Ocean Observing System Status & Issues for GODAE D.E. Harrison OOPC IGST-X November 2005.

Slides:



Advertisements
Similar presentations
GEO-5 Meeting, November 2005, Ottawa, Canada IGOS-P Input for the GEOSS 10-year Implementation Plan.
Advertisements

Sponsor Guidance for GCOS Keith Alverson IOC/UNESCO Ocean Observations and Services GCOS Steering Committee Meeting, 28 Sep – 1 Oct 2010, Geneva.
2010 update of GCOS IP in support of UNFCCC Paul Mason and Stephan Bojinski GCOS Steering Committee September 2010.
CEOS-led response to the GCOS-IP Mitchell D. Goldberg CEOS Climate SBA Coordinator NOAA/NESDIS 1.
The Way Forward From JCOMM-IV Some Personal Perspectives D.E.Harrison NOAA/PMEL & Univ. Wa. JCOMM-IV Technical Symposium Yeosu, South Korea May 2012.
OOPC and OCG, April 2002 * OOPC Pilot Projects * Other OOPC Initiatives * OceanObs99 St. Raphael * CEOS/IGOS Ocean Theme * Toward a products/system approach.
Integrated Earth System Analysis Workshop Report Held November 2010, Baltimore MD Details at 2PM – POS Panel.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
United Nations Environment Programme. UNEP’s Work to Advance the Preparation and Implementation of National Adaptation Programmes of Action 3 September.
Global Ocean Observing System (GOOS) Environmental Context for CoML Some cautions and a quick picture of elements of the system Edward Harrison, Chair,
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 Consideration of CEOS Response to the Arctic Ecosystems Initiative Agenda Item 14 Guy Séguin Canadian.
4th Meeting of CEOS-CGMS Working Group on Climate EUMETSAT, Darmstadt, Germany 5 – 7 March 2014 Carolin Richter, Director, GCOS Secretariat, GCOS Planning.
The CEOS Constellations Status and Way Forward SIT September 2006.
Introduction to Breakout Session 2.2 Essential Variables for GEO SBAs (Chair: Antonio Bombelli) Coordinator of the GEO Task CL-02 “Global Carbon Observations.
Report to the First GODAE OceanView Science Team Meeting Toulouse, 8 June 2009 Jean-Louis FELLOUS and Peter DEXTER Co-Presidents of JCOMM and Albert FISCHER,
1 IOOS Status of Planning & Implementation Background –Milestones Implementation Plan, Part I –Governance of the IOOS Implementation Plan, Part II –The.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Introduction and Project Overview 3rd GEO European Project Workshop Istanbul, October 8-9, 2009.
Recent developments in the UNFCCC process in relation to global observations 4 th GTOS Steering Committee Paris, 1-2 December 2009 Rocio Lichte Programme.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
Moving Forward: NOAA & Earth Observation Systems Mr. Timothy R.E. Keeney Deputy Assistant Secretary of Commerce for Oceans and Atmosphere National Oceanographic.
Ostende GLOSS Course 2006 GLOSS (and MedGLOSS, GCOS etc.) Philip L. Woodworth Permanent Service for Mean Sea Level.
Data Buoys: a Cornerstone System of the Global Earth Observation System of Systems Mike Johnson Director, NOAA Office of Climate Observation JCOMM Observations.
CEOS Plenary, Lucca, Italy, November 2011 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitchell D. Goldberg CEOS Climate SBA Coordinator.
Committee on Earth Observation Satellites John Bates Chair, Joint CEOS-CGMS Working Group on Climate 3 rd WCRP Data Advisory Committee.
Observing System Status Report D.E.Harrison Ocean Observations Panel for Climate GODAE ST Washington, DC June 2008.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
Slide # 1 “Task-level GEOSS Roadmap” Chu Ishida, JAXA Yoichi Nakamura, Mitsubishi Research Institute, Inc. Feb. 6-7, 2008 ADC Full Committee Meeting #6.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
OOPC to WOAP-II D. E. Harrison Ocean Observations Panel for Climate (WCRP, GOOS, GCOS)
Observing System Status- Brief Overview Will post PPts from Mike Johnson and from Eric Lindstrom from the annual review of the NOAA Climate Observations.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
WGISS-40, Harwell, Oxfordshire, UK, Sept. 28-Oct. 2, 2015 GEO/CWIC Interactions Ken McDonald/NOAA CWIC Session, WGISS–40 October 1, 2015.
Adrian Simmons Lead author, Status Report for the Global Climate Observing System Consultant, European Centre for Medium-Range Weather Forecasts Report.
William Westermeyer 15th Meeting of the GCOS-GOOS-WCRP Ocean Observations Panel for Climate 2 April 2011 Comments from the GCOS Secretariat.
Bob Keeley Marine Environmental Data Service Dept. of Fisheries and Oceans Ottawa, Canada Jun, 2006 SeaDataNet Meeting.
Climate and Cryosphere (CliC): Legacy for 2013 and Beyond Jeff Key NOAA/NESDIS Chair, CliC Observation and Products Panel (Agenda item )
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
CEOS Strategic Implementation Team (SIT) Report 2009 Accomplishments and Lessons Learned Agenda Item 9 Mary Kicza SIT Chair NOAA 1 The 23 rd.
IndOOS—a sustained ocean observing system in the Indian Ocean for climate research Howard Cattle for Gary Meyers Co-Chair CLIVAR/GOOS Indian Ocean Panel.
CEOS-CGMS Working Group on Climate John Bates NOAA/NESDIS/NCEI SIT Workshop Agenda Item 7 CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
The Importance of GMES & GEOSS: Integrating Our Earth Observation Systems VADM Conrad C. Lautenbacher, Jr., USN (Ret.) Under Secretary of Commerce for.
4th Meeting of CEOS-CGMS Working Group on Climate EUMETSAT, Darmstadt, Germany 5 – 7 March 2014 Carolin Richter, Director, GCOS Secretariat, GCOS Programme.
NOAA’s Office of Climate Observation Presented to the JTA XXIII Angra Dos Reis Rio De Janeiro October , 2003 Sidney W. Thurston, Ph.D. National.
Aid Coordination Roundtable Meeting 09 July 2009 Accra Agenda of Action and The Paris Declaration.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
JCOMM Observations Programme Area Report to the DBCP Angra dos Reis, 20 October 2003 Observations Programme Area Coordination Group (OCG) Mike Johnson,
The progress of GOOS Report of the Intergovernmental Committee for GOOS Silvana Vallerga, chairperson 22nd IOC Assembly, Paris June 26th, 2003.
CHANGING WEB-BASED USER INFORMATION SYSTEM DYNAMICS Engaging users with Extension Suite Online® and AgriSuite Online® Piet van Zyl.
Update to Nairobi Convention Partnerships Workshop on support from IOC to the WIOCC Mahé, Seychelles – 19 June 2015.
1 GEO Science and Technology Committee, Melbourne, 16 September 2009 Coordinating Implementation of the Global Ocean Observing System Peter Dexter Co-President.
JCOMM: Perspectives & Contributions 1 Val Swail - Environment Canada, Toronto 2 Scott Woodruff - NOAA Earth System Research Laboratory, Boulder Elizabeth.
Interagency Ocean Observation Committee The Integrated Coastal & Ocean Observing System Act of 2009  Interagency Ocean Observing Committee  Lead Federal.
2010/11 SIT Chair Vision and Goals Makoto Kajii Japan Aerospace Exploration Agency 1 The 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Objectives Review work done on impact studies, OSEs and OSSEs over the past years Identify robust and common features Understand differences in assimilation.
Developing G7 ocean initiative Albert Fischer, GOOS, IOC/UNESCO SIT-31 Agenda Item #15 (AOB) CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy.
ICSU and GCOS Howard Moore, Senior Advisor, ICSU GCOS Steering Committee, XVIII Session Geneva, 28 September – 1 October 2010.
Toward OceanObs2009 D.E.Harrison NOAA/PMEL, OOPC OCO Annual Review September 2008.
Candyce Clark JCOMM Observations Programme Area Coordinator
CEOS Thematic Acquisition Strategies Status & Issues
Strategy Implementation
Contributions to WIGOS David Meldrum, vice chair, JCOMM OCG
Coordinating Operational Oceanography and Marine Meteorology
CLIVAR Report to WOAP4 Detlef Stammer.
Presentation transcript:

Ocean Observing System Status & Issues for GODAE D.E. Harrison OOPC IGST-X November 2005

Outline Planning Status of system implementation Reporting to UNFCCC GEOSS linkage Some Issues

PLANNING GCOS IP completed & accepted by UNFCCC and GEOSS 10-yr plan Review/Revision of IGOS-P Ocean Theme report GCOS/CEOS group to address CEOS response to GCOS IP. Continuity & Climate quality of satellite data streams Non-physical variables need more attention Linkages w. coastal systems? Collaboration with tsunami/natural disaster?

Status of Implementation Modest in-situ system progress (~50% of GCOS IP). Argo going forward well Satellite suite good at moment (trouble w. ice satellites, tho’), but concern about continuity & quality in future Continuing challenge getting national reporting (and planning) Continuing lack of international forum for discussion and development of national commitments

DRIFTERS & MOORINGS SEPT. 2005

Ships of Opportunity SEPT. 2005

ARGO Profiling Floats SEPT 2005

2006 ? Budget concerns in US Hoped to increase number of real time reporting tide gauges (~50) Argo growth projected to continue Ocean carbon/repeat hydro development Satellite advocacy JCOMM/GOOS panel for non-physical variables?

Reporting to UNFCCC Conference of the Parties has called for annual reporting on status of implementation of ocean observing system First such report given in May 2005 Very limited response from nations to request for response to GCOS IP. Took a positive tack by emphasizing number of nations contributing tide gauges Interest level was considerable NEED INDICES for COMMUNITY INTEREST

GEOSS Linkage GEOSS 10-year plan links strongly to GCOS IP Development of 2006 Work Plan still underway. Some unease with draft Desirability of higher profile for ocean in GEOSS

Some Issues Present plan weak on non-physical variables and ecosystems. Technical challenges considerable. R&D needs considerable. Feedback from users has been non-specific Evaluation/evolution actions limited to date Subsurface index development slow Surface flux issues…’SURFA’ efforts? Can we get increased advocacy, including from coastal groups? I-GOOS? Others? National engagements with IP limited System faces possibility of major disruption