1 Dec 2012 1 SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley.

Slides:



Advertisements
Similar presentations
Georgia Tech Digital Back-end µHRG interface Curtis Mayberry School of Electrical and Computer Engineering Georgia Institute of Technology January 13 th,
Advertisements

THEMIS/GBO Engineering Peer Review 1 UCB, Oct. 17, 2003 GROUND MAGNETOMETER GBO DESIGN.
Data Acquisition Risanuri Hidayat.
Alternator Functional Diagram
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
24Oct2013 D. Seitz SPP FIELDS RFS Analog Peer Review 24OCT
SPP FIELDS Preamp Power Requirements 01DEC2012 D. Seitz.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
SPP FIELDS DFB Quarterly June 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board 1.
ISUAL Sprite Imager Electronic Design Stewart Harris.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
Sept. 2008EFW INST+SOC PDR RBSP EFW GSE and SOC-GSE GSE and SOC-GSE (Science Operations Center In Support of INT) John Bonnell Will Rachelson Matt.
Slide: 1International Conference on Electronics, Circuits, and Systems 2010 Department of Electrical and Computer Engineering University of New Mexico.
MonsonPeer Review – 24 October 2013 SPP/FIELDS LNPS PEER REVIEW Steven Monson University of Minnesota 1.
LPW Preamp/Sensor Overview Greg Delory, LPW Co-I MAVEN PFP Pre-CDR Peer Review May 10, 2011.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
MPSREFI- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW “Our Gateway to the Cape…” The Electric Field Instrument (EFI) John Bonnell University of California.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
TRIO-CINEMA 1 UCB, 2/08/2010 Instrument Interface Board Dorothy Gordon CINEMA - EE Team Space Sciences Laboratory University of California, Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
ECG Monitor Objective o Provide users an economical ECG monitoring device o Raise awareness to the importance of a healthy heart and living o Allow doctors.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
BonnellSPF AEB CDR PEER REVIEW – RESPONSES Solar Probe Plus FIELDS Antenna Electronics Board AEB I-CDR Peer Review Responses (rev A, 13 Jan 2015) J. Bonnell.
MonsonFIELDS iPDR – LNPS SPP/FIELDS Low Noise Power Supply Preliminary Design Review Steve Monson University of Minnesota 1.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 213 Low Voltage Power Supply & Power Controller Board Peter.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes LVPS+PCB Peter BergRBSP/EFW CDR /30-10/1 IDPU LVPS AND PCB Critical Design Review.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
Jun 4, SPP FIELDS Updated block diagrams Fault Tolerant Design.
SPP-FIELDS Team Mtg - 13 Dec SPP-FIELDS Slow Sweeps, Auto Bias, and All That J. W. Bonnell, UCB SSL Past experience -
19 Nov SPP-FIELDS Antenna Electronics Board (AEB) CDR Peer Review J. W. Bonnell, D. N. Seitz Space Sciences Laboratory UC Berkeley
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
NameFIELDS iPDR – Subject Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Box Selda S. Heavner U.C. Berkeley 1.
1.0 LINEAR DC POWER SUPPLY The importance of DC Power Supply Circuit For electronic circuits made up of transistors and/or ICs, this power source.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
TRIO-CINEMA 1 UCB, 2/08/2010 LVPS & Switching Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Instrument Testing to Date Michael Ludlam for EFW.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
FIELDS iPDR – RFS Analog Dennis N. Seitz 1 Solar Probe Plus FIELDS Instrument PDR Radio Frequency Spectrometer Analog Dennis N. Seitz UC Berkeley SSL
STEREO IMPACT Critical Design Review 2002 November 20,21,22 P.Berg1 STEREO IMPACT POWER SUPPLIES Peter Berg, UC Berkeley Space Sciences Lab,
Aug 7, 2012 SPP/FIELDS 1 UCB Digital Receiver to replace LESIA TNR/HFR.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
0808/0809 ADC. Block Diagram ADC ADC0808/ADC Bit μP Compatible A/D Converters with 8-Channel Multiplexer The 8-bit A/D converter uses successive.
Submitted by:.  Project overview  Block diagram  Power supply  Microcontroller  MAX232 & DB9 Connector  Relay  Relay driver  Software requirements.
Preamps (PRE) and Sensors Rachel Hochman John Bonnell Space Sciences Laboratory University of California, Berkeley CDR September 30-October1, 2009 RBSP-EFW.
PXD – DEPFET PS noise emission tests Mateo Iglesias Fernando Arteche.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
C osmic R Ay T elescope for the E ffects of R adiation 27 June 2005 Digital Engineering Digital Sub-System Bob Goeke.
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Boom Electronics Board (BEB) Engineering Peer Review Oct
SPP-FIELDS Slow Sweeps, Auto Bias, and All That - UPDATE
OVER VOLTAGE OR UNDER VOLTAGE
Calorimeter Mu2e Development electronics Front-end Review
CTA-LST meeting February 2015
SPP FIELDS Preamplifier
PC Mouse operated Electrical Load Control Using VB Application
Electric Field and Waves Instrument (EFW)
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
SP+ DFB REE 12/01/12.
Boom Electronics Board (BEB) EFW-EMFISIS E-Field I/F (EFW-EMF)
Boom Electronics Board (BEB)
Preliminary Design Review
Low Voltage Power Supply & Power Controller Board
MAINS SUPPLY SENSED Over Voltage
Electronics: Demod + 4Q FE
Presentation transcript:

1 Dec SPP-Fields Antenna Electronics Board (AEB) Concept Status Report J.W.Bonnell, S. Harris, S. Heavner Space Sciences Laboratory UC Berkeley (as presented by W. Rachelson)

1 Dec 2012 Summary Full time engineering support now available (Heavner), with part-time Science (Bonnell) and Systems (Harris) support as well for the AEB effort, so design progress is being made. Close collaboration with PA design effort (Seitz, Bonnell, Goetz) to keep relevant interfaces (power, signal, noise) consistent. Specification of breadboard (BB) AEB complete (1 channel – FGND, BIAS, STUB, SUN_SHIELD, +/- 100-V fixed, +/- 15-V floater). AEB BB Design in progress (through Dec 2012): –Parts selection (switching supply drivers, DACs, bias output section transistors) –Schematic and bill of materials (BB and parallel 3DPlus packaging effort) 2 ActionTime Frame AEB BB Specification and DesignThrough Dec 2012 AEB BB Proc, Fab, and AssyJan Apr 2013 AEB BB Electrical Test and INT (LF-PA)Apr 2013 – May 2013 AEB ETU Design, Proc, Fab, Assy, and TestJun 2013 – Jan 2014 Fields I-PDRLate Oct 2013 Fields ETU INTFeb 2014 – Apr 2014

1 Dec 2012 Scope of AEB Design Effort Antenna Electronics Board (AEB, see following block diagram slide) –FGND Driver: 1 channel each for 4 forward whips. 1 channel for aft whip or dipole (TBR). –Sensor bias current, Stub and Shield bias voltage drivers: 4 channels of each for 4 forward whips. 1 channel of TBD subset for aft whip or dipole. –Whip preamp bias range relay control: 1 channel each for 4 forward whips. TBD channel for aft whip or dipole. –Floating and HV output stage Power Supplies: 2 floaters to support opposing pairs of forward whips. 1 floater (TBR) to support aft whip or dipole. 1 HV (+/- 100-V) supply to support FGND and bias driver output stages. –Serial Command and Data (HSK) I/F to ICU. Preamp-to-AEB Harnessing (TBR). AEB-to-DFB Harnessing in MEB (TBR). 3

1 Dec 2012 AEB – Block Diagram AEB-4 Replace with simple serial interface to ICU. CAL deleted. Floaters (1/axis) and HV NOT part of estimate for proposed AEB (assumed part of LNPS). Possible Channel 5 to support 3 rd axis/tail sensor.

1 Dec 2012 AEB – Power Service Concept AEB-5 AEB uses existing switching supply designs (THEMIS, RBSP). There will be changes to magnetics to accommodate changes in driver frequencies and SYNC requirements. AEB takes regulated, filtered supplies from LNPS and providing following supplies: ± 100-V supply (bias output stages). ± 12-V analog (AEB input stages). ± 15-V floaters (LF-PA supplies).

1 Dec 2012 AEB Requirements (Dec 2012) Preamp signal characteristics –DC voltage level: ± 60Vdc w.r.t. AGND (THEMIS-EFI-BEB) –AC voltage level: ± 10V w.r.t. floating ground (± 13V capability; RBSP-EFW-PRE) Floating Ground Driver –Input: LF Preamp signal –Input filter roll off: 500 Hz (TBR; RBSP-EFW-BEB) –Output voltage level: ± 60Vdc w.r.t. AGND –Floating supply rails: ± 15Vdc (RBSP-EFW-BEB, -PRE) Bias, Stub, Shield Drivers –Reference Input: LF Preamp signal –Reference input filter roll off: 500 Hz (TBR; RBSP-EFW-BEB, match FGND) –Output voltage level: Vref ± 40Vdc (max, programmable) w.r.t. AGND –DAC resolution: 16-bit (TBR; RBSP-EFW-BEB, THEMIS-EFI-BEB) Max voltage required: ±100V (THEMIS-EFI-BEB and IDPU-LVPS) Noise voltages at Bias, Stub, and Shield outputs consistent with noise floor requirements and predicted coupling to antenna (TBD). 6

1 Dec 2012 Challenges and Plan for AEB Design Effort Adapting existing THEMIS (BEB, LVPS) and RBSP-EFW (PRE) designs for SPP environments, resources, and requirements (all Phase B): –Equally challenging radiation environment than THEMIS or RBSP, but less mass resources available for shielding: Compile initial BOM, review against TID and SEE, and re-select parts as needed. –More functionality (bias control AND power supply) to pack into same or smaller PWB area, mass and power allocation than THEMIS, RBSP (and MEL values!): Prepare initial layout using elements of existing designs to prove fit to PWA area. Determine realistic mass and power estimates from elements of existing designs to refine mass and power impact of design options (e.g. 3 rd axis measurement). Consider and evaluate alternate part types (e.g. SMD rather than through-hole 100-V transistors) to trade change in design against mass/power/thermal benefits. Demonstrating DC-LF compatability with MF and HF noise floor requirements: –HF noise floor requirements are one or two orders of magnitude more strict than THEMIS or RBSP: Build breadboard channel, including floater and HV supplies using existing flight spare parts/hardware to allow for noise generation/succeptability testing and prove concept design will meet noise floor requirements at antenna (Phase B/early Phase CD). 7

1 Dec 2012 BACKUP SLIDES 8

1 Dec 2012 AEB – Mass Estimates (June 2012) AEB-9 Floating and HV supply mass impact significant – minimum two-axis system is almost twice the mass carried in the proposal MEL! Mass estimate needs to be refined with reference to THEMIS 100-V system, rather than RBSP-EFW 225-V system based on design decisions from June 2012.

1 Dec 2012 AEB – Power Estimates (June 2012) AEB-10 BEB power consumption can be significant. Power estimate needs to be refined with reference to THEMIS 100-V system, rather than RBSP-EFW 225- V system based on design decisions from June 2012.