Chapter 2: Probability Random Variable (r.v.) is a variable whose value is unknown until it is observed. The value of a random variable results from an.
Chapter 4 Discrete Random Variables and Probability Distributions
11-1 Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Discrete Random Variables and Probability Distributions
FRM Zvi Wiener Following P. Jorion, Financial Risk Manager Handbook Financial Risk Management.
Business 90: Business Statistics
Copyright © 2009 Pearson Education, Inc. Chapter 16 Random Variables.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 5-1 Chapter 5 Some Important Discrete Probability Distributions Statistics.
TODAY Homework 4 comments Week in review -Joint Distribution -Binomial Distribution -Central Limit Theorem Sample problems.
1-1 Copyright © 2015, 2010, 2007 Pearson Education, Inc. Chapter 15, Slide 1 Chapter 15 Random Variables.
Chap 5-1 Copyright ©2012 Pearson Education, Inc. publishing as Prentice Hall Chap 5-1 Chapter 5 Discrete Probability Distributions Basic Business Statistics.
Chapter 16: Random Variables
Review of Probability and Statistics
The joint probability distribution function of X and Y is denoted by f XY (x,y). The marginal probability distribution function of X, f X (x) is obtained.
Lecture 4 Rescaling, Sum and difference of random variables: simple algebra for mean and standard deviation (X+Y) 2 =X 2 + Y XY E (X+Y) 2 = EX 2.
Class 7 Portfolio Analysis. Risk and Uncertainty n Almost all business decisions are made in the face of risk and uncertainty. n So far we have side-stepped.
Copyright © 2010 Pearson Education, Inc. Slide
Probability and Probability Distributions
Application of Random Variables
Copyright © 2011 Pearson Education, Inc. The Normal Probability Model Chapter 12.
Copyright © 2011 Pearson Education, Inc. Probability Models for Counts Chapter 11.
Definition of Covariance The covariance of X & Y, denoted Cov(X,Y), is the number where  X = E(X) and  Y = E(Y). Computational Formula:
Chapter 5 Discrete Random Variables and Probability Distributions ©
Copyright © 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 16 Random Variables.
Copyright © 2010 Pearson Education, Inc. Chapter 16 Random Variables.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 16 Random Variables.
Two Random Variables W&W, Chapter 5. Joint Distributions So far we have been talking about the probability of a single variable, or a variable conditional.
Copyright © 2011 Pearson Education, Inc. Comparison Chapter 18.
0 K. Salah 2. Review of Probability and Statistics Refs: Law & Kelton, Chapter 4.
1 Chapter 16 Random Variables. 2 Expected Value: Center A random variable assumes a value based on the outcome of a random event.  We use a capital letter,
Random Variables and Probability Models
Chapter 16 Random Variables
Copyright © 2014, 2011 Pearson Education, Inc. 1 Chapter 11 Probability Models for Counts.
Copyright © 2014, 2011 Pearson Education, Inc. 1 Chapter 19 Linear Patterns.
Copyright © 2014, 2011 Pearson Education, Inc. 1 Chapter 12 The Normal Probability Model.
1 G Lect 2M Examples of Correlation Random variables and manipulated variables Thinking about joint distributions Thinking about marginal distributions:
Chapter 16 Random Variables Random Variable Variable that assumes any of several different values as a result of some random event. Denoted by X Discrete.
Copyright © 2010, 2007, 2004 Pearson Education, Inc. Chapter 16 Random Variables.
Slide 16-1 Copyright © 2004 Pearson Education, Inc.
7 sum of RVs. 7-1: variance of Z Find the variance of Z = X+Y by using Var(X), Var(Y), and Cov(X,Y)
Review of Probability. Important Topics 1 Random Variables and Probability Distributions 2 Expected Values, Mean, and Variance 3 Two Random Variables.
Lecture 3 1 Recap Random variables Continuous random variable Sample space has infinitely many elements The density function f(x) is a continuous function.
Copyright © 2011 Pearson Education, Inc. Random Variables Chapter 9.
Copyright © 2014, 2011 Pearson Education, Inc. 1 Active Learning Lecture Slides For use with Classroom Response Systems Chapter 9 Random Variables.
Copyright © 2014, 2011 Pearson Education, Inc. 1 Chapter 9 Random Variables.
Copyright © 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Chapter 16 Random Variables.
Copyright © 2010 Pearson Education, Inc. Chapter 16 Random Variables.
Class Business Debate #2 Upcoming Groupwork – Spreadsheet Spreadsheet.
Expected Return and Risk. Explain how expected return and risk for securities are determined. Explain how expected return and risk for portfolios are.
Chapter 4 Discrete Random Variables and Probability Distributions
Chapter 16 Random Variables math2200. Life insurance A life insurance policy: –Pay $10,000 when the client dies –Pay $5,000 if the client is permanently.
Chapter 15 Random Variables.
Discrete Random Variables
Chapter 15 Random Variables
Chapter 16 Random Variables.
Probability Models for Counts
Random Variables and Probability Models
Chapter 16 Random Variables
Keller: Stats for Mgmt & Econ, 7th Ed
Chapter 16 Random Variables.
Chapter 15 Random Variables.
Chapter 16 Random Variables Copyright © 2009 Pearson Education, Inc.
Combining Random Variables
Chapter 16 Random Variables Copyright © 2010 Pearson Education, Inc.
Discrete Random Variables and Probability Distributions
Mathematical Expectation
Presentation transcript:

Copyright © 2011 Pearson Education, Inc. Association between Random Variables Chapter 10

10.1 Portfolios and Random Variables How should money be allocated among several stocks that form a portfolio?  Need to manipulate several random variables at once to understand portfolios  Since stocks tend to rise and fall together, random variables for these events must capture dependence Copyright © 2011 Pearson Education, Inc. 3 of 44

10.1 Portfolios and Random Variables Two Random Variables  Suppose a day trader can buy stock in two companies, IBM and Microsoft, at $100 per share  X denotes the change in value of IBM  Y denotes the change in value of Microsoft Copyright © 2011 Pearson Education, Inc. 4 of 44

10.1 Portfolios and Random Variables Probability Distribution for the Two Stocks Copyright © 2011 Pearson Education, Inc. 5 of 44

10.1 Portfolios and Random Variables Comparisons and the Sharpe Ratio The day trader can invest $200 in  Two shares of IBM;  Two shares of Microsoft; or  One share of each Copyright © 2011 Pearson Education, Inc. 6 of 44

10.1 Portfolios and Random Variables Which portfolio should she choose? Summary of the Two Single Stock Portfolios Copyright © 2011 Pearson Education, Inc. 7 of 44

10.2 Joint Probability Distribution Find Sharpe Ratio for Two Stock Portfolio  Combines two different random variables (X and Y) that are not independent  Need joint probability distribution that gives probabilities for events of the form (X = x and Y = y) Copyright © 2011 Pearson Education, Inc. 8 of 44

10.2 Joint Probability Distribution Joint Probability Distribution of X and Y Copyright © 2011 Pearson Education, Inc. 9 of 44

10.2 Joint Probability Distribution Independent Random Variables Two random variables are independent if (and only if) the joint probability distribution is the product of the marginal distributions. p(x,y) = p(x) p(y) for all x,y Copyright © 2011 Pearson Education, Inc. 10 of 44

10.2 Joint Probability Distribution Multiplication Rule The expected value of a product of independent random variables is the product of their expected values. E(XY) = E(X)E(Y) Copyright © 2011 Pearson Education, Inc. 11 of 44

4M Example 10.1: EXCHANGE RATES Motivation A firm’s sales in Europe average 10 million € each month. The current exchange rate is 1.40$/€ but it fluctuates. What should this firm expect for the dollar value of European sales next month? Copyright © 2011 Pearson Education, Inc. 12 of 44

4M Example 10.1: EXCHANGE RATES Motivation Fluctuating Exchange Rates Copyright © 2011 Pearson Education, Inc. 13 of 44

4M Example 10.1: EXCHANGE RATES Method Identify three random variables: S = sales next month in €; R = exchange rate next month; and D = value of sales in $. These are related by D = S R. Find E(D). Copyright © 2011 Pearson Education, Inc. 14 of 44

4M Example 10.1: EXCHANGE RATES Mechanics Assume E(R) = 1.40$/€ and independence between S and R. E(D) = E(R S) = E(S) E(R) = € 10,000, = $14 million Copyright © 2011 Pearson Education, Inc. 15 of 44

4M Example 10.1: EXCHANGE RATES Message European sales for next month convert to $14 million, on average. We assume that sales next month are, on average, the same as in the past for this firm and that sales and exchange rate are independent. Copyright © 2011 Pearson Education, Inc. 16 of 44

10.2 Joint Probability Distribution Dependent Random Variables  Joint probability table shows changes in values of IBM and Microsoft (X and Y) are dependent  The dependence between them is positive Copyright © 2011 Pearson Education, Inc. 17 of 44

10.3 Sums of Random Variables Addition Rule for Expected Value of a Sum The expected value of a sum of random variables is the sum of their expected values. E(X + Y) = E(X) + E(Y) Copyright © 2011 Pearson Education, Inc. 18 of 44

10.3 Sums of Random Variables Addition Rule for Expected Value of a Sum The mean of the portfolio that mixes IBM and Microsoft is E(X + Y) = µ x + µ Y = = $ 0.22 Copyright © 2011 Pearson Education, Inc. 19 of 44

10.3 Sums of Random Variables Variance of a Sum of Random Variables The variance of a sum of random variables is not necessarily the sum of the variances. The variance for the portfolio that mixes IBM and Microsoft is larger than the sum: Var(X + Y) = $ 2 Copyright © 2011 Pearson Education, Inc. 20 of 44

10.3 Sums of Random Variables Sharpe Ratio for Mixed Portfolio Copyright © 2011 Pearson Education, Inc. 21 of 44

10.3 Sums of Random Variables Summary of Sharpe Ratios (Shows Advantage of Diversifying) Copyright © 2011 Pearson Education, Inc. 22 of 44

10.4 Dependence Between Random Variables Covariance The covariance between random variables is the expected value of the product of deviations from the means. Cov(X,Y) = E((X - µ X ) (Y - µ Y )) Copyright © 2011 Pearson Education, Inc. 23 of 44

10.4 Dependence Between Random Variables Positive Dependence Between X and Y Copyright © 2011 Pearson Education, Inc. 24 of 44

10.4 Dependence Between Random Variables Covariance and Sums The variance of the sum of two random variables is the sum of their variances plus twice their covariance. Var(X + Y) = Var(X) + Var(Y) + 2Cov(X,Y) Copyright © 2011 Pearson Education, Inc. 25 of 44

10.4 Dependence Between Random Variables Using the Addition Rule for Variances We get the following for the mixed portfolio: Copyright © 2011 Pearson Education, Inc. 26 of 44

10.4 Dependence Between Random Variables Correlation The correlation between two random variables is the covariance divided by the product of standard deviations. Corr(X,Y) = Cov(X,Y)/σ x σ Y Copyright © 2011 Pearson Education, Inc. 27 of 44

10.4 Dependence Between Random Variables Correlation  Denoted by the parameter ρ (“rho”)  Is always between -1 and 1  For the mixed portfolio, ρ = 0.43 Copyright © 2011 Pearson Education, Inc. 28 of 44

10.4 Dependence Between Random Variables Joint Distribution with ρ = -1 Copyright © 2011 Pearson Education, Inc. 29 of 44

10.4 Dependence Between Random Variables Joint Distribution with ρ = 1 Copyright © 2011 Pearson Education, Inc. 30 of 44

10.4 Dependence Between Random Variables Covariance, Correlation and Independence  A correlation of zero does not necessarily imply independence  Independence does imply that the covariance and correlation are zero Copyright © 2011 Pearson Education, Inc. 31 of 44

10.4 Dependence Between Random Variables Addition Rule for Variances of Independent Random Variables The variance of the sum of independent random variables is the sum of their variances. Var(X + Y) = Var(X) + Var(Y) Copyright © 2011 Pearson Education, Inc. 32 of 44

10.5 IID Random Variables Definition  Random variables that are independent of each other and share a common probability distribution are said to be independent and identically distributed.  iid for short Copyright © 2011 Pearson Education, Inc. 33 of 44

10.5 IID Random Variables Addition Rule for iid Random Variables If n random variables (X 1, X 2, …, X n ) are iid with mean µ x and standard deviation σ x, E(X 1 + X 2 +…+ X n ) = nµ x Var(X 1 + X 2 +…+ X n ) = nσ x 2 SD(X 1 + X 2 +…+ X n ) = σ x Copyright © 2011 Pearson Education, Inc. 34 of 44

10.5 IID Random Variables IID Data Strong link between iid random variables and data with no pattern (e.g., IBM stock value changes) Copyright © 2011 Pearson Education, Inc. 35 of 44

10.6 Weighted Sums Addition Rule for Weighted Sums The expected value of a weighted sum of random variables is the weighted sum of the expected values. E(aX + bY + c) = aE(X) + bE(Y) + c Copyright © 2011 Pearson Education, Inc. 36 of 44

10.6 Weighted Sums Addition Rule for Weighted Sums The variance of a weighted sum of random variables is Var(aX + bY + c) = a 2 Var(X) + b 2 Var(Y) + 2abCov(X,Y) Copyright © 2011 Pearson Education, Inc. 37 of 44

4M Example 10.2: CONSTRUCTION ESTIMATES Motivation Adding an addition to a home typically takes two carpenters working 240 hours with a standard deviation of 40 hours. Electrical work takes an average of 12 hours with standard deviation 4 hours. Carpenters charge $45/hour and electricians charge $80/hour. The amount of both types of labor could vary with ρ =0.5. What is the total expected labor cost? Copyright © 2011 Pearson Education, Inc. 38 of 44

4M Example 10.2: CONSTRUCTION ESTIMATES Method Identify three random variables: X = number of carpentry hours; Y = number of electrician hours; and T = total costs ($). These are related by T = 45X + 80Y. Copyright © 2011 Pearson Education, Inc. 39 of 44

4M Example 10.2: CONSTRUCTION ESTIMATES Mechanics: Find E(T) Using Addition Rule for Weighted Sums Copyright © 2011 Pearson Education, Inc. 40 of 44

4M Example 10.2: CONSTRUCTION ESTIMATES Mechanics: Find Var(T) Using the Addition Rule for Weighted Sums Copyright © 2011 Pearson Education, Inc. 41 of 44

4M Example 10.2: CONSTRUCTION ESTIMATES Message The expected total cost for labor is around $12,000 with a standard deviation of about $2,000. Copyright © 2011 Pearson Education, Inc. 42 of 44

Best Practices  Consider the possibility of dependence.  Only add variances for random variables that are uncorrelated.  Use several random variables to capture different features of a problem.  Use new symbols for each random variable. Copyright © 2011 Pearson Education, Inc. 43 of 44

Pitfalls  Do not think that uncorrelated random variables are independent.  Don’t forget the covariance when finding the variance of a sum.  Never add standard deviations of random variables.  Don’t mistake Var(X – Y) for Var(X) – Var(Y). Copyright © 2011 Pearson Education, Inc. 44 of 44