NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.

Slides:



Advertisements
Similar presentations
NOTE: REFERENCE PROJECT MANUAL DATED 1/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
Advertisements

NOTE: REFERENCE PROJECT MANUAL DATED 1/4/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO. REVISIONS Construction.
PHOTO. NO.DATE: 01/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P CHURCH STREET OLIN.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
WESLEYAN P BID PACKAGE #19
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P LAWN AVENUE VINYL SIDING,
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). SKETCH NO. REVISIONS Construction.
PHOTO. NO.DATE: 06/11/13 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P MAJOR MAINTENANCE FY 14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
THE SCOPE OF THIS PROJECT IS LIMITED TO THE FRONT AND REAR PORCHES AND IS DEFINED AS FOLLOWS: FRONT PORCH REMOVE EXISTING PORCH RAILINGS, STAIR RAILINGS,
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P AB HOME AVENUE INTERIOR.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/20/14.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P / 169 HIGH STREET VINYL.
9.02 Exterior Maintenance and Cleaning. Roof, Gutters, Downspouts Check roof for leaves and twigs as they contribute excess moisture that can cause rot.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Exterior Maintenance and Cleaning
WESLEYAN P JUDD HALL STAIRWELL LIGHTING REPLACEMENT PROJECT
WESLEYAN P-3-1 MAJOR MAINTENANCE FY PINE STREET
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
FIRE ALARM / FIRE SPRINKLER SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-19-1 MAJOR MAINTENANCE FY BRAINERD AVENUE
WESLEYAN P-4-8 MAJOR MAINTENANCE FY WASHINGTON STREET
WESLEYAN P C CAPITAL FY 15 OLIN LIBRARY
WESLEYAN P-32-2 MAINTAIN JUT OUT AND PAINT TO MATCH SIDING
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
LONG LANE GROUNDS GARAGE SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-42-1 WEST ELEVATION MAJOR MAINTENANCE FY HOME AVENUE
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P MAJOR MAINTENANCE FY 14 Foss Hill 1-7
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Interior/Exterior Renovation SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-41-1 MAJOR MAINTENANCE FY AB HOME AVENUE
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-28-1 MAJOR MAINTENANCE FY WASHINGTON STREET
Repair roof rafters / joists, soffit and fascia boards in this area.
SECTION EXISTING CONDITION PHOTOS
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-3-1 MAJOR MAINTENANCE FY 15 FOSS 1 – 18 FOSS HILL DRIVE
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-23-1 MAJOR MAINTENANCE FY 16 63AB HOME AVENUE
WESLEYAN P-22-1 MAJOR MAINTENANCE FY 16 23A VINE STREET
WESLEYAN P-FAFS-1 MAJOR MAINTENANCE FY WASHINGTON STREET
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
WESLEYAN P-40-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-38-1 MAJOR MAINTENANCE FY HOME AVENUE
WESLEYAN P-18-1 MAJOR MAINTENANCE FY COURT STREET
Presentation transcript:

NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P HOME AVENUE VINYL SIDING, EXTERIOR PAINT, CARPENTRY REPAIRS, CONCRETE REPAIR SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16

NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P HOME AVENUE VINYL SIDING, EXTERIOR PAINT, CARPENTRY REPAIRS, CONCRETE REPAIR SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16

NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P HOME AVENUE VINYL SIDING, EXTERIOR PAINT, CARPENTRY REPAIRS, CONCRETE REPAIR SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16 PREP AND PAINT ALL WOOD TRANSOMS AND FAN LIGHTS ABOVE WINDOWS. REMOVE STORM WINDOWS AS REQUIRED AND REINSTALL. COLOR: WHITE. PROVIDE CERTAINTEED BEADED TRIPLE 2" INVISIBLY VENTED VINYL SOFFITS AT GABLES ON HOUSE. PROVIDE ADDITIONAL BLOCKING AS REQUIRED FOR PROPER ANCHORAGE. WRAP WOOD BLOCKS. COLOR: WHITE.

NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P HOME AVENUE VINYL SIDING, EXTERIOR PAINT, CARPENTRY REPAIRS, CONCRETE REPAIR SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16

NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P HOME AVENUE VINYL SIDING, EXTERIOR PAINT, CARPENTRY REPAIRS, CONCRETE REPAIR SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16 INSTALL VINYL SIDING TO UPPER SECTION OF HOUSE. INSTALL VINYL BEAD BOARD ON ALL PORCH CEILINGS. PREP AND PAINT ALL WOOD COLUMS, DOOR SIDELIGHTS, EXPOSED WOOD ROOF TRUSSES. COLOR: WHITE. PREP AND PAINT ALL EXTERIORDOORS. COLOR TO MATCH BM COTTAGE RED.

NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y P HOME AVENUE VINYL SIDING, EXTERIOR PAINT, CARPENTRY REPAIRS, CONCRETE REPAIR SECTION EXISTING CONDITION PHOTOS MAJOR MAINTENANCE FY 16 PREP, REPAIR AND PARGE EXISTING CONCRETE DECK AND STAIRS. SOUND OUT ALL SURFACES AND CHIP OUT ANY DAMAGED, SPALLED, CRACKED OR DETERIORATED SECTIONS OR AREAS OF CONCRETE DOWN TO A SOLID SUBSTRATE. TREAT ANY EXPOSED, RUSTED REBAR WITH A BONDING AND ANTI-CORROSION AGENT PRIOR TO INSTALLING CONCRETE REPAIR MATERIAL. ALL RUST MUST BE REMOVED FROM EXISTING REBAR PRIOR TO APPLYING BONDING AGENT PER MANUFACTURER’S REQUIREMENTS. SILPRO C-21 ALL ACRYLIC BONDING AGENT / PRIMER, SILPRO EASY PATCH, SILPRO FASTCRETE. CURE PER MANUFACTURER’S DIRECTIONS. INSTALL NEW METAL HAND RAIL CORED INTO CONRETE. GROUT PERIMETER OF CORE, CONVEX, TO SHED WATER.PAINT HANDRAIL.