ERCOT RMR Contract Status Report Presented To The ERCOT Board Of Directors December 17, 2002 Sam Jones, COO.

Slides:



Advertisements
Similar presentations
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Advertisements

Regional Planning Group Charter Revisions May 2008.
Regional Planning Group Project
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Date Texas RE Board Update to TAC November 5, 2009 Susan Vincent Director, Legal Affairs.
Bert Lathrop Director, IT Infrastructure 10/6/2011 WAN Management Fee - Billing Changes.
Current Status Of The ERO Transition Activities To Comply With The 2005 EPAC ERCOT Board Meeting February 21, 2006 Sam Jones, COO.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
System Operations Staffing Request Presented to the ERCOT Board Of Directors By Sam Jones, COO November 16, 2004.
32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.
Update On The ERO Transition Activities To Comply With The 2005 EPAC ERCOT TAC Meeting March 9, 2006 Sam Jones, COO.
Board of County Commissioners May 8, Authorize staff to prepare a draft ordinance revising Chapter 37 of the Alachua County Code to include specific.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
RPG Meeting Five Year Plan Extension Brad Schwarz.
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
Land Development Regulations : Section 2 – Waivers (and related sections) Regulation Update Board of County Commissioners Hearing December 9, 2014 Continued.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
California Integrated Waste Management Board November 10, 2008 Item #2 Discussion And Request For Direction Regarding The Board's Fulfillment Of The Requirements.
Distributed Generation Task Force November 29, 2007 TAC Report.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
October 6, 2006 Public Stakeholder Review Portland, Oregon Conditional Firm.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
December 18, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott January 6, 2015 TAC Update to RMS 1.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
California Integrated Waste Management Board Update On Long-Term Postclosure Maintenance And Corrective Action Financial Assurances Activities Permitting.
1 Convention Center Authority Republican Policy Group Presentation March 23 rd 2015.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
Evaluation of Budget Process for Information Technology Projects Proposed Final Report February 16, 2006 Joint Legislative Audit & Review Committee Karen.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee October 9, 2003.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
System Operations Report To The Board Of Directors September 21, 2004 Sam Jones, COO.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Staff need to be transferred as part of a transaction with a client Is the transaction indicative of a “going concern” – a business or part thereof is.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Transition Plan Network Operations Model Change Requests 5/26/2010.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
Jan 22, TAC Report to the ERCOT Board January 22, 2003.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
Summary Overview: Maryland Straw Man Interconnection Rule Prepared by Brad Johnson* January 11, 2007 ACN Energy Ventures *National.
Clarification Meeting Provision of Car wash Services at Kusile Power Station Project 19 September 2014.
Distributed Generation Task Force
Supply Chain Management
Phase Angle Limitations
Mark Ruane Vice President, Credit and Enterprise Risk Management
2018 Recreational Black Sea Bass
Rent Comparability Studies Chapter 9 Updates
Presentation transcript:

ERCOT RMR Contract Status Report Presented To The ERCOT Board Of Directors December 17, 2002 Sam Jones, COO

RMR Contract Recommendations

Estimated Costs

Checklist For The Board ERCOT staff reports to the Board that for every RMR contract proposed for January - March on the previous pages: 1.The generation resource owner has provided a complete application for RMR status 2.The generation resource owner has provided a sworn attestation supporting its claim of pending plant closure 3.ERCOT has received all data requested from the applicant necessary to evaluate the need for and provisions of the RMR agreement 4.The RMR agreement that will be signed is consistent with the ERCOT Protocols

Checklist For The Board (Continued) 5. ERCOT performed the following steps in the evaluation of the need for and provisions of the RMR agreement a.Each potential RMR unit was evaluated against a set of reasonable alternatives b.The time frame for need of the RMR unit was determined c.The type of reliability concern was identified-voltage, thermal- - d.Available alternatives were evaluated – redispatch, remedial action schemes, special protection schemes –Load response is not currently an option as the specification for this service has not been developed Where applicable, the amount of load that could be affected was also estimated