US Army Corps of Engineers BUILDING STRONG ® CORPS OF ENGINEERS 2011-2012 NAVIGATION PROGRAM David Martinson Alaska District Corps of Engineers Elmendorf.

Slides:



Advertisements
Similar presentations
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
Advertisements

US Army Corps of Engineers Philadelphia District Scheduled FY 07 Dredging Work FY 07 Dredging Workin Philadelphia District Philadelphia District.
US Army Corps of Engineers BUILDING STRONG ® PNWA Conference Update COLONEL Jose Aguilar District Commander Portland District 2 October, 2014.
US Army Corps of Engineers Portland District Fiscal Year 2007 NWP Dredging Plan Including: The Columbia River Channel Improvement Project (CRCI)
Louisiana Coastal Erosion. The problem LA contains approximately 40% of the nation's wetlands and experiences 80% of the nation's coastal wetland loss.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia River Channel Port Sutton Channel TAMPA HARBOR CONSTRUCTION PROJECTS, Big Bend Channel Alafia.
Atlantic Intracoastal Waterway (AIWW)
Washington Port Issues Washington State Freight Advisory Committee Seattle, WA December 9, 2013.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Civil Works Baltimore District River and Harbor Projects.
Restoring and protecting Louisiana’s coast Barrier Plan June 16, 2010 Kyle Graham Deputy Director of Planning and Programs Office of the Governor – Coastal.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
US Army Corps of Engineers BUILDING STRONG ® Eastern Shore Navigation Partnership Meeting “ A Unified Voice for Navigation, Project Prioritization, and.
U.S. Army Corps of Engineers Savannah Harbor Expansion Project Savannah Harbor Expansion Project.
Mitigation R. Scott Simmons State Hazard Mitigation Officer Division of Homeland Security and Emergency Management Our Partners in Preparedness:
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation 1-Dimensional Modeling CWPPRA Technical Committee and.
Q AVG US Army Corps of Engineers BUILDING STRONG ® Q AVG US Army Corps of Engineers BUILDING STRONG ® USACE Regional Sediment Management Program Linda.
Five Regions of Alaska By: Sierra Donohue.
NAD/SAD REGIONAL DREDGING MEETING/WEDA WILMINGTON DISTRICT
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
US Army Corps of Engineers BUILDING STRONG ® HYDROGRAPHIC SERVICES REVIEW PANEL Stakeholder Panel: Alaska Regional Needs for NOAA’s Navigation Services.
NOAA Navigation Services CO-OPS Update Richard Edwing National Ocean Service Center for Operational Oceanographic Products and Services Hydrographic Services.
Savannah Harbor Expansion Project
San Francisco District San Francisco District Coastal Activities Frank Wu CERB Meeting June 4, 2009.
October FY08-FY12 Dredging Schedule New York District 1st Qtr FY08 2nd Qtr 3rd Qtr 4th Qtr 1st Qtr 2nd Qtr 3rd Qtr 4th Qtr FY09FY10 1st Qtr 2nd.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
US Army Corps of Engineers BUILDING STRONG ® Mouth of the Columbia River (MCR) Jetties Laura Hicks Chief, Planning and Project Management Branch Pacific.
Plan Formulation for Deep Draft Harbors Navigation Measures.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Presentation for 2012 WEDA Midwest.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Regional Resource / Global Gateway Colin Parker, Chief Executive | 27 August 2008.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
1 RSM through CAP Sec 204/ Implementation issues and opportunities Lynn Martin Institute for Water Resources, USACE
BUILDING STRONG SM Partnering and Coordination to Accomplish the Navigation Mission.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
Coastal Brownfields: At the Water’s Edge Panel: Waterfront Revitalization and Marine Transportation.
Building Strong! May Deep Draft Navigation Module 2011 Planning Associates Class Jeremy LaDart Office of Water Project Review HQUSACE Mission Overview.
PRESENTATION & DISCUSSION Dave Bergen Southold Town Trustee July 18, 2015.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
BUILDING STRONG ® Mississippi River Ship Channel Gulf to Baton Rouge, LA Propeller Club for Port of New Orleans 24 September 2015.
BARRIER ISLANDS TEXAS GULF COAST.
Harbor Maintenance and Dredging: A Legislative Update CAPT Bill Diehl, USCG (Ret.), P.E. President Greater Houston Port Bureau.
US Army Corps of Engineers BUILDING STRONG ® Toke Point Marina Pipeline Maintenance Dredging with Flowlane Disposal at Willapa Harbor, Washington Hiram.
San Francisco Ocean Beach-Great Highway Erosion Control Project.
SEPOCTNOVDECJANFEBMARAPRMAYJUNJULAUGSEPOCT FY07FY06FY08 Page 1 of 3 FY07 Dredging Schedule New York District Mechanical Dredge Maintenance Dredging Newark.
1 Coal Handling & Storage Conference 2015 Paul Rohde, Vice President Waterways Council, Inc.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
US Army Corps of Engineers ® Engineer Research and Development Center West Bay Diversion Evaluation Integration of Results 6 Month Progress ERDC West Bay.
US Army Corps of Engineers BUILDING STRONG ® Mississippi Coastal Improvements Program (MsCIP) “Comprehensive Barrier Island Restoration Plan” PIANC 2012.
Region s of Alaska The Arctic Northernmost Alaska.
Kiara O’Neill. The Five Regions Alaska has five main regions: Southeast Southcentral Southwest Interior Arctic.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
-South East Alaska is also know as the “Alaska Panhandle”. -Southeast Alaska has over a 1,000 islands -It’s part of the Alexander Archipelago -3 of the.
State of Alaska Alaska Housing Finance Corporation Weatherization Program.
Commercial Passenger Vessel Excise Tax Presented by Johanna Bales Deputy Director, Tax Division Alaska Department of Revenue.
US Army Corps of Engineers BUILDING STRONG ® CORPS OF ENGINEERS Alaska District - Partner Projects Julie Anderson, PE Alaska District Corps of Engineers.
Alaska Municipal Bond Bank Alaska Industrial & Export Authority February 15, 2010.
AS DOT&PF is responsible for the planning and construction of public works, expect court facilities. Public Facilities or Public Works include.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Harbor Resources Manager’s Report February 10, 2010.
1 US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers St. Paul District Channels & Harbors Project Pool 2 Channel Management Study.
NEW ENGLAND DISTRICT Operations and Maintenance Projects Maine Dredge Team Meeting October 2015 Ed O’Donnell Chief, Navigation Section.
Joseph T. Kelley Walter A. Anderson
Beneficial Use of Dredged Material
Breaches.
INTRODUCTION TO PORT DESIGN
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® CORPS OF ENGINEERS NAVIGATION PROGRAM David Martinson Alaska District Corps of Engineers Elmendorf AFB, Alaska October 2011 Building and Preserving Alaska’s Future

BUILDING STRONG ® FY11 CIVIL WORKS PROGRAM Number of Civil Works Navigation Projects: 28 Active Projects 12 in Study Phases Recon: Sitka harbor, Kasaan 107, Auke bay 107, Craig Feasibility: Alaska Regional Ports, Anchorage Harbor Deepening, Elim 107, Little Diomede, Savoonga 107, Whittier, Homer, Valdez 4 in Preconstruction Engineering & Design Phase W/agreement: Haines, Sitka WO/agreement: Port Lions, Valdez 5 in Construction Phase Akutan, Douglas, False Pass, Sand Point, Seward, Unalaska 7 O&M activities 6 Dredging: Anchorage, Dillingham, Homer, Ninilchik, Nome, Petersburg, 10 Condition Surveys

BUILDING STRONG ® FY11 CIVIL WORKS PROGRAM FY11 Appropriations Full year Continuing Resolution Act provided funding for: $21,388,000 5 Studies 2 Construction Projects 7 O&M Activities

BUILDING STRONG ® FY11 Program Funding INVESTIGATIONS ($000) Alaska Regional Ports250 Anchorage Harbor Deepening150 Little Diomede Harbor 200 Valdez Harbor 499 Whittier Breakwater 100 CONSTRUCTION Akutan Harbor 7,000 Unalaska Harbor499 4 OPERATIONS & MAINTENANCE($000) Anchorage Harbor 7,120 Dillingham Harbor 840 Homer Harbor 1,001 Ninilchik Harbor 327 Nome Harbor, AK 1,976 Petersburg Harbor494 Project Condition Surveys 959 Total FY11 Federal funding = $21,388,000 (Navigation related projects)

BUILDING STRONG ® FY12 CIVIL WORKS PROGRAM President’s Budget Request Included: 0 Studies 0 Construction Project 6 O&M Navigation Activities Commitee Reports for FY10 Appropriations Bill includes: 0 Studies 0 Construction Projects 6 O&M Navigation Activities

BUILDING STRONG ® FY12 Program Funding FY2012 ProjectProgram President's Budget ($000) House Report ($000) Senate Report ($000) Conferenc e Report ($000) Anchorage HarborOM14,00013,72014,000 Dillingham HarborOM Homer HarborOM Ninilchik HarborOM Nome Harbor, AKOM1,0661,0441,066 Project Condition SurveysOM TOTAL17,42617,07517,426 6

BUILDING STRONG ® CONSTRUCTION Valdez Harbor Feasibility study INVESTIGATIONS CORPS OF ENGINEERS PROGRAMS OPERATIONS AND MAINTENANCE Anchorage Harbor Rock placement in Unalaska

BUILDING STRONG ® Location: Statewide Project Description: This statewide regional ports study will evaluate a system of ports to meet foreseeable development needs, prioritize port development and investment, and identify regional hub functions. This will result in a port and harbor investment strategy and agency participation. ALASKA REGIONAL PORTS, AK FEASIBILITY Anchorage Fairbanks Juneau Nome FY 2011 Activities: Alaska Regional Ports Conference. Reach agreement with partner agencies on prioritization of port and harbor development. Revise study scope. Initiate agreements with partner agencies for water infrastructure studies.

BUILDING STRONG ® PROJECT LOCATION VALDEZ HARBOR, AK FEASIBILITY Location: Valdez is on the north shore of Port Valdez, a deep water fjord in Prince William Sound. It is 305 road miles east of Anchorage, and 364 road miles south of Fairbanks. It is the southern terminus of the Trans-Alaska oil pipeline. Project Description: The feasibility study will investigate the problems, needs, and opportunities for navigation improvement in the Valdez small boat harbor. The demand for moorage space in the harbor far exceeds the existing design capacity of approximately 510 boats and the construction of an additional harbor is desired by local interests. Anchorage Fairbanks Juneau Nome FY 2011 Accomplishments: §Report completed and approved. Initiate Preconstruction Engineering &Design

BUILDING STRONG ® Anchorage Fairbanks Nome Savoonga Navigation Improvements Elim Navigation Improvements Douglas Navigation Improvements Auke Bay Navigation Improvements Juneau SECTION 107 SMALL NAVIGATION STUDIES Kasaan Navigation Improvements

BUILDING STRONG ® AKUTAN HARBOR, AK Location: The city of Akutan is located on the north shore of Akutan Harbor and is uniquely positioned to grand fish and crab fisheries of the Bering Sea. The harbor site is at the head of the bay on Akutan Island 790 miles southwest of Anchorage. Project Description: The proposed harbor will provide a 12 acre protected mooring basin and serve as the operations base for 58 commercial fishing vessels. PROJECT LOCATION Anchorage Fairbanks Juneau Nome FY 2011 Accomplishments: § Continue construction

BUILDING STRONG ® Anchorage Fairbanks Juneau Nome PROJECT LOCATION DOUGLAS HARBOR, AK Location: Douglas Harbor is on the eastern side of Douglas Island. The harbor is adjacent to the city of Douglas, approximately 3 miles south of the city of Juneau. Project Description: The recommended plan provides additional protection to the existing harbor and provides year-round protection to 58 new vessels. FY 2011 Accomplishments: § Install Bloating Breakwater §Amend PCA to increase project limits

BUILDING STRONG ® Anchorage Fairbanks Juneau Nome PROJECT LOCATION Location: Unalaska overlooks Iliuliuk Bay and Dutch Harbor on Unalaska Island in the Aleutian Chain. It lies 800 air miles from Anchorage. Project Description: The harbor will provide additional protected moorage for commercial fishing vessels. It will reduce congestion and rafting at existing docks. UNALASKA HARBOR, AK FY 2011 Accomplishments: §Complete Floating Breakwater construction §Place anchor chains

BUILDING STRONG ® OPERATIONS AND MAINTENANCE

BUILDING STRONG ® DISPOSAL SITE MAINTENANCE 2010 & 2011 VIRGIN MATERIAL IN 2009 THRU 2011 Location: Anchorage is located at the northern end of Cook Inlet in south-central Alaska. Project Description: Authorized by the Rivers and Harbors Act, 3 July 1958, and amended by P.L in 2005 to replace the existing dock with a new 10,860 foot long inter-modal marine facility. The port is the largest cargo port in Alaska serving as the main supply and distribution center for the south-central and interior areas as well as the two large military bases within the Municipality of Anchorage. Water Borne Commerce was 3,798,272 tons for year ANCHORAGE HARBOR FY 2011 Accomplishments: § Performed annual maintenance dredging within the existing project limits; expect less than 800,000 CY when complete. § Completed ARRA funded dredging of virgin material in front of the new north extension of the intermodal dock facilities to a -35 ft MLLW elevation. FY 2012 Proposed Activities: § Perform annual maintenance dredging of the historical dredging area with two dredgings of the north extension for the intermodal dock facilities. Proposed Activities beyond 2012: § Continue annual maintenance dredging at the historical dredging area and the new north extension for the intermodal dock facilities. PROJECT LOCATION Anchorage Fairbanks Juneau Nome

BUILDING STRONG ® Anchorage Fairbanks Juneau Nome PROJECT LOCATION Location: Northern end of Nushagak Bay in western Alaska. Project Description: The Rivers and Harbors Act of 1958 provides for a 650 to 800 foot wide X 700 foot long basin utilizing a 1100 foot long entrance channel to Nushagak Bay, the harbor provides half-tide access and all-tide moorage for over 320 commercial fishing vessels. The harbor is also used as an alternate landing area for lighterage vessels. DILLINGHAM HARBOR, AK DISPOSAL SITE PROJECT LIMITS FY 2011 Accomplishments: § Performed annual maintenance dredging removing 74,078 CY of material from the harbor and entrance channel. FY 2012 Proposed Activities: § Perform annual maintenance dredging of approximately 90,000 CY of material. Proposed Activities beyond 2012: § Continue annual maintenance dredging of the project.

BUILDING STRONG ® Anchorage Fairbanks Juneau Nome PROJECT LOCATION Location: Southern end of the Kenai Peninsula in south- central Alaska. Project Description: Authorized by the River and Harbors Acts of 1958 and The 50-acre project provides sheltered moorage for over 1,525 commercial fishing and recreational vessels. The project extends the fishing season an extra four months each year and is an integral part of Homer’s economy. HOMER SMALL BOAT HARBOR, AK PROJECT LIMITS FY 2011 Accomplishments: § Performed maintenance dredging of the harbor and entrance channel in September. Dredged the USCG’s Hickory berth in both April and September. FY 2012 Proposed Activities: § Perform annual maintenance dredging of approximately 8,500 CY of material in the small boat harbor and at the Hickory berth. Proposed Activities beyond 2012: § Continue annual maintenance dredging of the project. HICKORY BERTH

BUILDING STRONG ® Anchorage Fairbanks Juneau Nome Location: Western side of the Kenai Peninsula on the shores of lower Cook Inlet. Project Description: Authorized by the Rivers and Harbors Act of The small basin provides protected moorage with half-tide access for 32 vessels. The basin and channel also provide access for fishing boats to unload their catch and take on supplies. It is also an important harbor of refuge in the lower Cook Inlet region. NINILCHIK HARBOR, AK PROJECT LIMITS DISPOSAL SITE PROJECT LOCATION FY 2011 Accomplishments: § Performed annual maintenance dredging removing 8,842 CY of material from the harbor and entrance channel. FY 2012 Proposed Activities: § Perform annual maintenance dredging of approximately 9,000 CY of material. Proposed Activities beyond 2012: § Continue annual maintenance dredging of the project. PROJECT LIMITS DISPOSAL SITE PROJECT LIMITS

BUILDING STRONG ® Anchorage Fairbanks Juneau Nome PROJECT LOCATION NOME HARBOR, AK Location: Authorized by the Rivers and Harbors Acts of 1917, 1935, 1948 and most recently by the WRDA Nome harbor is located on the southern coast of the Seward Peninsula in western Alaska. The city is approximately 540 miles northwest of Anchorage and is the transportation and commerce center for northwest Alaska. Project Description: The project consists of a 1,070 meter- long entrance channel protected by a 910-meter long rubblemound breakwater and sediment collection basins. FY 2011 Accomplishments: § Performed annual maintenance dredging with material deposited on the beach for beach nourishment. FY 2012 Proposed Activities: § Perform annual maintenance dredging of approximately 30,000 CY of material. Proposed Activities beyond 2012: § Continue annual maintenance dredging of the project.

BUILDING STRONG ® HYDROGRAPHIC CONDITION SURVEYS

BUILDING STRONG ®

Project Location Previous Tide Datum Publication Date Current Tide Datum Publication Date Vertical Change (ft) Bethel Small Boat Hbr 1/22/19711/14/ Dry Pass Channel (2) NAIn Progress-- Ninilchik HarborNAIn Progress-- TIDAL DATUM UPDATES For current up to date information, please go to: id3=949

BUILDING STRONG ® 2011 PROJECT CONDITION SURVEYS PERFORMED PROJECT TIDAL DATUM UPDATE HYDROGRAPHIC SURVEY BW SURVEY BETHEL SBH DRY PASS CHANNEL ELFIN COVE CHL HAINES PELICAN PETERSBURG PORT ALEXANDER CHL ST PAUL (PRIBILOF ISL) SKAGWAY WRANGELL NARROWS For electronic access to surveys go to:

BUILDING STRONG ® 2012 PROJECT CONDITION SURVEYS PLANNED PROJECT TIDAL DATUM UPDATE HYDROGRAPHIC SURVEY BW SURVEY CRAIG HARBOR FALSE PASS KETCHIKAN – BAR PT HBR KETCHIKAN – THOMAS BASIN MEKORYUK BW MOUNTAIN POINT BW OLD HARBOR SITKA – CHNL ROCK BW SERGIUS & WHITSTONE NARROWS For electronic access to surveys go to:

BUILDING STRONG ® BUILDING STRONG QUESTIONS? David Martinson Program Manager, Civil Project Management Branch Alaska District U.S. Army Corps of Engineers Allen Churchill O&M Program Manager, Operations Branch Alaska District U.S. Army Corps of Engineers