PODGORCA AIRPORT RECONSTRUCTION PROJECT THE NEW APPROACH FOR APRON DRAINAGE SYSTEM.

Slides:



Advertisements
Similar presentations
The Flood hydrograph A brief explanation-
Advertisements

HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012.
Design of W.W. Collection System
WHAT IS RAINWATER HARVESTING?? Collection of clean FREE rainwater from our roof that would otherwise be going “down the drain” Rainwater is re-used through.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Raised Bed Gardening Prepared by: L. Robert Barber, & Ilene Iriarte For: Guam Cooperative Extension Service & Guam Department of Agriculture Funding provided.
WATER MANAGEMENT SYSTEM FOR A HOSTEL BLOCK OF JADAVPUR UNIVERSITY, KOLKATA A PRESENTATION BY : PROBHASH KUMAR BISWAS TIRTHANKAR SARKAR.
GROUNDWATER CONTROL.
Hydrograph Interpretation.
Agricultural Pond Private Engineering Resources & Costs Agricultural Water Resource Development Workshops Presented by: Cavanaugh & Associates P.A. 530.
CLIMATE ADAPTATION, INNOVATIVE SUDS AND PROTECTION OF HARRESTRUP Å By Sille Lyster Larsen, Grontmij & Vinni Rønde, MSc Hydrology, Wageningen UR Retrofitting.
Flow Survey Management Planning & Data Auditing Ravikeerti S. Patil 25 June 2010.
CE 3372 Water Systems Design
Infiltration Introduction Green Ampt method Ponding time
Chapter 3 -Hydrology Hwk#3 - pp ,4,7,11 Hydrologic Cycle Runoff - Ground Surface Water Infiltration - Ground Penetration (percolation) Transpiration.
Training on Roads for Water and Resilience. ROADS CROSSING RIVER BEDS.
Sanitary Engineering Lecture 16
Kosovo Energy System. Energy Situation Production of electricity is monopoly of “Kosovo Energy Company” (KEK) Main energy sources Coal fired power stations.
SOIL PROBLEMS POROSITY, PERMEABILITY, RETENTION. 1a) Given information: Cross sectional area = (п)(r 2 ) Volume of water = 50 ml Permeability = 10 sec.
URBAN STORMWATER QUALITY AND LOAD ESTIMATION FROM URBAN RESIDENTIAL AREA IN SKUDAI, JOHOR, MALAYSIA Siti Nazahiyah Bte Rahmat Faculty of Civil and Environmental.
Sustainable Development: Practical Solutions to Real World Problems Fishkill, NY November 7, 2012 Low Impact Development and Rainwater Harvesting Solutions.
1 Topic II. 5. Rain Measurement: Parameters, Pluviographs, Hyetographs and Hydrographs. Selection of Design Rain Rain Parameters §Rain duration - t, min.
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Underground Systems: Hydraulic Design
Algebra Readiness Chapter 4 Section : Compare and Order Integers The numbers , -3, -2, -1, 0, 1, 2, 3, 4,... are called integers. Negative.
Urban Storm Drain Design: Pump Performance Curves.
Prevention and Cure. Contents Introduction to Reservoirs Preventing Siltation Cure Cost Benefit Analysis Conclusion.
RAINWATER HARVESTING Presented by:. ARCSA: AMERICAN RAINWATER CATCHMENT SYSTEMS ASSOCIATION Mission: …to promote sustainable rainwater harvesting practices.
 It is the type of V. F. in which the width of throat is decreased to such an extent that the depth of water in throat is equal to critical depth. 
6.12a DESIGN APPROACH ON BILILO SPATE IRRIGATION PROJECT Presented by Eyob Yehayis.
(b)Study Figure 2 which is an extract from a news website about the cause of floods in Pakistan in August With the help of Figure 2 explain why.
PATENTED GERMAN ENGINEERED UNDERGROUND TANKS PATENTED ABOVE GROUND SLIMLINE TANKS WORLD CLASS FILTRATION WATERMARK APPROVED PUMPS AND CONTROLLERS RAINWATER.
1 Topic I.10. Service Reservoirs: Kinds, Structures and Volume Main Functions of the Service Reservoirs: §To insure the necessary head at the water distribution.
Hydro Europe 2016 Team L Influence of the various model parameters (Hec HMS + Mike SHE) 1.
Chapter 4 Infiltration. Infiltration is the process by which precipitation moves downward through the surface of the earth. Infiltration replenishes soil.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
Renewable Heat Incentive Andrej Miller RHI team Department of Energy and Climate Change.
DIAPHRAGM WALLS.
Sanitary Engineering Lecture 4
New Orleans Green Roof Project JP Luster. New Orleans Flooding Problems  Geography  90 miles of underground and above ground canals  22 pumping stations.
STORMWATER MASTER PLAN TASK FORCE November 20, 2006.
Precipitation Measurement
Potential Pollutants Sediment Chemical N, P, Pesticides, Oil & Grease
Modified Rational Method
Water in the atmosphere
Construction Analysis Hydrographs
Hydrologic Analysis (Bedient chapter 2)
Infiltration and unsaturated flow (Mays p )
5th FCC Infrastructure & Operation meeting
Coursework guidelines
Infiltration and unsaturated flow (Mays p )
Modified Rational Method
FUSIBILITY STUDY OF GAMBELLA IRRIGATION PROJECTS NOVEMBER 2017.
Chapter 3 -Hydrology Hwk#3 - pp ,4,7,11 Hydrologic Cycle
An-Najah National University Faculty of Engineering
Infiltration and unsaturated flow
THE NEW APPROACH FOR APRON + PLATFORM DRAINAGE SYSTEM /
Topic II. 6. Determination of Design Runoff Quantity: Rational Method
Logan Dry Canyon Detention Basin Design Case Study
Infiltration.
Find: Daily Pumping Cost [$]
Assoc.Prof. dr.tarkan erdik
Preciptation.
Love Field Modernization Program
Preciptation.
Hydrology The study of water.
Definition of Floods Flood: Overflows of large amounts of water onto land that is normally dry. Coastal flood: Happens near a coast River flood: River.
Class Tasks Q1: Water flows into a process unit through a 5-cm ID pipe at a rate of 4.00 m3/h. Calculate Ėk for this stream in joules/second. Q2: Water.
Presentation transcript:

PODGORCA AIRPORT RECONSTRUCTION PROJECT THE NEW APPROACH FOR APRON DRAINAGE SYSTEM

Scheme of a new drainage system

Rainfall intensity and duration for return period of 2 years Duration in min Rain intensity ATKINSAEROINZENEJRING l/s/hamm/hl/s/hamm/h

Scheme for left side drainage system

HYDROGRAPH FOR RAIN DURATION 5 min IN LEFT OIL SEPARATOR Q=20 l/s

HYDROGRAPH FOR RAIN DURATION OF 7 min IN THE LEFT OIL SEPARATOR Q=20 l/s

HYDROGRAPH FOR RAIN DURATION OF 10 min IN THE LEFT OIL SEPARATOR Q=20 l/s

VOLUME OF RUNNOF IN OIL SEPARATOR FOR RAINFALL DURATION OF 10 MIN MAX VOLUME DURATION OF FIRST FLUSH (POLLUTED) OF APPR 6 MIN The first wave of polluted water Retention volume to stop first wave app 80 m m3/s

Longitudinal section of detention pond of 80m3, oil separator 20 l/s and by-pass

Plan view of detention pond of 80m 3, oil separator 20 l/s and by-pass - left system

Scheme for the right side drainage system

HYDROGRAPH FOR RAIN DURATION OF 7 min IN THE RIGHT SYSTEM OIL SEPARATOR Q=20 l/s

HYDROGRAPH FOR RAIN DURATION OF 10 min IN THE RIGHT SYSTEM OIL SEPARATOR Q=20 l/s

HYDROGRAPH FOR RAIN DURATION OF 5 min IN THE RIGHT SYSTEM OIL SEPARATOR Q=20 l/s

VOLUME OD RUNNOFF VOLUME IN THE RIGHT SYSTEM OIL SEPARATOR FOR RAIN DURATION OF 10 MIN AND 260m 3, DURATION OF FIRST FLUSH OF APPR 6 MIN AND VOLUME OF THE FIRST FLUSH OF 78m m3/s

COMPARATION ATKINSAEROINŽENJERING OIL SEPARATORSat least 5 objects of the capacity ( )/5 = 225 l/s, or 4 with by-pass capacity of 250 l/s Max 2 capacity of 20l/s Concrete bed of 20 cm 120 m 2, 30 m 3 10 m 2, 2.5 m 3 Excavation600 m m 3 Superstructure, ponds, none60 m 3, 6 tone of reinforcement Equipment2 pumps FLYGT 5 m, 10 l/s and 2 kW, d. c. i. of 2 tones

CONCLUSION Proposed solution of the oil separator installation to be just above the ground instead of large excavation and 5 m depth of covering. Easier approach for oil suction and also silt disposal. Negligible higher expenses due to energy consumption for pollution water pumping.