April 6, 2012 1 CEQA Energy Division First Friday Forum.

Slides:



Advertisements
Similar presentations
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
Advertisements

Planning Commission, City of Brisbane Public Hearing for the Sierra Point Biotech Project November 29, 2007 SIERRA POINT BIOTECH PROJECT.
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
May 2013 Tehachapi Renewable Transmission Project (TRTP)
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
Conference on Environmental Assessments in Federations A Montana Perspective September 14, 2009 Tom Livers, Deputy Director Montana Department of Environmental.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
SOUTH COAST RESOURCE MANAGEMENT PLAN REVISION BUREAU OF LAND MANAGEMENT Palm Springs-South Coast Field Office California Desert District.
SOUTHERN CALIFORNIA EDISON® SM Transmission Expansion Cost Drivers NARUC Portland, Oregon David Mead Vice President, Engineering Southern California Edison.
1 State Water Resources Control Board Environmental Review for State Bond Funded Grant Projects Presented by Lisa Lee, Environmental Review Unit.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
Regulations Governing Siting of Electric Facilities in California AEP Orange County Chapter June 30, 2009 Christine McLeod, Project Manager - Regulatory.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Renewable Energy and the BLM May 4, 2009 Ashley Conrad-Saydah BLM Renewable Energy Project Manager.
Charles Hosken, General Manager Imperial Irrigation District
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Washington State Energy Facility Site Evaluation Council Jim Luce, EFSEC Chair Port Of Vancouver Presentation Vancouver, WA June 27, 2013 EFSEC These Slides.
Alternative Energy on the Outer Continental Shelf Robert P. LaBelle Deputy Associate Director Offshore Energy and Minerals Management Minerals Management.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Delta Plan Draft Program EIR Status and Summary of Approach October 27, 2011 Not Reviewed/Approved by Delta Stewardship Council1October 27, 2011.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
CALENDAR ITEM 101 FINAL ENVIRONMENTAL IMPACT REPORT (EIR) S A N F R A N C I S C O B A Y A N D D E L T A S A N D M I N I N G P R O J E C T STATE CLEARINGHOUSE.
MARCH 13, 2014 CCC HEARING SOUTH BAY SUBSTATION RELOCATION PROJECT (SDG&E) CDP #E ; Th11b.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
Gregory Canyon Landfill San Diego County LEA Gary Erbeck, Director California Integrated Waste Management Board Hearing December 14-15, 2004.
Hidden Hills Solar Energy Generating System (HHSEGS) Presentation to Inyo County Board of Supervisors March 13, 2012.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
WGA Consultants Keyes & Fox LLP is a law firm that specializes in the renewable energy and distributed generation sectors. K&F has in-depth experience.
CEQA 101 CEQA City of Sacramento Community Development Dept. March 2016.
INTERSTATE PIPELINE FORUM Presented by: Rebecca F. Zachas, Esq.
Scoping Meeting August 25, 2010 Project Description, and California Environmental Quality Act (CEQA), Overview.
Joint Public Hearing - Closed Redevelopment Agency & City Council Amended and Restated Redevelopment Plan for the North Stockton Redevelopment Project.
Environmental Scoping Meeting April 9, Meeting Outline Overview of the Proposed Project Purpose of the Scoping Meeting Environmental Review Process.
LAKE FOREST SPORTS PARK SCOPING MEETING JUNE 23, 2009.
San Francisco Public Utilities Commission Water System Improvement Program Bay Division Pipeline Project July 14, 2009.
Welcome to the Public Comment Hearing on the Proposed Regulatory Update to the California Environmental Quality Act AB 52, Gatto (2014) Heather Baugh Assistant.
1 “Fair Argument” Test Triggering EIR: Friends of “B” Street v City of Hayward Facts & Issue Trial court: city abused discretion in adopting negative declaration.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
Scoping Meeting April 20th 6:00 pm
Overview of the Draft EIR
Providence Saint John’s Health Center Phase II Project
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
City of Los Angeles Department of Public Works Bureau of Engineering
Overview What is the CEQA environmental review process?
Fifth Standard Solar Project Complex
City of Los Angeles Department of Public Works Bureau of Engineering
SEQRA as a Tool to Review Energy Projects
Vista Verde Residential Project Environmental Impact Report Public Scoping Meeting May 19, 2010 Michael Brandman Associates.
Final Environmental Impact Report
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

April 6, CEQA Energy Division First Friday Forum

April 6, What Does the CEQA Team Do? Environmental review pursuant to the California Environmental Quality Act Transmission | Telco | Water/Sewer |Natural Gas Storage | Section 851 Divestitures Construction monitoring after projects are approved Interagency initiatives –Desert Renewable Energy Conservation Plan –Renewable Energy Transmission Initiative –Solar Programmatic Environmental Impact Statement –Renewable Energy Policy Group

April 6, What is CEQA? CEQA requires state and local agencies to: –evaluate and disclose to decision makers and the public the environmental impacts of their actions; and – avoid or mitigate those impacts, if feasible CEQA is triggered when a public agency must take discretionary action when reviewing a proposed project CPUC CEQA cases are challenged at the CA Supreme Court

April 6, CEQA Objectives Make public and disclose environmental impacts of projects Mitigate or avoid environmental damage Encourage public participation Disclose reasons for project approval if the project creates unavoidable impacts

April 6, CEQA Impact Areas Aesthetics Agricultural Resources Air Quality (GHG) Biological Resources Cultural Resources Geology/Soils Hazards & Hazardous Materials Hydrology/Water Quality Land Use/Planning Mineral Resources Noise Population/Housing Public Services Recreation Transportation/Traffic Utilities/Service Systems Social and Economic

April 6, El Casco Fossil Find

April 6, Impacts of the “Whole of the Action” Environmental review must consider impacts of related or connected actions that could result from approval of the proposed project For example: If a utility proposes a substation that could result in additional power plants, the Commission must assess the impacts from the power plants at the level of detail available Although the Commission may assess impacts from connected actions, it does not permit the power plants

April 6, Mitigation Measures BIO – California Tiger Salamander Exclusion Fencing Work sites are surveyed for CTS Exclusion fencing is installed to prevent CTS from entering and provides an exit if trapped within the fencing

April 6, Mitigation Measures AIR – Fugitive Dust Control Rumble strips prevent work trucks from tracking dirt onto roadways and spreading noxious weeds into other areas Other measures include wash stations between the working area and the road and spraying the roads with a water truck

April 6, Environmental Documents Findings from the Initial Study of environmental impacts determines the type of document Negative Declaration (ND) –The project creates no significant impacts Mitigated Negative Declaration (MND) –The project creates significant impacts, but the impacts can be avoided or mitigated

April 6, Environmental Documents Environmental Impact Report (EIR) –The project may cause significant impacts that cannot be avoided or mitigated to a level that is less than significant –Includes alternatives analysis –The environmentally superior alternative must be chosen if feasible –Cost is not a factor unless economically infeasible

April 6, Joint Federal/State Documents The National Environmental Policy Act (NEPA) applies to Federal agencies The CPUC frequently produces joint CEQA/NEPA documents with federal agencies Memorandums of Understanding define each agency’s duties Agencies together produce a joint EIR/EIS but only make decisions for projects within their respective jurisdiction

April 6, Public Participation Scoping meetings allow the public to raise issues before environmental review begins Public notice is required when an application is filed and at important milestones The public has the opportunity to comment CPUC responds to all public comments

April 6, Agency Coordination CA Dept. of Fish and Game US Fish and Wildlife Service US Forest Service Bureau of Land Management Caltrans Air Quality Management Districts CA Coastal Commission Army Corps Of Engineers Department of Water Resources State Historic Preservation Office Native American Heritage Commission State Water Resources Control Board State Lands Commission

April 6, CEQA at the CPUC Two stages: Project review and approval –6-12 months for Mitigated Negative Declaration –1-2 years for Environmental Impact Report –Sunrise and Tehachapi: 2.5 years (both joint CEQA/NEPA documents) Construction Monitoring –1-5 years –Sunrise 6 years, Tehachapi 5+ years

April 6, Section 851 Divestures Sales, leasing, and transfer of utility assets Divestiture of power plants; ownership interest in shared facilities; watershed conservation lands; surplus property Entering into leases and granting easements - residential and commercial Streamlined Advice Letter pilot program for certain types of transactions

April 6, Transmission Project Review and Approval Types of Applications Certificate of Public Convenience and Necessity (CPCN) –Transmission lines greater than or equal to 200 kV –Requires a review of need and cost Permit to Construct (PTC) –Power lines greater than 50kV and less than 200 kV –Substations greater than 50kV and less than 200 kV –Does not require a review of need and cost Need may become an issue if there are overriding considerations

April 6, Two Parallel Review Processes Completeness review Agency Consultation Notice of Preparation Public Scoping Meeting Draft EIR Public Meeting Public Comments Final EIR CEQA Review Proponent’s Environmental Assessment Protest/Responses Filed Prehearing Conference Public Participation Hearing Scoping memo Evidentiary hearings CPUC Proceeding Application (PTC or CPCN)

April 6, One Final Approval Process Proposed and Alternate Decisions Public Comment on PD and APD CPUC vote to certify the environmental document and approve the project The document certification and project approval can be done separately, but this is rare at the CPUC and common at other agencies

April 6, Mitigation Monitoring After project approval, staff manages construction monitoring through Environmental Monitors Mitigation Monitoring, Reporting and Compliance Program –Mitigation measures –Applicant proposed measures –Communication protocols

April 6, Mitigation Monitoring Staff grants a Notice to Proceed for each stage of construction Staff first ensures compliance with all permits, plans, mitigation measures, and applicant proposed measures Staff can issue a stop work order if a utility is out of compliance

April 6, Worker Environmental Awareness Program Anyone on the project site must first attend a WEAP training. Once trained, personnel place stickers on their hard hats to show compliance with WEAP.

April 6, Atascadero PG&E project in San Luis Obispo County –Replaces existing 70kV line with new conductor –Replaces light duty steel poles and lattice steel towers –15.5 miles

April 6, Atascadero Draft Environmental Review - 7 Months –PG&E filed application and Proponent’s Environmental Assessment (PEA) –Application and PEA deemed complete –Initial Study to determine MND or EIR Public Review, Final Document - 6 Months –CPUC released Draft IS/MND and Notice of Intent to adopt MND –Public review and comment –Final IS/MND

April 6, Atascadero Construction – Approximately 2.5 years –Notice to Proceed with approved work plans –Monitoring implementation of mitigation measures

April 6, Atascadero

April 6, Atascadero

April 6, Atascadero

April 6, Lockhart (Water Valley) Substation NTPs SCE Project San Bernardino County Interconnects the 250 MW Abengoa Mojave Solar Project 220kV switching station

April 6, April 6, 2012CEQA Team First Friday Forum Lockhart (Water Valley) Substation NTPs

April 6, Major Projects

April 6, Tehachapi Renewable Transmission Project (TRTP)

April 6, Tehachapi Renewable Transmission Project Connects Tehachapi Wind Resource Area (TWRA) in Kern County to Los Angeles Basin Most of project is an upgrade of the 220 kV system to 500kV –Only 1 new right of way (ROW) Potential MW, maybe more 173 miles 3 new substations and upgrades/work at 6 other substations 3 counties, 21 cities, multiple jurisdictions

April 6,

April 6, Project Objectives Connect renewable energy (mostly wind) to the grid. Kern County has applications for 1,000 MW of solar in the western Mojave.

April 6, Application and Environmental Review SCE filed application in June 2007 Joint EIR (CEQA)/EIS (NEPA) with US Forest Service –Line goes through Angeles Forest triggering NEPA Draft EIR/EIS released February 2009 Over 2,000 comments and 15 public meetings Final EIR/EIS released October 2009 –2 years, 4 months after application was filed

April 6, Alternative Analysis EIR/EIS considered 29 alternatives –Various routes –Different technologies –Different construction technologies While the proposed project went through the City of Chino Hills, at the request of the City, an alternative route was designed to avoid the city by going through Chino Hills State Park

April 6, CPCN DECISION CPUC Decision December 2009 –2.5 years after application was filed Decision did not approve the Chino Hills State Park alternative, but chose the proposed route along the existing Right of Way through the City of Chino Hills There was considerable opposition from the City of Chino Hills which filed an Application for Rehearing (appeal) to the decision –No resolution yet

April 6, Chino Hills City of Chino Hills filed suit against SCE stating the ROW was “overburdened” Suit failed in Superior Court and was rejected by Court of Appeals and State Supreme Court

April 6, Construction Construction started in April 2010 and is about 50% complete at this time, mostly in the north –Estimated completion Summer 2015 –Originally 2013 Wind generators are starting to connect to northern section of project SCE began building towers through Chino Hills, until the CPUC stopped construction in Chino Hills in November 2011 in response to community concerns

April 6, Tehachapi Wind Project

April 6, Chino Hills SCE and Chino Hills entered into an unsuccessful Alternative Dispute Resolution (ADR) process February 2012 The Commission stay on construction in Chino Hills remains in effect while the Commission considers other possibilities Completion date may suffer more delay based on possible new alternatives for Chino Hills

April 6, Sunrise Powerlink

April 6, Sunrise In 2006, SDG&E proposed the Sunrise Powerlink –150 miles from Imperial County to San Diego County through Anza Borrego Desert State Park –500/230 kV line –500/230 kV substation Controversial project with 52 unmitigable significant impacts Required an extensive public engagement process

April 6, Existing Conditions Through Anza Borrego Existing view along SR78 towards Narrows Substation. Wood poles from an existing 69 kV line are also visible.

April 6, Simulation of Proposed Route Through ABDSP Visual simulation along SR78 towards Narrows Substation in ABDSP. The project would be located north of SR78 and the existing 69 kV line would be relocated underground.

April 6, Sunrise The CPUC prepared an 11,000 page joint EIR/EIS with BLM 27 fully analyzed alternatives, including non- park routes and non-wires In December 2008 the CPUC approved Environmentally Superior Southern Alternative –123 miles –127 mitigation measures –Route avoids Anza Borrego Desert State Park –Overall, less impactful than original proposal Project costs – $19 million environmental review, $1.9 billion to construct by June 2012

April 6, Approved Project Route

April 6, Construction 77 notices to proceed 67 variances SDG&E cited 11 times for non-Compliance 2 Stop Work Orders Issued – 1 by CPUC and 1 by USFS

April 6, Construction Challenges Construction around cultural sites Eagle nesting Bighorn sheep lambing season

April 6, Construction Challenges Construction in steep terrain Helicopter construction for 237 out of 443 towers helicopters operating daily Dropped tower outside of Plaster City Construction Yard during tower erection activities in Imperial County

April 6, Construction Challenges Dropped air compressor near Kruetzkamp Construction Yard. Hook system on the helicopter was found to be the cause of the incident and was removed from operation for evaluation Helicopter was fitted with an alternative hook system and continued operation the next day

April 6, Construction Challenges 6 miles of 230 kV undergrounding in Alpine Blvd. Business District Vault excavation on Alpine Boulevard

April 6, Skycrane Tower Lift

April 6, Wire Installation Construction Activities

April 6, Conventional Tower Assembly in the Desert

April 6, Mountain Springs Grade (MSG) Construction MSG micropile drilling (left) and tower staging access pads (right) with barefoot banded gecko exclusionary fencing surrounding the temporary and permanent disturbance areas

April 6, Nighttime Construction at the S-2 Yard

April 6, Sunrise Expected completion date: June 2012

April 6, For More Information on CEQA at the CPUC Public Utilities Code Section 1001 General Orders 131-D, 95-A, 96-B, 159-A, 69-C, 163-A California Code of Regulations Title 14 section et seq.