Integration Update 1 External Interfaces & Integration October 14, 2008 Brian Brandaw.

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
Advertisements

2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
Configuration Management
Billing Agent. Pre-Application Checklist Introduction to IMPACT and Key Terms Application Process Starting an Application The Business Process Wizard.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
RDWG – MP Online Data Entry – Project Priority List / Update July 30, 2013 Troy Anderson.
EProcurement. Transaction: ME41 Create RFQ Transaction: ME41 Assign Vendor The following button invites vendor to participate in the bid.
Lead Management Tool Partner User Guide March 15, 2013
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 19, 2010.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates March 07, 2008.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date August 14, 2014.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Testing Aug 14, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5: SCED Phase 1 Kickoff Meeting August 1, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates November 30, 2007.
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Oct 03, 2008.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
Institutional Student Information Record (ISIR) Update Teri Hunt Sherlene McIntosh Session 16.
1 Market Trials Update NATF June 1, 2010.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Session 52 NSLDS Tools for Determining Eligibility - New Ideas Jeff Baker Teri Hunt Lisa Hanners Don Holec.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
Lead from the front Texas Nodal 1 Registration Market Call Oct 31, 2008.
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Market Participant Data Access 1 Market Participant Data Access Jan Stephen Kerr.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
October 14, 2015 LRIS v2 / Self-scheduled Third party DR Provider Data Submission Proposal Carl L Raish.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
8 Chapter Eight Server-side Scripts. 8 Chapter Objectives Create dynamic Web pages that retrieve and display database data using Active Server Pages Process.
ERS Update – DSWG Presentation September 21, 2012.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Distributed Generation Registration June 30, 2008.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates Feb 01, 2008.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
UNCLASSIFIED – For Official Use Only 1 Contract Load Notification “Fly-in” Action ( Continue to Page Down/Click on each page…) Electronic Document Access.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Integrated Release Approach and Update TPTF 11/10/2008 Matt Mereness.
Integration Update 1 External Interfaces & Integration Aug Stephen Kerr.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Resource Registration Update Dana Showalter Patrick Coon May 5, 2008.
External Interface Update 1 External Interface Update April 2, 2007 Daryl Shing.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Transition Plan Network Operations Model Change Requests 5/26/2010.
6/9/2008 MIS Business Requirements for Notices Adam Martinez Kate Horne.
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Thoughts on DER Aggregations ERCOT Staff DREAM TF Sept. 28, DER Aggregations.
1 Market Trials Update NATF January 5, 2010.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
TAC Update Kyle Patrick. 2 Nodal ERCOT Program Update –Nodal Market Go-Live (Vote)- vote passed in which TAC certified full nodal systems for Dec 1, 2010.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
ERCOT Market Design & Operations
Webservices Update for Nodal Market Trials
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Integration Update 1 External Interfaces & Integration October 14, 2008 Brian Brandaw

Integration Update 2 Agenda Updates to External Interface Specification Comments to External Interface Specification 1.16

Integration Update 3 Updates to External Interface Specification Revision 1.16 was posted on September 17 th for review. The changes in version 1.16 are – Added Resource Parameter Transaction Service Section –11.0 – Added Settlement Interfaces section – Added NCLRFlag to awardedAS – (MMS4) – Added crrOwnerName to Awarded CRR – (MMS4) – Added startType and combinedCycleName to AwardedEnergyOffer (MMS4) –10.1- Updated Resource_parameters EWS is for querying only. –Figure 1 – Updated Web Services Interface verbs/nouns

Integration Update 4 Comments to External Interface Specification 1.16 Section – ASType: Can we have a consistent naming standard for A/S types? The controllable load and non controllable load codes are inconsistently implemented. Is RRS the total RRS or the RRS from generation resources? The next MMS 5 release is changing RRS AS types to: o RRS_GEN -- Res Res Serv for Generation Resource o RRS_CLR – RRS for Controllable Load Resource o RRS_NCLR – RRS for non-controllable Load Res EIP will change these affected AS Types accordingly. Section – AS Offers: Why are combinedCycle and nonControllableLoadFlag here? These are attributes of the resource. On the Combined Cycle, this structure was designed before it was determined that the resource name would uniquely identify the physical resource and combined cycle logical resource for all resources. A controllable load resource may offer AS as either a controllable load resource or as a load resource controlled by under-frequency relay (just not at the same time). Since they can't offer both at the same time it is not necessary flag and hence is left there as matter of convenience. Section – Awarded AS: The RRS types for load resources are missing. RRS_NCLR was added to ASTrade list of AS Types. The possible ASTpes are now: Reg-Down, Reg-Up, RRS, RRSLD, RRS_NCLR, Non-Spin.

Integration Update 5 Comments to External Interface Specification 1.16 Cont. Section – AwardedAS: What is the non controllable flag used for? This flag should not be necessary as the resource type can be derived by the resource. A controllable load resource may offer AS as either a controllable load resource or as a load resource controlled by under-frequency relay Since they can't offer both at the same time, you are right in that it is not necessary. The flag is not derived from the resource type, but from the flag submitted in the AS Offer. So, you could look at your AS Offer for the same resource and time period to find the value of that flag. It is repeated as part of the AS award for convenience. Section – AwardedEnergyOffer: What are the valid values for start type? Why is the combined cycle name used in this submission? Is it a required field when a logical combined cycle resource is submitted? It is my understanding that resource should identify the correct combined cycle logical resource Values for Start types: COLD, HOT, INTER, or null (it is also updated in EIS 1.17) Combined cycle is a required field. This structure was designed before it was determined that the resource name would uniquely identify the physical resource and combined cycle logical resource for all resources. AwardedEnergyOffer is either retrieved or sent asynchronously and this fields will always be populated.

Integration Update 6 Comments to External Interface Specification 1.16 – cont. Section – Notices and Alerts: If we are receiving notifications for multiple QSE’s at the same IP address, how can we decipher which message is for which QSE? Good point and element "qse" is added to the notification structure in ErcotNotificationTypes.xsd in EIS 1.17 compliant xsd files. Section – Startup/Shutdown: Is the delivery date the time the message was sent to the QSE or is it the requested time for the unit be committed / decommitted? It is the requested time for the unit be committed / decommitted Section Outage Creation: The resource type appears to be inconsistent with the ERCOT outage scheduler documentation which denotes resources as one of three types: GEN, RMR, and BLK. The ERCOT outage scheduler applied several rules regarding which submissions would be accepted and rejected around which of the three types of unit it is. Group/ResourceOutage/resourceType can only be UN or LR which indicates the equipment is Unit Generation (UN) or Load Resource(LR). The GEN, RMR, and BLK is used for Reliability Type and ERCOT OS already has that information for a given resource and there’s no need for an MP to send the reliability type.

Integration Update 7 Comments to External Interface Specification 1.16 – cont. Section – Generator Resource Parameters: Is it possible to add start and end date or effective date to these fields. It appears that these submissions will become effective immediately once received at ERCOT. That is correct, RPs will become effective immediately. There are no plans to add dates to these submissions. Section – Generator Resource Parameters: If one of these values changes permanently from the registered value, then shouldn’t the resource entity should submit a new RARF? Yes, this is needed for use by non-MMS systems. Section – Generator Resource Parameters: Will updating these parameters in a newly submitted RARF change these parameters at ERCOT as well? Only if the Resource has never been used the GenResourceParameter submission functionality. Once you have updated the resource parameters through the MMS interface, the MMS submission always overrides the RARF. If the Resource submits an updated RARF, you must also update resource parameters using the MMS GenResourceParameter submission.