Achievements of the PRad Collaboration 1)All major target parts have been procured, some of them delivered to Jlab 2)We expect all target parts to be delivered.

Slides:



Advertisements
Similar presentations
Design and Prototype Test of SCINTILLATING FIBER TRACKER
Advertisements

HyCal reconstruction: current situation current situation and future tasks. V. Mochalov, IHEP (Protvino)
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
The HyCal Calorimeter A. Gasparian NC A&T State University, Greensboro, NC Outline  The crystal modules  The frame and transporter  Temperature stability.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
High Precision Measurement of the Proton Charge Radius A. Gasparian NC A&T State University, Greensboro, NC Outline  Previous experiments and proton size.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Online Reconstruction 1M.Ellis - CM th October 2008.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
MICE CMPB Alain Blondel 1 Highlights on MICE.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Gain stability and the LYSO beam radiation monitor measurements
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
CLAS12 Drift Chamber Prototyping
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
Status of E14 G.Y.Lim IPNS, KEK. E14 Experiment Step-by-step approach to precise measurement of Br( K L    ) KEK-PS E391a J-PARC E14 (Step-1) J-PARC.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
High Performance PbWO 4 - Lead Glass Hybrid Calorimeter at Jefferson Lab M. Kubantsev ITEP, Moscow, Russia/Northwestern University, Evanston, USA A. Gasparian.
NATIONAL INSTITUTE OF NUCLEAR PHYSICS Legnaro National Laboratories Numerical simulation strategy for the SPES FEBIAD ion source INFN – CISAS collaboration.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
SHMS Aerogel Detector Construction is complete
Jorge Sánchez-Quesada BE-RF-FB
Start Detector for pion experiments
Luminosity Monitor Status
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Open Tasks for PrimEx-II Run
ERL BPM System Mike Billing, Mark Palmer
A. Gasparian NC A&T State University, Greensboro, NC
PrimEx Preliminary Result (short status)
The PrimEx-I Experiment
Presentation transcript:

Achievements of the PRad Collaboration 1)All major target parts have been procured, some of them delivered to Jlab 2)We expect all target parts to be delivered to Jlab by September. 3)The target stands financially solid (see the MRI report). We will need some help from Jlab for the “Vacuum Box” and visitors sport for the HyCal Calorimeter. 4)Decision is made to use new front-edge electronics for the HyCal Calorimeter: based on FADCs (discussion with Sergey B.) 5)Decision is made for the DAQ system: based on new CLAC12 DAQ, with modifications (discussion with Sergey B.), a student is assigned for this project 6)We got our name (Prad) 1A. Gasparian

Tasks for the PRad Experiment 2 1)Construct the hydrogen gas flow target by the end of this year. a)Develop set of laboratory control measurements to ensure the target qualities before the beam tests (density, stability, …) b)Develop a minimum set of target control system for in-beam measurements (temperature, pressure, …) 2)Finalize and make available a common-use Event Generator with rad corrections for both ep and ee-processes, for our low Q 2 range (develop two independent codes, if all possible): a)optimize the geometry of the experiment (critically important, Vacuum Box) b)finalize the expected total error in extracted R p with different FF models in the market (critically important) 3)Design and construct the Vacuum Box 5)Design and construct new Veto Counters A. Gasparian 4)Prepare the HyCal Calorimeter for the experiment: a)new cabling for FADCs b)repair the Gain Monitoring System (LMS) c)repair optics, electric signals, power supplies, … d)install in the Transporter, engineering survey

Tasks for the PRad Experiment (cont.) 3 10)Ready for a beam tests in Fall, )Continue to Increase the size of the collaboration (more and capable groups, individuals, …) 6)Develop a new front-end readout and fast trigger electronics based on JLab’s new FADCs A. Gasparian 7)Develop a new independent fast DAQ system based on CLAS12 new developments 11)Ready for experiment in Spring/Summer, )Work with Hall B (especially with HPS group) to: a)optimize the installation process b)effective use of beam-line elements c)running versions