1 4 th Integrated Seminar 4.5.2005. 2 Determining the Tower Capability  Characteristic Curve Method It can be performed using the Demand Curve tab, along.

Slides:



Advertisements
Similar presentations
HUMIDIFICATION/COOLING TOWER
Advertisements

How to read the Humidity chart & do the operating diagram for Cooling tower of Air-Water at 1 atm. Assume you have air of a definite air- water mixture.
Solving LP Problems in a Spreadsheet
Example 2.2 Estimating the Relationship between Price and Demand.
Welcome to a tour of Limb Volumes Professional 6.0 LVP6.0 is the latest version of the world famous and widely used lymphedema tracking and reporting software.
Example 16.1 Forecasting Sales at Best Chips. Thomson/South-Western 2007 © South-Western/Cengage Learning © 2009Practical Management Science, Revised.
ELECTRONIC SPREADSHEATS ELECTRONIC SPREADSHEATS Chapter 14_Part2 Dr. Bahaa Al-Sheikh & Eng. Mohammed AlSumady Intoduction to Engineering BME152.
1 3 rd Integrated Seminar Cooling Tower Internals  Water pass through a nozzle  Air-water interface is heat transfer surface  Free-fall.
Click here to enter. Click a menu option to view more details Starters Main Courses Desserts Click on the coffee cup to return when Navigating For Vocabulary.
This tutorial is a PowerPoint ® file which includes recorded narration. Automatic slide sequencing is coupled to the sound track. For the most effective.
Observe Brownian motion of particles.
By Hrishikesh Gadre Session II Department of Mechanical Engineering Louisiana State University Engineering Equation Solver Tutorials.
Jordanian-German Winter Academy 2006 NATURAL CONVECTION Prepared by : FAHED ABU-DHAIM Ph.D student UNIVERSITY OF JORDAN MECHANICAL ENGINEERING DEPARTMENT.
Correlations for INTERNAL CONVECTION P M V Subbarao Associate Professor Mechanical Engineering Department IIT Delhi An Essential Part of Exchanging Heat……..
Computation of FREE CONVECTION P M V Subbarao Associate Professor Mechanical Engineering Department IIT Delhi Quantification of Free …….
SPSS Statistical Package for the Social Sciences is a statistical analysis and data management software package. SPSS can take data from almost any type.
Temperature 1.  Temperature is defined as the degree of hotness or coldness of a body measured on a definite scale  Temperature is the driving force.
Thermal Analysis and Design of Cooling Towers
Design Analysis of Plate Heat Exchangers
1 Doing Statistics for Business Doing Statistics for Business Data, Inference, and Decision Making Marilyn K. Pelosi Theresa M. Sandifer Chapter 11 Regression.
Volume Activity The Relationship between Centimeters Cubed and Milliliters.
Asian Institute of Technology
Computer lab: problems 2.11 and 2.12 tom.h.wilson Department of Geology and Geography West Virginia University Morgantown, WV.
Water piping design.
Spreadsheets and Microsoft Excel. Introduction n A spreadsheet (called a worksheet in Excel) is a two-dimensional array of cells containing data to be.
DESIGN AND CONSTRUCTION OF AN
Data Presentation & Graphing Introduction to Mechanical Engineering The University of Texas-Pan American College of Science and Engineering.
Statistics for the Social Sciences Psychology 340 Spring 2009 Review of SPSS basics.
ENERGY EFFICIENCY TECHNOLOGIES AND ENERGY SAVINGS POTENTIALS FOR COLD ROOMS.
Saturation = filled to capacity
高等輸送二 — 熱傳 Lecture 11 Simultaneous Heat and Mass Transfer
Language Objective: Students will be able to practice agreeing and disagreeing with partner or small group, interpret and discuss illustrations, identify.
Lecture Objectives: Summarize sorption chillers Learn about Chiller modeling Cooling towers and modeling.
ELECTRONIC SPREADSHEATS ELECTRONIC SPREADSHEATS Chapter 14 Dr. Bahaa Al-Sheikh & Eng. Mohammed AlSumady Intoduction to Engineering BME152.
Lecture Outline Chapter 12 College Physics, 7 th Edition Wilson / Buffa / Lou © 2010 Pearson Education, Inc.
1 st Integrated Seminar DESIGN AND CONSTRUCTION OF AN INDUCTION FURNACE (COOLING SYSTEM) Presented by MG THANT ZIN WIN Roll No: Ph.D-M-7 Supervisors.
H. SAIBI December 10 th, A pilot, a hot air balloonist, and a scuba diver must all have a good working understanding of air and water temperatures.
SPECIALIST MATHS Differential Equations Week 1. Differential Equations The solution to a differential equations is a function that obeys it. Types of.
PRESENTATION OF CFD ACTIVITIES IN CV GROUP Daniel Gasser.
DAY 9: MICROSOFT EXCEL – CHAPTER 6 Sravanthi Lakkimsetty Sept 16, 2015.
Lecture Objectives: Cooling towers and modeling Project 1 Thermal storage systems.
Notes Over 7.6 Solving a Simple Radical Equation Solve the equation. Check your solution.
Use SPSS for solving the problems Lecture#21. Opening SPSS The default window will have the data editor There are two sheets in the window: 1. Data view2.
Objectives Learn about Fans Discuss: Exam (I will have an extra office hour on Monday at 8:00 am) Final Project (I need your group member lists till tomorrow).
 Observation  Formulate a Hypothesis  Set Up a Controlled Experiment  Organize and Analyzing Data  Drawing Conclusions  Repeating Experiments /
1 NUMERICAL METHOD. 2 Introduction Definition : The study of approximation techniques for solving mathematical problems, taking into account the extent.
Course Exam Next Thursday (April 15) 7 pm Same classroom (ECJ 7.208) 2.5-hour exam Open book open notes All problem types of questions (short but comprehensive)
Combustion Control based on Flame Ionization Application in Condensing Heating Appliances by: Martin Kiefer 07 June 2012 Venue: EF5.B: WOC5 Gas Quality.
To apply the principles of humidification and evaporative cooling in the shell-and-tube heat exchanger-cooling tower network in the laboratory. To study.
 Also known as scrubbing  A unit operation that involves the diffusion of the solute from the gas phase through a stagnant liquid  There is a mass.
PUMPS Thermal Systems Laboratory Samuel A. Santiago Pérez Modesto González David Alvarado.
Lecture Objectives: Learn about Plumbing System Modeling
Factors Affecting Solution Formation
Lecture Objectives: Discuss HW4, answer your questions
To find the solution of simultaneous equations graphically: 1)
BUSINESS MATHEMATICS & STATISTICS.
Lecture 10 Thermodynamics of humid air; Part two
Lecture Objectives: Discuss Project 1 assignment
Lecture Objectives: Continue with cooling towers
EXPONENTIAL FUNCTIONS
Lecture Objectives: Discuss HW4 Chiller modeling
PTT 253/3 (RY01/RY20) HEAT TRANSFER
When: Monday 26, 4 pm Where: ECJ Building, Classroom 3.402
Section 11.3 Euler’s Method
Overview of processes Module 8.
Lecture Objectives: Cooling towers and modeling Project 1.
Review How do you bring in your data? How do you plot your data?
CHAPTER Five: Collection & Analysis of Rate Data
Welcome to a tour of Limb Volumes Professional 6.0
Solving Systems of Equations by Elimination Part 2
Presentation transcript:

1 4 th Integrated Seminar

2 Determining the Tower Capability  Characteristic Curve Method It can be performed using the Demand Curve tab, along with appropriate data supplied by the manufacturer and field test data.  Performance Curve Method It can be performed using the Mechanical Draft Performance Curve tab, along with a set of performance curves supplied by the tower manufacturer or rebuilder and field test data.

3 Cooling Tower Demand Curves  It is the numerical solution of the Merkel integral over the wide range of L/G values.  Use in designing cooling towers.  Apply for analysis of test data.  Evaluate for the prediction of cooling tower performance.  Plot with the thermal demand, KaV/L, and L/G.  Contain the values of KaV/L, cooling ranges and approaches

4 Limitations on use of Demand Curve Actual tower performance may deviate from predicted at water loading and air velocities. The followings affect it. a)At very low water loadings b)At very high water loadings c)At very high air velocities d)Changing the airflow due to air-side resistance

5 Cooling Tower Characteristic Curves To analyze the thermal performance capability of a specified cooling tower. This equation is used for each demand curve. where, KaV/L = Tower characteristic, C = Constant related to the cooling tower design, L/G = Liquid and Gas ratio, and m or slope = Exponent related to the cooling tower design

6 Illustration of Tower Demand Curve, Characteristic Curve and Design Point Fig (1) – Tower Curve Descriptions

7 Constructing the Demand and Characteristic Curves Use the following data.  Wet bulb temperature = 75°F  Hot water temperature (T 1 ) = 100°F  Cold water temperature (T 2 ) = 80°F  Temperature range = 20°F  Approach = 5°F  L/G ratio = Needs.  To construct the demand and characteristic curves of a specified cooling tower  To plot the performance curve.

8 Solving the Requirements by using Merkel Equation T,°Fh water h air h w - h a T 2 = 80 T (20) = 82 T (20) = 88 T (20) = 92 T (20) = 98 T 1 = h 1 = 39.1 h (0.8662)(20) = h (0.8662)(20) = h (0.8662)(20) = h (0.8662)(20) = h 2 =

9 Checking Merkel Result by using CTI Toolkit v3.0 Software

10 Creating the Demand Curve with CTI Toolkit v3.0 Software Procedures  Enter the values of wet bulb temperature, range and altitude.  Put in the fill or tower coefficients C and slope (m).  Define the design point.  Click on “Recalculate” brings up the appropriate group of demand curves. DEMONSTRATE THE SOLVING PROCEDURES IN OTHER WINDOW DIALOG BOX DETAILEDLY.

11 Data Entering Dialog Box

12 Result Dialog Box after clicking the Recalculate Tab

13 The Complete Work Sheet Dialog Box Characteristic Curve Demand Curve KaV/L Line L/G Line Design Point

14 Constructing the Performance Curve of the Cooling Tower by using CTI Toolkit v3.0 Software Steps  Recalculate the approach temperature by changing the WBT again and again.  Record each approach temperature.  Then, calculate the CWT corresponding to the WBT and approach.  Plot CWT versus WBT.

15 Plotting the Tower Performance Curve Fig (2) – Off-Design Performance Curve

16 Conclusion  The performance curves are used to determine the cooling tower capability.  Tower demand curves are a graphical worksheet that facilities cooling tower calculations.  A set of performance curves of the standardized cooling towers is supplied by the tower manufacturers and companies.  Generally, it is experimentally determined by measuring field test data.

17