UPDATED Notes from the June 22 Conf. Call on Weld Details, Bushing Details, and C-C Bolts.

Slides:



Advertisements
Similar presentations
Adding Gears to the NXT Taskbot
Advertisements

Sectional Assembly and Installation
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Chapter 12 Working Drawing
NCSX Mod Coil C1 features requiring rework at PPPL.
FEA - Stress Levels & Concentration A change in the shape of a component carrying a load will have the effect of increasing the stress, nearly always at.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Click on this image to open the full PDF document.
Weld Geometry A-B Flange:A Possible Alternate to the Extended Shim/ Double Fillet Weld For welds with overlaps – consider the above to make TIG welding.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Feature-Based Modeling and Optional Advanced Modeling
2- Crankshaft, Piston Pin, and Piston Rod Bushing.
Status of VLPC Cryo-Cooler Cryostat Design Russ Rucinski (Alan Bross) Fermilab.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
Coil Cooling Workshop Summary June 10, Electrical Isolation: Cladding is isolated from the T by Kapton. The chill plates electrically connect at.
Tutorial (Basics in SolidWorks) 小明 in ERB106.  Modeling  2D ▪ Sketching ▪ Dimensioning ▪ Mirror/Pattern ▪ Trim/Extend ▪ Fillet/Chamfer  3D ▪ Extruded/
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Types of Threaded Fasteners.  Used to hold parts together  Clearance holes in parts  Nut on other end  Can also be used with a threaded hole.
Weld Study Continued Filet weld on both sides Deflection (top flange removed) Stress Intensity (top flange removed)
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
“Building Quality to Customer Satisfaction!”. TOTAL QUALITY MACHINING, INC.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
2012 IDEA ASSEMBLY “HINT” PACK. ARM: draw in 2D Copy / paste this view into Inventor.
Summary of first round of testing of shim concept for modular coil assembly
Shop Built Magnetic LED Light Bob Clark Aug, 11, 2011.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
Analyses of Bolted Joint for Bolt Preload and Shear Load
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
Shear Test Assembly update
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Working Drawing.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
Update: TF Outer Ring and Clevis Design TF Outer Ring – Implemented recommendations from P. Rogoff. Modified Bolted Joint. Modified weldment to reduce.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Bushing Material The bushings are made of G11CR. However, it has been shown that deflections (and bolt stresses) due to shear loads not reacted by friction.
NCSX SHIM ISSUES NOV Outer shim permeability (316L certified) Machining of the initial lot of shims increased the permeability from 1.02 to
LARP Collaboration Meeting Racetrack Coil Fabrication
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
1 FPA Stage 2 MC Flange Assembly Issues and Design Proposals June 20, 2006 T. Brown.
Pins in Holes Shear Panels Rev 0 Stress Analysis By Leonard Myatt & ORNL Myatt Consulting, Inc.
Building from Templates. The Concept First things first: In the beginning was the idea. For example, “I need a coffee table, something unique but functional.”
NCSX June 29,2007GJG1 Supporting Slides for D. Williamson & K. Freudenberg Modular Coil Outboard Shims Testing.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
GLAST Large Area Telescope:
STEP 1: ASSEMBLE ANGLE PLATES
MACH 112: Cutting Tools & Measurement
Assembly instructions for M-K all bolt together hoppercone kit.
LARP Phase II Secondary Collimator RC-1
Gaskets and Packing An introduction to Gaskets Packing
Fin & Countertop Sample Kit Instructions
SNS PPU Cryomodule Space Frame
Presentation transcript:

UPDATED Notes from the June 22 Conf. Call on Weld Details, Bushing Details, and C-C Bolts

Call agenda: The first two bullets will focus on the results of discussions at MEL with John Edwards and Fred Simmonds who are visiting from PPPL. Weld access, weld locations & length, and weld shims & details. (Fred, Kevin and others) Bushing design. (fabrication methods, tolerances, installation methods) (John, Paul, and others) C-C additional bolts (Mike and Gary: please show your side showing accessibility of the new bolts and a drawing showing locations). Outer shim designs & spec. (Mike, Geoff & Gary) shim details; retention during assembly; sealing of gaps to retain VV insulation; surface roughness specified for Alumina, etc.) Conclusions & action items on all of the above.

Notes on Weld Details The casting flanges will need to be chamfered to give proper access for the TIG gun. –CAUTION: need to make sure that chamfering will leave enough flange for welding in tight areas. –Chamfers can be hand-ground. –Weld is ½” x ½” – chamfer is still needed. (need BN concurrence). Peening looks ok. A-B flange in the “concave” region: Stress is ~15 ksi in some of these regions. More detailed stress analysis is needed to see if this double chamfer weld is really needed. Will try on water jet cut flanges next week. MV will check details with Bob Keilbach. YES - Can we open up the gaps between the shims to ¼” to permit more “wiggle room” for the shims and avoid build-up of tolerances? (this is also an issue for the outboard shims – see slide 6) –Can weld SS strips over the gaps to seal insulation or inject Great Stuff or both. DO THIS WELD ON INBOARD SIDE INSTALL FIBERGLASS PLUG AT BASE THEN INJECT GREAT STUFF. PPPL needs to sketch what is planned for weld test.

Stress Intensity of Weld and shim (units are Psi) Note that most of the weld is yellow: ie, ~13 ksi.

Material: 316 SS FOR ALL SHIMS NOTE: ANNEAL LAST! Need to check if they warp, though. Gaps – ¼” BETWEEN SHIMS Need to change shim profiles to stick out where they need to. Need to add weld prep. to these special shims.

Fillet welds 2 are already tough and there is little room to grow Obviously, we could chamfer and produce a weld as a combo of a reseeded weld and the fillet near the edges and the transition zones but that would be VERY hard to model and transfer to FEA as I would need blending, curves, etc. Extended shim But stress there is moderate – ksi, so this weld size should be ok BUT can’t we model the fillet as a fillet to get accurate stress prediction ??

Bushings John Edwards - Making the bushing is not the time consuming part – it’s getting to there. There is a lot of putting things together and taking things apart. –In locations where studs are pre-fit, the coils would have to be taken apart again. Maybe 4 locations. FIX: don’t use tight fitting bushings there. –Can’t get Supernuts out in some areas. –The casting moves around until it’s locked down. Installing the bushings one at a time is the time consuming part. –Need to tighten the castings down, take a subset of nuts out, measure, install bushings. Option A: get bushings with “standard” ID hole fitted to the stud and then machine the OD to fit. Option B: use filled epoxy to tightly fit the bushings in place. Need to get time and cost down for the bushings. Are the spherical washers retained?

“Super Bolt” Nut 7/16” Washer (Inconel 718) ½” Load Washer (Titanium).030” G-11 Insulator G-11 Bushing ½” Nominal Shim (316-SST) with Alumina Coating 1.375” dia. Stud (316-SST) Modular Coil ISSUE: electrical short potential on OD of load washers! FIX: Machine washer OD’s to provide 0.032” clearance IF NEEDED; paint OD with epoxy at assembly. MV: Machine the bushings to lightly press fit. A lathe will be moved into the assembly area. Studs have tolerances on the shank of +/ ”. Bushing will be made of rolled G10CR with ID sized for a sliding fit. (nom. Clearance of 0.001”). Install bushings in groups of 2-4, spaced around. We have a bushing deal! MV will prototype.

OLD drawing – Spherical washers are out!! Brad will get us R2 of this drawing.

C-C Best way to establish access feasibility is to put a B-C together and then try to mock up reaching into these areas. May require development of semi- remote handling tooling, but we can do it. –Iter? Phil Spampanato? The “hardest to access” 3 are the important ones – if we get these in, the 3 above really could be deleted. This area might require special bushings – fit up before the TF coils & use a special tool to install at final assembly. ORNL may make a wooden or stereo lithography mock-up. Use for top and bottom access studies.

Friction = 0.4 everywhere on flange through alumina shims. ADDED 6 Inboard Bolts Innermost 6 bolts are shown but not used in the calculation (shown as x’s in the sliding picture) Inner most bolts see 2.4 Kips Sliding is 4.7 mils Bolt 1 Bolt 32 Bolt 33 Bolt 38 X X X X X X

Shims Geoff is doing alumina friction life tests at mu=0.4 for 130k cycles and 10 kpsi and 77K ~ TUESDAY 6/26 note: we only need ~ a max of 0.22 mu now, so even bare steel would be good enough. The question is if the alumina will break up and act as a lubricant. PPPL suggests deleting small retention bolts for shims – will use tabs and/or studs to insert them during assembly on C-C and A-A (ie, vertical assembly) not an issue on the others. ORNL is proposing holes in ALL so we have a universal shim set. –ORNL also wants these to hold “dust cover” aerogel in place. PPPL says use Great Stuff. –ORNL says these need to be retained because re- analysis would be necessary to qualify the revised design. MV: definitely don’t need for A-A Need a feature on the inboard ones – not the others. MV: ACCEPTED - A possible compromise: use one side coated (OR OTHER RETENTION METHOD) DISCUSS NEXT WEEK WITH MIKE C. Question: when are they ground to proper thickness? Before or after coating? Alternative – have a set of various thicknesses to fit in place. Second alternative: fit standard shims in place, then grind off edge to permit tack welding. Agreed –delete holes & retaining studs.

Shims (cont’d.) Shim trimming tests being performed at PPPL tomorrow. Gaps between shims – WILL BE ¼” AND FILLED WITH AEROGEL (WITH FIBERGLAS BOTTOM PLUG). Next week when PPPL performs weld tests on the water jet flange, we’ll also perform Great Stuff sealing tests and do LN2 dunk tests to demonstrate adhesion to SS. USE RELAXED TOLERANCES ON PROFILE!!! GROOVES SHOWN REPRESENT THE 2 CUT LENGTHS REQUIRED FOR ALL COIL INSTALLATIONS “CUT OFF” TAB AND UNIVERSAL SHIM DESIGN ACCEPTED. GEOFF WILL WORK GROOVE DETAILS WITH A&A AND GET BACK TO MIKE C. GROOVE WILL BE ACROSS TOP AND BOTTOM SURFACES ONLY (IE, NO SIDE NOTCHES AS SHOWN ABOVE) KEVIN WILL USE THIS SHIM TYPE FOR HIS TESTS Make id Make non- stepped side profiles. Break all edges cheaply.

HOLE 1 HOLE 5 HOLE 10 HOLE 15 HOLE 20 HOLE 25 ISSUE: THESE GAPS WILL BE FILLED IN WITH NO HOLE SHIMS HELD IN PLACE BY WELDING (LD WORKING DETAILS).