ECTL 13-110856-A Support to the Automated Safety Data Monitoring Indicator project.

Slides:



Advertisements
Similar presentations
Usability Lab 2007 Corso Laboratorio di Basi Dati II Rome, 2007 Enea Usability Lab - C.R. Casaccia, Roma, Italy User Requirements & Cyber Enterprise Web.
Advertisements

Systems Development Environment
Test Automation Success: Choosing the Right People & Process
Software Quality Assurance Plan
Lecture # 2 : Process Models
1 Information Systems Development (ISD) Systems Development Life Cycle Overview of Analysis Phase Overview of Design Phase CP2236: Information Systems.
Alternate Software Development Methodologies
Part 1: Introducing User Interface Design Chapter 1: Introduction –Why the User Interface Matters –Computers are Ubiquitous –The Importance of Good User.
Dynamic Systems Development Method (DSDM)
Alternative Methodologies Ken Peffers UNLV March 2004.
EURIDICE project Evaluation of image database use in online learning environment 11/
Chapter 6 The Process of Interaction Design Presented by: Kinnis Gosha, Michael McGill, Jamey White, and Chiao Huang.
Lecture 13 Revision IMS Systems Analysis and Design.
Fundamentals of Information Systems, Second Edition
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Objectives Explain the purpose and various phases of the traditional systems development life cycle (SDLC) Explain when to use an adaptive approach to.
Preparatory Solvency II Reporting Industry Presentation.
IMS Information Systems Development Practices
Development plan and quality plan for your Project
MSF Testing Introduction Functional Testing Performance Testing.
Introductions Jim Enzinna, Chief, Licensing Division Mark DiNapoli, Assistant Chief, Licensing Division Tracie Coleman, Head, Information Section Vince.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Data Analysis in the Water Industry: A Good-Practice Guide with application to SW Deborah Gee, Efthalia Anagnostou Water Statistics User Group - Scottish.
October 30, 2008 Extensible Workflow Management for Simmod ESUG32, Frankfurt, Oct 30, 2008 Alexander Scharnweber (DLR) October 30, 2008 Slide 1 > Extensible.
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
TESTING STRATEGY Requires a focus because there are many possible test areas and different types of testing available for each one of those areas. Because.
Abdulmotaleb El Saddik Prof. Dr.-Ing., FIEEE, FCAE University Research Chair ELG 4913F ELG 4913F Electrical Engineering Design Project II
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
T Project Review RoadRunners [PP] Iteration
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
Chapter 1: The Object-Oriented Systems Development Environment Object-Oriented Systems Analysis and Design Joey F. George, Dinesh Batra, Joseph S. Valacich,
RUP Implementation and Testing
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
BMAN Integrative Team Project Week 2 Professor Linda A Macaulay.
T Iteration Demo Team WiseGUI I2 Iteration
Software Engineering Management Lecture 1 The Software Process.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
1 MODERNIZATION OF BELARUSIAN STATISTICS _________________________________________________ IMPLEMENTATION OF THE PROCESS APPROACH IN ORGANIZING THE STATISTICAL.
Software Engineering Principles Principles form the basis of methods, techniques, methodologies and tools Principles form the basis of methods, techniques,
Chapter 9 Testing the System Shari L. Pfleeger Joann M. Atlee
Software Quality Assurance
BE-SECBS FISA 2003 November 13th 2003 page 1 DSR/SAMS/BASP IRSN BE SECBS – IRSN assessment Context application of IRSN methodology to the reference case.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
Software Construction Lecture 18 Software Testing.
User Interfaces 4 BTECH: IT WIKI PAGE:
August 2005 TMCOps TMC Operator Requirements and Position Descriptions Phase 2 Interactive Tool Project Presentation.
Software Life Cycle The software life cycle is the sequence of activities that occur during software development and maintenance.
Project Deliverables CEN Engineering of Software 2.
Project Management Project planning individual assignment: Project CLOCK
Instructional Plan Template | Slide 1 AET/515 Instructional Plan Advanced Enterprise Java Platform Training Presentation Tier Design using an Event Driven.
Process Asad Ur Rehman Chief Technology Officer Feditec Enterprise.
2 ASSIST for Schools/Districts An Overview of the Framework Dr. W. Darrell Barringer.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
Chapter 6 SYSTEMS DEVELOPMENT Phases, Tools, and Techniques.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
Project Deliverables CIS 4328 – Senior Project 2 And CEN Engineering of Software 2.
GW ToDo A Task Manager CSCI 6442 Project Spring, 2016.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
GCE Software Systems Development A2 Agreement Trial Implementing Solutions October 2015.
TGDC Meeting, Jan 2011 VVSG 2.0 and Beyond: Usability and Accessibility Issues, Gaps, and Performance Tests Sharon Laskowski, PhD National Institute of.
WP8: Demonstrators (UniCam – Regione Marche)
Software Engineering Management
Classifications of Software Requirements
Applied Software Implementation & Testing
Unit 09 – LO3 - Be able to Implement and Test Products
Information Systems Development (ISD) Systems Development Life Cycle
DMCS Data Ethics Framework principles
USOAP Continuous Monitoring Approach (CMA) Workshop
Information system analysis and design
Presentation transcript:

ECTL A Support to the Automated Safety Data Monitoring Indicator project

Details Objective: support the development of an Automated Data Processing Tool. Firm part (1 st October-31 st December) +Optional part (1 st Jan-31 st March) Due date: 30 th September, 15:00 (Brussels time) Online submission

Context

Firm part T1. Prototype a look and feel generator provide an advanced "look and feel" of the automated data processing tool. The tool shall allow an iterative process of design and review to be conducted with the EUROCONTROL project team, and for the design to be evolved in accordance with EUROCONTROL requirements, meaning that it shall be capable of integrating further performance indicators. As a minimum the tool shall demonstrate how automatically generated data can be displayed, filtered, processed and interacted with. At this time, the automatically generated data is expected to be as detailed in section 1.3 above, but this may be expanded as the project progresses. T2. Develop user requirements (URD) for tool specification Following the production of the Interface Demonstrator - which will be non functional - it will be used to derive a detailed specification of functional and non functional requirements describing user actions and outputs. The URD will consider as a starting point the prototype tool. The technical specification shall be written in such a way that it may be used to develop a fully defined system interface should it be required.

Optional part (I) T3. Develop the system requirements (SRD) for the tool Based on the user requirements document and the interface demonstrated a detailed requirements specification will be produced. The specification will describe in detail the process and technical "functions" the tool is expected to deliver. The specification will make it clear how for the safety performance indicators data can be processed and displayed in accordance with the User requirements specification. The specification will also make it clear how future automated indicators shall be integrated into the tool. A list of potential indicators for display will be provided. T4. Tool development (including documentation/manuals) Based on the URD and the SRD, the tool shall be developed to accept, process, analyse and display, to start with, separation minima infringements and runway incursions data, and any other indicator data identified and agreed with EUROCONTROL. The tool will be managed in accordance with software development best practice, and is expected to function on generic windows platforms and not require specialist software to run.

Optional Part (II) T5. Updated version of the Tool and documentation This task is twofold: 1. First, building upon the results of a pilot study conducted by EUROCONTROL during which the tool developed in T4 will undergo validation testing to ensure that it is sufficiently robust for operational use, an updated version of the tool will be developed. 2. Secondly, the software documentation (product documentation related to Users and System) will be produced to satisfy the following requirements: · how to use and administer the Tool · program source code · how further evolution of the Tool has been taken into account in its design Bidders shall give hints on ways of writing effective documents.

Deliverables table (I)

Deliverables (II)

Required skills & evaluation Mandatory requirementMax score (100)Min score (75) Creative problem solver with an eye for design and detail  1513 An up-to-date knowledge of user interaction design principles and usability methodologies GMV2015 Experience applying research and analysis to product/software development  1513 Practical knowledge of 3D rendering software GMV108 Experience in Industrial DesignGMV1513 Interpersonal skills  1513 Experience in large ammounts of data processing  10(Desirable)