteria should be assessed when determining the access regime to storage facilities:  Effective competitive behavior among SSOs (products, tariffs)  Alternative flexibility tools e.g. interruptible contracts, flexible import contracts/diversified sources  Sufficient available capacity for storage users - choice between several SSOs  Requested products are actually offered by several SSOs  Independence of SSOs by effective unbundling

1316 th Madrid Forum, 29 May 2009 Possible criteria to assess competition II Sufficient competition  nTPA Tariff benchmarking, tariffs reflect incurred costs Non-discriminatory and transparent CAM & CMP Insufficient competition  rTPA Cost-based tariff setting regime CAM & CMP to be approved by NRAs

1416 th Madrid Forum, 29 May 2009 Thank you for your attention! Mark your diary for the World Forum on Energy Regulation IV October 18-21, 2009 Athens, Greece