Status: Tritium Plasma Experiment at the INL Safety and Tritium Applied Research (STAR) Facility R. A. Anderl*, J. P. Sharpe*, R.D. Tillotson* (*INL) R.A.

Slides:



Advertisements
Similar presentations
Heating, Ventilating, and Air-Conditioning
Advertisements

Heating, Ventilating, and Air-Conditioning
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
SANITARY DESIGN PRINCIPLES FOR FACILITIES. ZONES OF CONTROL.
Marketing ZEH... the Story of Nexus EnergyHomes Governor’s Housing Conference September 27,2013.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
Prepared by Farid Khalaf.  Protect the worker.  Protect the sample being analyzed.  Protect the environment.
Objectives: Understand importance of utility and maintenance system in industry/plant.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Chemical Fume Hood  A type of local ventilation device that is designed to limit the user's exposure to hazardous or noxious fumes, vapors or dusts.
Get Ready: Changes Impacting the Water Heater Marketplace George M. Chapman Senior Program Manager Consortium for Energy Efficiency © 2015 Consortium for.
WBS Tokamak Exhaust Process
FACILITIES AND PROPERTY MANAGEMENT – BEMS Plant and Equipment Operating Hours.
RETScreen® Energy Efficiency Projects
Proposal for Convection Absorber Test with Hydrogen at Fermilab Barry Norris Representing colleagues in BD/Cryogenics February 21, 2003.
TCS3 Telescope Operators area with TCS1 (about 2006) and TCS3 in Feb 2009.
NOvA Water Cooling System Erik Voirin, Mike Zuckerbrot Erik Voirin; Mike Zuckerbrot1NOvA Water Cooling System.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Patrick Thornton, SNS/FPE June 9, 2008
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Eliminating and Controlling Dust & Noise Hazards July 2002.
Visualization of CONCERTO Data Dan Gutu Prof. Andreas Wagner Workshop on data status and first CONCERTO Premium results Brussels, October 23 rd 2012 Karlsruhe.
NUMI NuMI Review of the Infrastructure – W, G & V 20 July 2001 WBS Page 1 1 Infrastructure Review - W.B.S Water Systems Water Systems –Upstream.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
GIF++ gas systems 21/01/2014Ernesto, Roberto PH-DT-DI gas service1.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Monthly Management Report Submitted By Facility Management Team
ITER test plan for the solid breeder TBM Presented by P. Calderoni March 3, 2004 UCLA.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Work Plans for FY06 Sandia National Laboratories Michael Ulrickson Presented at PFC Technology Meeting May 9-11, 2005 At PPPL Sandia is a multiprogram.
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
The RPC Closed loop Gas System Slides from Bianco and Guida.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
GIF++ gas systems 11/07/2014Ernesto, Roberto PH-DT-DI gas service1.
Solar Options The “Greening” of Local Communities.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Hydrogen Fuel And its place in our future. Some Chemistry 2 H 2 + O 2 2 H 2 O kJ.
Overview of the Safety and Tritium Applied Research (STAR) Facility Phil Sharpe Fusion Safety Program Idaho National Laboratory, USA HAPL Program Meeting.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
Fuel Cycle Research Thrust Using A Full Fusion Nuclear Environment
Yolo County Planning, Resources and Public Works Department 1 Landfill-based Anaerobic Digestion Compost Pilot project at Yolo County Central Landfill.
Cooling Test Results on fuzzy carbon substrate Setup in Lotima Room Used water/glycol mix (70/30 by wt) Neslab chiller to set temp Small pump to get the.
Chapter 1: Diagrams for Understanding Chemical Processes
Easy FlowTM and Smart FlowTM
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
ALD Technology Transfer – Progress Update LAPPD2 Godparent Review Aileen O’Mahony 5 th April 2013.
Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Update on the PSB Cooling and Ventilation Systems
Cryoplant Controls Installation
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
Hydrogen System Update
St. George Infrastructure
Heating, Ventilating, and Air Conditioning
Heating Ventilating and Air Conditioning
Heating, Ventilating, and Air-Conditioning
The 10 Principles of Sanitary Design for Equipment
VLT Meeting, Washington DC, August 25, 2005
Overarching Commissioning Plan
LEBT water cooling system
Presentation transcript:

Status: Tritium Plasma Experiment at the INL Safety and Tritium Applied Research (STAR) Facility R. A. Anderl*, J. P. Sharpe*, R.D. Tillotson* (*INL) R.A. Causey +, C.L. Kunz +,( + SNL) Session 5 Presentation at Plasma-Facing Components Meeting May 9-11, 2005 Princeton, NJ

Outline Re-assembly/installation activities System integration/testing activities Plans for initial plasma operation and experiments Tritium Plasma Experiment (TPE) Steady-state plasma generator Tritium and Be compatible Plasma density: /m 3 Plasma ionization fraction: 1-10% Ion flux: x10 22 /m 2 Ion energy: eV Target temperature: o C

TPE is located in the STAR Facility 15,000 Ci tritium limit Segregation of operations/ventilation Once-through room ventilation Gloveboxes and hoods Tritium cleanup system (TCS) Tritium storage and assay system (SAS) Tritium SAS Glovebox TCS Flibe-tritium experiment Flibe-corrosion experiment D ion implantation experiment Flibe preparation purification & testing Chemical reactivity experiment Tritium Plasma Exp Flibe Salt 2Lif-BeF 2 STAR Floor-plan Layout Glovebox exhaust manifold Tritium Stack monitor

TPE Re-assembly, Setup and Operation Re-assemble TPE in HEPA-filtered ventilated room Install utility services for TPE system in PermaCon room –Electrical, water, gas, effluent control, 3 H monitoring Interface TPE system to STAR utility services –Electrical, coolant systems, glovebox ventilation, TCS Check TPE components, update and test –Vacuum pumps, pneumatic valves/lines, control instrumentation, water lines, plasma source, power supplies, heaters, gas flow cont. TPE system integration and testing –Establish system vacuum; operate control instrumentation, power supplies, coolant and gas systems, and plasma source –Initiate plasma operation with hydrogen Initiate TPE experiments with hydrogen/deuterium plasmas Prepare for operation with tritium –Glovebox testing, purge gas control, TCS interface, U-bed installation, 3 H source Prepare ISMS documentation and procedures Green: completed, blue: partial comp., red: to do

TPE is in a HEPA-filtered ventilated room PermaCon enclosure housing TPE and ancillary equipment Auxilliary blower and HEPA filter for room ventilation.

Utility services for TPE Ventilation Neslab chiller Gas supply 3 H monitors Electrical TCS lines PermaCon service panel Electrical

Distribution of utility services inside the PermaCon Overhead electrical routing Heat exchangersScroll pump Electrical distribution Coolant mixers TPE glovebox

Plans and schedule for TPE set up and operation Complete TPE interface to utility services (May-05) –Component coolant system Complete testing of TPE components (May/June-05) –Pneumatic & water lines, coolant systems, control instrumentation, power supplies,plasma source, heaters, gas flow controllers Complete system integration & testing (June/July-05) –Establish system vacuum, integrated operation of all systems, initiate plasma operation with H Initiate TPE experiments: H or D plasmas (July-05) Complete preparation for 3 H operation (Sept.-05) –Glovebox testing, TCS interface, U-bed install Complete ISMS documentation and procedures for initial tests (June/July-05)