September 2015 1 Elements of success behind CASA-1000.

Slides:



Advertisements
Similar presentations
Western Balkan Technology Fund (WBTF) Initiative
Advertisements

European Investment Bank
Issues and counter-measures related to the status of the power supply in SAARC countries March 6, 2013 Professor Shigeru Sudo Department of Business Management.
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
A case of Armenia: Legal framework for E-procurement in Public Procurement Sector Mr Karen Brutyan, PhD, PFM and PP EBRD Consultant, Wolf Theiss 1-2 December.
ARTF Financing Strategy SY1389 – SY1391 Ministry of Finance, Islamic Republic of Afghanistan ARTF Donor Meeting, London 29 January, 2010.
Energy – Water Nexus in Central Asia IJsbrand H. de Jong Lead Water Resources Specialist World Bank, Almaty.
CEFTA 2006 Improving Regional Trade in South Eastern Europe USAID: RCI Annual Forum Bucharest 1 November.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
CARBON CONTRACTS - the PCF experience September 30, 2002.
GLOBAL LESSONS: DESIGNING CDD OPERATIONS Samantha de Silva HDNSP April 2005.
МЕЖДУНАРОДНАЯ ИСЛАМСКАЯ КОРПОРАЦИЯ ТОРГОВОГО ФИНАНСИРОВАНИЯ JUNE 15, 2015 KAZAN, RUSSIA.
Slide 1 Sudan Private Sector Forum A Forum to support Sudanese Public – Private Sector Dialogue Prepared by Amin Sid Ahmed- World Bank, PSD Advisor Presented.
System of Environmental-Economic Accounting SEEA Implementation Guide and Diagnostic Tool Alessandra Alfieri UNSD.
Dushanbe May 20, 2013 Progress Update and Planning for Next Steps.
PARIS21 - Meeting of Statistical Capacity Development Donors 27–29 April 2011, Paris, France Pietro Gennari, Statistics Division FAO Developing the Implementation.
GAFSP in the Kyrgyz Republic The Union of Water Users Associations of Kyrgyzstan Bali, May 2014.
Audit of Public Procurement
INITIATIVES IMPLEMENTED ON NATIONAL AND INTERNATIONAL LEVELS FOR ENERGY EFFICIENCY AND ENERGY- SAVING IMPROVEMENT VI Eurasian Energy Forum 4-6 October.
ADB’s Role in Bridging Asia and Europe Olly Norojono Country Director, Azerbaijan Resident Mission Asian Development Bank 7 th Euro-Asian Road Transport.
Trade Facilitation: A Regional Perspective Regional Policy Forum on Trade Facilitation in Times of Crisis May 2009, Beijing, China.
European Economic and Social Committee EUROPEAN INDUSTRY AND MONETARY POLICY The role of the European Investment Bank MAIN PROVISIONAL CONCLUSIONS (To.
SARI/Energy Integration South Asia Regional Initiatives for Energy Integration (SARI/EI) Shanker Khagi USAID/Nepal March 7, 2013 Kathmandu, Nepal Supporting.
The Global Fund- structure, function and evolution February 18, 2008.
James Aiello PricewaterhouseCoopers Africa Utility Week 06 International Good Practice in Procurement.
GEF Pacific Workshop Port Moresby, February 2010 Erik Johnson Senior Operations Officer Sustainable Development Network World Bank, Papua New Guinea.
1 Europe and CIS Jacek Cukrowski Economic Development and Poverty Reduction Advisor, UNDP, Europe and the CIS Bratislava Regional Centre Aid for Trade.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
Water Services Trust Fund Financial Support for Improved Access to Water and Sanitation Implementation of UPC Projects 1.
EBRD Technical Cooperation Programme Caroline Clarkson Official Co-financing Unit, EBRD Bratislava, 4 March 2010.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Workshop on “Country Partnership Models with Central Asia” Ministry of Economy and Antimonopoly Policy of the Kyrgyz Republic.
Regional Connectivity: Connecting Gwadar Port to Central Asia Embassy of Pakistan, Kabul September 4, 2015.
Uranium Mining and Remediation Exchange Group, UMREG2012 Vienna 7 – 8 November 2012, DEVCO Nuclear Safety 1 EU - Instrument for Nuclear Safety Cooperation.
Project Appraisal: Overview March 28, Country Level Rapid Assessments: Key Areas A. Status of Plans and Activities Current status of AI in the country.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
DEVELOPMENT CHALLENGES AND TECHNICAL COOPERATION ACTIVITIES IN CENTRAL ASIA WORKSHOP ON COUNTRY PARTNERSHIP MODELS WITH CENTRAL ASIA February 2012,
STEPS FOR FUNDING ELI-NP March 11 st 2011 Dan Cutoiu.
Nikolai Kravtsov Public Foundation «Youstin» (Consumer Association) Washington, USA April, 2010 ELECTRICITY GOVERNANCE INITIATIVE AND REGIONAL ELECTRICITY.
Grant Agreement Documents (between Global Fund and Principal Recipient) Workshop for TB Experts Hosted by WHO Stop TB and the Global Fund December 2005.
Ghana Commercial Agriculture Project: Model Lease Consultancy World Bank Land and Poverty Conference March 2015.
13 February 2013, Bishkek Honma Masaru Director for Central Asia, EBRD © European Bank for Reconstruction and Development 2010 | EBRD’s Activities.
USAID Support for Trade and Private Sector Development in Afghanistan and the Region Donald “Larry” Sampler Assistant Administrator USAID Office of Afghanistan.
Power Trading By P.S.Bami President – India Energy Forum & Former Chairman & Managing Director, NTPC 1.
Stakeholder Coordination in Implementing a Single Window EDICOM 2012 Conference 22 November 2012 Tehran, Islamic Republic of Iran Sangwon Lim Trade Facilitation.
Implementing financial instruments in Slovakia Programming period Martin Polónyi Head of Department for Financial Strategy of Economic Growth.
INTER-AMERICAN DEVELOPMENT BANK Business Opportunities IDB Financing in Latin America and The Caribbean May 2016.
Trade Facilitation & Regional Integration Asia Pacific Perspectives Expert Meeting on Trade Facilitation as an Engine for Development September.
Here Renewable Energy Independent Power Producer Programme Bidder’s Conference 16 August 2012 Andrew Etzinger Senior General Manager Eskom.
“Access to electricity is … the connection that’s needed to plug Africa into the grid of the global economy. In partnership with African nations [and the.
Pakistan Trade and Investment Policy Program (PTIPP) Islamabad Post 22 April 2016.
Real Time Gross Settlement and Regional Banking Integration Tim Masela, Assistant General Manager: National Payment System Department, South African Reserve.
Energy Efficiency in Public and Private Sector Serbia and Western Balkans Belgrade, 15 December 2015.
Mapping Project Design Cycles – How to coordinate IFAD and ADB Processes ADB-IFAD Annual Retreat 5-6 December 2012, Manila.
1 2 nd Danube Financing Dialogue Financing Instruments to support SMEs Belgrade, 24 January 2013 Andreas Beikos Head of Office European Investment Bank.
THE 6 TH PROGRAM EXECUTIVE COMMITTEE MEETING PROGRESS REVIEW AND WORK PLAN FOR: TDF-2, JSDF, AND EIF By Mr. Sengphanomchone Inthasane, Director, Foreign.
Damitha Kumarasinghe Director General
Integrated Planning System
Integrating data, modeling and tools into Basin Planning
Project Preparation Committee Project Financing Workshops
2nd Annual Mason Energy Symposium: Energy-Water Nexus
Choice of Project Structure
CASA-1000 TAP Afghanistan’s Energy Connectivity ,Central to South Asia
این دوره شامل: تعریف مذاکره کلمات کلیدی ورودی ها انواع مذاکره
Aleksandar Nikcevic, Principal Banker
European Economic and Social Committee
Central Ohio Intelligent Transportation System (ITS) Committee
Moving Forward PFM reforms
ACE II Project: Procurement Arrangement and Implementation
Presentation transcript:

September Elements of success behind CASA-1000

2 Objective: Facilitate sustainable electricity trade of 1300 MW between the Central Asian countries of Tajikistan and the Kyrgyz Republic and the South Asian countries of Afghanistan and Pakistan Main Project Components: km of 500 kV transmission lines - 3 Convertor Stations - Technical Assistance and Project Implementation Support - Community Support Programs Cost: About US$1.2 billion Briefly about CASA

Current Status  Commercial Deal  Negotiations on main commercial agreements and prices are completed. The Master Agreement and four Power Purchase Agreements, the core of the project were signed between all the parties on April 24,  Procurement  Procurement of key packages under process at varying stages, namely, HVDC converter stations; Afghanistan HVDC line packages (longest of the line segment); and Owner’s Engineers for HVAC and HVDC systems.  Procurement for the remaining components would follow these.  Financing  More than 90 % financing approved (WB, USG, ARTF, EIB, DFID, IsDB, EBRD). Remaining expected to be filled soon.  The Financing Agreements have been signed between the World Bank and all four countries. Preparation for signing of Financing Agreements between the countries and other IFIs is in progress 3

Some of the remaining key actions 4  Signing of the PPA between Afghanistan and Pakistan  Finalization of alternative transmission line route by Afghanistan for the Salang section of the originally planned route.  Signing of Coordination Agreement between entities designated by governments of the Kyrgyz Republic and Tajikistan; and  Signing of agreement between each Government and its designated entities (Host Government Agreements)

Elements of Success 5  A successful institutional and governance mechanism  Strong ownership for the project  An exemplary patience, collaboration and hard work  Innovative design of commercial framework that lays the foundation for common cost and risk sharing principles  A community support program during construction  Unique internal arrangement for the World Bank teams to work seamlessly across two regions  And a solid foundation laid for development of bigger regional projects

6 Thank You. Questions?