Database Issues and a Few Other Things. Department of Mechanical & Aerospace Engineering Michael R. Muller Professor of Mechanical Engineering at Rutgers.

Slides:



Advertisements
Similar presentations
An Indispensable Quality Assurance Tool for Dairy Processing Plants.
Advertisements

New Paradigms for Measuring Savings
Case Franchise Support & Training. Case Support Who? Who do I call for support? What? What types of questions can be answered by the corporate support.
Test Automation Success: Choosing the Right People & Process
Vice President of Facilities
Sandy Glatt IAC Annual Lead Student Mtg. February 17, 2005.
OPPORTUNITIES FOR BUSINESSES TO DIRECTLY IMPROVE THE BOTTOM LINE THROUGH ENERGY EFFICIENCY 3 rd May 2010 Kees Brinkman Managing Director.
IAC / WVU Industrial Productivity Improvement Through Energy Efficiency & Waste Reduction By B. Gopalakrishnan, PhD, P.E., CEM Professor & Director Industrial.
Dedicated Professionals Sharing Expertise. Waste Reduction Partners is a working partnership with: Land-of-Sky Regional.
Susan Kreh Beck Project Director
How to use Reference USA A Guide To Creating Your Own Targeted Company Database By Tom Jackson Business Development
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer 2003.
IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2004.
Portfolio Manager 101. Learning Objectives In this session, you will become familiar with EPA’s ENERGY STAR ® Portfolio Manager ® tool and learn how to:
Software Documentation Written By: Ian Sommerville Presentation By: Stephen Lopez-Couto.
Presented by Mary C. Emplaincourt, M.S Presentation at a MMA Energy Meeting.
Energy Audit- a small introduction A presentation by Pune Power Development Pvt. Ltd.
Creating Energy-Efficient Data Centers
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
Computerised Maintenance Management Systems
Common Energy Mistakes
Developing Effective Marketing Offers to Drive Leads Jennifer Culbertson Looking Glass Marketing
Powered by. Motus is an integrated web-based and mobile software platform that supports field work management and execution, giving employees necessary.
E-rate Online Tools Minimizing Errors and Saving Time.
What is E-Commerce? Section 8.1. What is E-commerce? E-commerce is the exchange of goods, services, information, or other businesses through electronic.
Gaining Efficiency from Technology  Budgets are being slashed but workloads are not changing.  Government can not afford not to invest in new Technology.
COMP 4923 Green IT audit for Registrar’s Office John, Michael, Sarah.
Managing Operational Energy in Buildings
E NERGY S TAR and K-12 Schools Melissa Payne E NERGY S TAR Climate Protection Partnerships Division.
1 Demand-Side Management Technology Workshop: Motors and Variable Frequency Drives Sponsored by Basin Electric Power Cooperative.
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
Performance Metrics for Weatherization UGI LIURP Evaluation Yvette Belfort Jackie Berger ACI Home Performance Conference April 30, 2014.
April 1, Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. –Event number: –Event password: 2015B13 To hear.
SANILAB THE LOGICAL INDUSTRY CHOICE. SANILAB Industry edition Risk management is costly and stressing for production, quality and any other people of.
Prof. S. Neti, Director Drs. A. Oztekin, C. Romero, and H. Bilirgren.
Chapter 6: The Economic Contribution of Hospitals.
Arkansas Target Test The Online Assessments A New Look.
Operations Research FTA Revenue Estimating Conference New Hampshire September 2000 Washington State Department of Revenue Mary Welsh Assistant Director.
IT Job Roles & Responsibilities Shannon Ciriaco Unit 2:
REAL TIME GPS TRACKING SYSTEM MSE PROJECT PHASE I PRESENTATION Bakor Kamal CIS 895.
2002 Numerical List of Manufactured and Mineral Products Publication Parts: Introduction, Conversion Table Mining Sectors 211, Oil and Gas Extraction 212,
CARE. ACT. SHARE. LIKE CORDAID. CORDAID OPENING UP OPEN DEVELOPMENT CAMP, NOVEMBER 2013.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Decomposition Analysis for Energy Use of SMEs In U.S. Manufacturing Industries Yadan Zeng Advisor: Dr. Chris Y. Yuan Department of Mechanical Engineering,
SBTeach Introduction School of Business Course Coordination System.
1 Bill Prymak, US Department of Energy Golden Field Office February 19, 2009 Energy Assessments: What are the Benefits to Small and Medium Facilities?
A Volunteer Supervisor’s Guide to Volunteer Connection a modern, online volunteer management solution.
Evaluation of the Center for Irrigation Technology’s Agricultural Pumping Efficiency Program Presentation for the MAESTRO/CALMAC Evaluation Showcase.
Computerised Maintenance Management Systems
The Centers at 10 Years: Where Do we Go From Here? An EPA Perspective Jim Edward, Director Compliance Assistance Division/OECA US EPA.
February 19, 2004 Douglas A. Hopper 1 February 19, 2004Photo by: Douglas A. Hopper1 IAC LEAD STUDENTS STUDENT STEERING COMMITTEE DISCUSSION TOPICS February.
Portfolio Manager 101. Learning Objectives In this session, you will become familiar with EPA’s ENERGY STAR ® Portfolio Manager ® tool and learn how to:
AUDIT ENERGI AGUS HARYANTO. DEFINISI Energy Audit can be simply defined as a process to evaluate where a building or plant or activity or process uses.
Ghost Credit Cards in eProcurement Jeremy Williams NC State University Technology Support Analyst Purchasing Department.
Source(s): MAPI Foundation Figure 1 – Percent Who Engaged in Automation Investment in the Prior 5 Years and Who Plan to Engage in Automation Investment.
Industrial Assessment Centers IAC Student Meeting – Washington, DC February 8-10, 2006 Attended Student: Yin Yin Wu 2006 IAC Student Meeting Overview.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Figure 1 – U.S. Non-Farm Labor Productivity Growth, Four-Year Moving Average Source(s): U.S. Bureau of Labor Statistics.
Utility Bills Reduction by Energy Consumption Management
Manufacturing Sector Skills Needs Assessment 2010 Survey
Seminar On Energy Audit Submitted To: Submitted By:
2004 IAC Director’s Meeting
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
Industrial Assessment Center Database
LEAN ORGANIZATION SUMMARY
Campus ESSA Grant Packet Training
GDSS – Digital Signature
Alabama Industrial Assessment Center
What is a System? A system is a collection of interrelated components that work together to perform a specific task.
Concord Products Online
Presentation transcript:

Database Issues and a Few Other Things

Department of Mechanical & Aerospace Engineering Michael R. Muller Professor of Mechanical Engineering at Rutgers Director of IAC at Rutgers: Eastern Region Field Manager – IAC 1992 to present Eastern region handles database for entire program My particular interests are:  On-site power generation  Supplier development programs  Developing Protocols for Industrial “Triage”

Department of Mechanical & Aerospace Engineering Industrial “Triage” Strategy for ranking cost saving proposals  Replaces list of “good ideas” which preclude ranking Requires cost estimates and project impacts  Must develop connection to productivity  The “soft number problem” We do it already – not enough time to go after all of the good ideas at a plant  Need to quickly focus on high yield targets

Department of Mechanical & Aerospace Engineering Program Metrics Each year the IAC program’s performance at DOE is determined (GPRA - Government Performance and Results Act of 1993) IAC’s are graded on their performance as well  Measurable statistics are called metrics (buzz) Director’s know about this, but students may not Students are important parts of a center’s overall performance  You need to track your own metrics

Department of Mechanical & Aerospace Engineering Program Metrics East and West regions differ, but details are available Examples here are for the East!

Department of Mechanical & Aerospace Engineering Overall Ranking Criteria Report Quality Assessment Performance Day to Day Operation Contract Compliance Database Metrics

Department of Mechanical & Aerospace Engineering Eastern Program Metrics

Department of Mechanical & Aerospace Engineering Report Quality Presentation Clarity Creativity Knowledge Errors  Students do much of the proof reading We still see upside-down pages!  Lead students will set the tone in the office – will have great impact with the rest of the team

Department of Mechanical & Aerospace Engineering Assessment Performance Based from site visits and client follow ups Some of the criteria:  Attitude  Technical Knowledge  Interview  Plant inspection  Student participation  Faculty leadership  Student safety  Instrumentation

Department of Mechanical & Aerospace Engineering Day to Day Operation Availability / responsiveness Database Communications Extra money handling Faculty participation Student Utilization

Department of Mechanical & Aerospace Engineering Contract Compliance Timeliness (# of late items submitted)  Big student impact here Coverage  Industry coverage 1 (based on # of 2-digit SIC codes)  Geographical coverage 1 (based on 3-digit ZIP codes) Other violations  More than 3 exceptions  Non-compliant quarters 1 based on last 75 reports

Department of Mechanical & Aerospace Engineering Database Metrics (last 25 reports) Implemented Dollar Savings (35%) Implemented Energy Savings (15%) Total # of different AR’s (20%) Recommended Dollars per assessment (15%) Total # of Energy AR’s (7.5%) Total # of Non-energy AR’s (7.5%)

Department of Mechanical & Aerospace Engineering Database Metrics Students need to track metrics at their own center  Should also track their performance against other centers This is very doable, but needs a student to get experienced with databases Students already upload most of the data to RU Database and manuals are online at Rutgers  oipea.rutgers.edu  Or call Uncle Fred (Fred Glaser) at

Department of Mechanical & Aerospace Engineering Training Manuals Online

Department of Mechanical & Aerospace Engineering The IAC Database Structure: Two Main Files Assessment Database  IAC and Report Number, Visit Dates  Plant size, Principal products, SIC  Number of Recommendations  Energy Streams: Cost and Usage Recommendation Database  A Narrative Description of the Recommendation  ARC representing recommendation  Resource Use and Costs Avoided  Costs to Implement  Status of Implementation

Department of Mechanical & Aerospace Engineering The IAC Database (cont.) The database contains data from all assessments since 1981 Data shows changes regionally, and over time – very useful to many groups Accessing the Database   Users can: 1. Download the data files and perform queries on their own computers 2. Use the on-line queries on the web site

Department of Mechanical & Aerospace Engineering Interactive Database Access Client - Server structure Available on RU website Eliminates need to download database for simple queries Current version use MYSQL v Easiest way to check if your data is online DOE looks at this – their way of keeping track

Department of Mechanical & Aerospace Engineering Database Metrics For many of the metrics used to judge center performance, the database must be downloaded and analyzed Any database software will let you work with the data  Data is in standard dbase engine (.dbf) Most metrics are easy to calculate  Normally we sum over last 25 assessments  Therefore it crosses contract years

Department of Mechanical & Aerospace Engineering Database Metrics Trickiest measure is creativity  We count different ARC numbers used in the last 100 assessments  Good number is about 100!

Department of Mechanical & Aerospace Engineering Using the database as an assessment tool IAC’s develop their own ways of doing things The IAC database is just one tool We recommend that students check the database before an assessment  Look for assessments with same SIC code (NAICS)  Find recommendations which were made – get ideas  Broaden the types of recommendations your IAC makes My happiest moments as an IAC director was when students came up with good ideas Probably need to use download database

Department of Mechanical & Aerospace Engineering 20Food and Kindred Products30Rubber and Misc Products 21Tobacco Products31Leather and Leather Products 22Textile Mill Products32Stone, Clay, and Glass Products 23Apparel and other Textile Products33Primary Metal Industries 24Lumber and Wood Products34Fabricated Metal Products 25Furniture and Fixtures35Industrial Machinery and Equipment 26Paper and Allied Products36Electronic & Other Electric Equipment 27Printing and Publishing37Transportation Equipment 28Chemicals and Allied Products38Instruments and Related Products 29Petroleum and Coal Products39Miscellaneous Manufacturing Industries

Department of Mechanical & Aerospace Engineering First Step – Check the interactive database Will give top ten recommendations The IAC program looks at systems which are common to many industries There are 22 2-digit SIC codes served by the IAC’s  How many different recommendations appear in the 22 top ten lists (max = 220, min 10)

"Industrial Energy Audit/ Assessments: Implications for Saving Energy in the Manufacturing Sector" AEE Congress Michael R. Muller Professor of Mechanical Engineering Rutgers University

Only 21 Recommendations appear in any Top Ten

Department of Mechanical & Aerospace Engineering SIC Searches Best to use download database and look for more than the top ten Often this will give good ideas Examples:  Sand recommendations in metal casting  Recovery boilers in paper mills  Oxyfuel combustion in glass plants  High accuracy metering pumps in chemical plants

Department of Mechanical & Aerospace Engineering Understanding the bigger picture Another benefit of database is that it shows what plants and industries respond best to IAC services How big is the typical plant? How many employees? What industries do we visit most often? With IOF industries being the priorities, how are they represented in your region?

Department of Mechanical & Aerospace Engineering Average = $25 million Median = $16 million Characterization of IAC Clients

Department of Mechanical & Aerospace Engineering Characterization of IAC Clients Average = 166 Median = 125

Department of Mechanical & Aerospace Engineering Characterization of IAC Clients Average = $354k Median = $196k

Department of Mechanical & Aerospace Engineering Some Reminders Change from “site to source” for electricity Electrical energy consumption is not equivalent to the total energy consumed  Losses from power plants and transmission are considerable  Grid efficiency is about 30%  Practice leads to 3x undercounting of energy savings on electrical AR’s Before – uploading used MMBtu’s Now – upload electrical consumption with KWH!

Department of Mechanical & Aerospace Engineering Implementation – what is pending? Only three implementation codes are acceptable:  I – Implemented must have date that is not greater than 1 year from implementation interview and not greater than 2 years from assessment  N – Not Implemented with Reason Code N1 through N22, excluding N12 & N13 For FY01 we will not accept –N12 – to be implemented after 2 years –N13 - considering  P – Pending: No date just a ‘P’ For recommendations over $10,000 use ‘P’ and you then must call back client within 3 years of audit or recommendation will become not implemented. For recommendations under $10,000 – make a decision!