Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007.

Slides:



Advertisements
Similar presentations
PROJECT STUDY AREA Route Selection. Stage 1 Environmental Assessment Guidelines to underpin the effectiveness of the National Roads Project Management.
Advertisements

Managing the Health and Safety of Contractors
A Joint Code of Practice Objectives and Summary Presentation
Options appraisal, the business case & procurement
THE HOUNSLOW EXPERIENCE: A CASE STUDY Mark Steward MAX Associates 28 th April 2009.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Mikko AJ Ramstedt Senior Project Adviser Financial Partnerships Unit
[Organisation’s Title] Environmental Management System
PaceSetter in HMRC Competitive Dialogue Procurement Invitation to Participate in Dialogue Supplier Outline Solution Template NB: This is intended only.
CIC Scope of Services Frances Paterson & Tony Broomhead.
Environmental Project Commitments The Alberta Experience
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Mag. Martin Oder, LL.M. OECD/SIGMA Concessions and Public.
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
<<Date>><<SDLC Phase>>
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
Specification Writing Presentation Training & Development.
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
Risk Assessment – An Essential Standard
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Project Management. Managing Capital Projects  What is a Project?  Something that: has a beginning and an end, and is carried out to meet established.
Demystifying the Process: Influencing Social and Economic Decision Making In Oil and Gas Development Pandora Snethkamp, Ph.D Houston, TX 77006
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
Environmental Impact Assessment (EIA): Overview
Social Value – a Norfolk commissioning perspective Mick Sanders Head of Integrated Commissioning Norfolk CC and Norwich CCG.
1 Approved Contractors Scheme? George Dunlop FCIOB Friday 16 th November Douglas. Worldwide Construction Consulting.
Managing Risks During Tendering and Contract Procurement Tanya Jackson, Principal Consultant.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
Bridging the gap between EIA and procurement + EIA and then what? – Client and contractor responses to environmental requirements Charlotta Faith-Ell,
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Creating the global research village EU Procurement Nicola Anson, DANTE TF-MSP Meeting, 1 March 2011.
Trunk Road and Motorway Tourist Signposting Policy and Guidance The New Trunk Road Policy BARRY ASPINALL TRANSPORT SCOTLAND.
UNEP Training Resource Manual Topic 10 Slide 1. UNEP Training Resource Manual Topic 10 Slide 2 EIA is a process to: F gather information necessary for.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy United Kingdom.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
Date Create your footer by changing copy in the Header and Footer section1 Network Rail’s Strategic Agenda Calvin Lloyd.
1 - DG ENV Brussels, 5 March 2003 Draft INSPIRE Legislative proposal The key issues 9th INSPIRE Expert Group Meeting Brussels.
A96 Fochabers Bypass Moray Council 15 August 2007.
The Scottish Ferries Review Consultation Document 2010 Arran - 12 July 2010 Graham Laidlaw.
Project Procurement Management
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Compensation Integrated into Infrastructure Planning and EIA in Finland Case: Europe E18 Motorway Turku-Vaalimaa Tiina Kähö Finnish Consulting Engineers.
12.1 Plan Procurement: Introduction
Presentation to the Joint Oireachtas Committee on Transport Assessment, Approval, Public Sector Benchmark and Procurement of PPPs 23rd September 2003.
Early public participation In Decision-Making Process Nana Aghlemashvili Chief Specialist of the Legal Department.
Community-Based Coastal Adaptation Planning Presenter Name Date.
Jacobs Aston Conference 2009 The vital role of local government and PPP capital programmes Chris Wilson Executive Director 4ps 30 th April 2009.
March 8, 2016 Presentation of Item CCW – Solid Waste Management Infrastructure Projects – Final Siting Report.
Better Commissioning Better Services Better Outcomes - The Leeds Approach.
The Scottish Ferries Review Consultation Document Gourock 23 August 2010 Judith Ainsley.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
Municipal Class Environmental Assessment
Minimum Set of Requirements for Suppliers
Module 4 Green Materials Procurement: Finding what you need and getting what you asked for.
Minimum Set of Requirements for Suppliers
SUPPLY CHAIN COLLABORATION A Practical Example
Improving Community Safety through procurement practice and process Tim Oakley Head of Consultancy Trusted procurement for better buildings and homes.
Sustainable Procurement Duty
Transport Scotland Update
Pre-contract Planning and Practice
Resource Efficient Scotland
LEAN DECISION MAKING CHOOSING BY ADVANTAGES PhD Randi Christensen, Head of Lean, Value Management and Innovation, Lower Thames Crossing, COWI.
GG104 Requirements for Safety Risk Assessment Overview
Environmental Commitments
Procurement Reform Bill & New EU Procurement Directives
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Outputs Estimated Tendering Process Timeline (16 – 31 weeks)
Presentation transcript:

Scottish Experience in Procurement and EIA of Roads EIA and Early Market Involvement IAIA 2007

Purpose of Presentation How does the procurement of trunk roads affect EIA in Scotland?

Outline planning and design process design & construction process EIA issues & examples way forward

Transport Scotland’s responsibilities Trunk Road Network planning construction operation design maintenance

Stage 2 Stage 3 Stage 1 corridors routes preferred route PLANNING PROCESS (DMRB) publish draft Orders & Environmental Statement identify problem identify potential solutions compare options scoping simple EIA detailed EIA

EIA requirements required by legislation and procedure key issues: –EIA throughout planning and design –legislative requirement at consent stage

Procurement methods Design and Build Design, Build, Finance and Operate value for money encourage innovation transfer of risk avoid prescriptive design output specifications contractual-based

Consent Procedures Consent Procedures Specimen Design & Contract Documents Specimen Design & Contract Documents Design & Construction Design & Construction Public Local Inquiry Public Local Inquiry Tender Process D& B process Outline Design Outline Design consultation negotiation

Issues for EIA: planning & design commitment to level of detail: –avoid prescriptive design –scheme assumptions in ES: illustrative –definition of mitigation in ES: inputs vs outcomes ES: contract implications strategic

Issues for EIA: design & construction design changes –is the ES still valid? –need to re-consult? –mitigation: implementing commitments do environmental controls work? –Employer’s Requirements –environmental commitments –consultation requirements –Environmental Management Systems

Environmental Performance Requirements noise levels can be specified and outcomes measured output specification for planting –60% to reach not less than 1.5 metre after Year 3 –issue: only 60% planted

Badger Tunnel Environmental controls: –specification for badger fencing –employment of badger specialist –Environmental Management System issue: entrances not best placed for tunnel use rectified

Badger Fencing ES identified badger presence mitigation principles identified "consult and comply“ with environmental bodies third-party responsibility issues: - practicality - value for money

Solutions planning and design: –strategic approach to EIA design & construction: –learn from experience –raise awareness (client, contractor, third parties) –experiment with contract models landscape planting specification (measure & value)