CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section.

Slides:



Advertisements
Similar presentations
COMPANY MAINTENANCE MANUAL
Advertisements

AS9102 First Article Inspection Report
PROJECT MANAGEMENT PROJECT MANAGEMENT. PLANNING - PROGRESS.
Learning and Development Evidence Collection Planning January 2015.
Codes & Standards.
Speech by Chinese Shipbuilding Industry ( CSNAME &CANSI ) Contents 1. The acceptation of IMO PSPC standard 2. Preparation done by Chinese shipbuilding.
PPAP Requirements Training
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
Qualification for Brazing
First Article Inspection Report
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Comments to Manufacturing QA documentation
Quality control of raw materials In-process control
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Aerospace Materials Quality Control
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
First Article Inspection
Tim Haeberle API SC Winter Meeting
NIOWAVE Requirements for Manufacturing Readiness: (Beamtube Assembly only) Due 1 month before start of manufacturing for CERN approval.
1 Inspection and Testing Approved for Public Release.
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
WWLC Standard Operating Procedures Presented by Frank Hall, Laboratory Certification Coordinator.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
TMT M1CS Actuator Pre-ship Meeting Avasarala Technologies Limited Bangalore, India September 13 th, 2013.
Software Quality Assurance Activities
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
NE 127 – Codes, Standards, and Regulations NDT & QA/QC Standards: ISO, ANSI, ATA, AIA, IEEE, etc. INSTRUCTOR: Chattanooga State CC.
October SYS 1 Quality Audit and ISO9000 Quality Standard Kinnison, Chapter 17.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Documentation Traceability and documentation is required.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
Visit us at E mail: Tele:
U.S. Domestic Reactor Conversion Program Fuel Inspections and Quality Control David F. Capp Research Reactor Fuels Inspector/Engineer 2007 RRFM Conference.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
C. Parente (HL-LHC Technical Quality Officer) Date:
Delphi E&S Instructions for Submitting PPAP for Component Parts to the PPAP Dropbox on the Websitewww.delphisuppliers.com Revised.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Status of Activities at CERN
Air Products Solutions for EN th of November 2014 Air Products Internal Use Only Name of speaker.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Metal Fabrication Quality and conformity of our products 2015.
ASME BOILER & PRESSURE VESSEL CODE AN INTERNATIONAL STANDARD
Supplier Quality Improvement
Duties and Responsibilities
SAFETY AND INFRASTRUCTURE REQUIREMENTS FOR TEL-2 INSTALLATION IN THE LAB Paolo Magagnin (BE-BI-ML) 24 – April
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Nadcap Supplier Seminar Heat Treatment
- Generals for PED matters - Definition of pressure vessel and classes - Who is who according to PED - Definition of pressure vessel + codes for XFEL -
LCLS-II Prototype Vacuum Vessel (VV) and Helium Gas Return Pipe (HGRP) FDR Planned Quality Control Effort (QC) Ken Premo 12/04/14.
11T Quality Assurance O. Housiaux, R. Berthet, S. Menu, R. Principe 3rd International Review on the 11T dipoles at collimator Section for the HL-LHC 6-8.
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Beam tube for Crab Cavity Beam tube provided by.
Results of short module and qualification strategy
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Crab Cavity Technical Coordination meeting:
Introduction CSWIP (Certification Scheme for Welding and Inspection Personnel) is administered by The Welding Institute. The CSWIP certification process.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preparation of functional/engineering specifications for HL-LHC
مرکز پژوهش و مهندسی جوش ايران تابع سازمان گسترش و صنایع نوسازی ایران
CERN Engineering Specification
First Article Inspection
First Article Inspection Report (FAIR) Training
Inspection and Testing
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson 9th SRF ESS
Quality reporting under Regulation (EC) No 1165/2008
Crab – RFD prototype: Fabrication Status Update
Presentation transcript:

CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave1 #RequirementsComments 1Niobium material samples according to Section 3.2Material samples to be sent to CERN 2 Material certificates and quality control of raw materials (including RRR measurements) 3 Material certificates of welding consumables (whenever applicable) 4 Functional and manufacturing drawings (with tolerances) 5 Design reports demonstrating that welds are designed to withstand the specified load cases (refer to Section 3.6.1) 6Welding plan including:See next clarification of acronyms

CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave2 Clarification about the means of the welding acronyms, and the steps order to make the documents: 1st- WPQR: Welding Procedure Qualification Record, and BPQR: Brazing Procedure Qualification Record 2nd- WPS: Welding Procedure Specification, and BPS: Brazing Procedure Specification 3rd- WPQ/WOPQ: Welder Performance Qualification / Welding Operator Performance Qualification, and BPQ/BOPQ: Brazers performance qualifications/Brazing Operator Performance Qualification. (According to ASME this is represented by only one document called BPQ).

CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave3 #RequirementsComments on documentation from Niowave 6Welding plan including:Brazing Welding Welding maps Ok for identification on drawings. Please take into account the following remarks: i)avoid using the same ID for different welds (see attached A73-MODIFIED.pdf) ii)the name of the final WPS, instead of the datasheet, should be indicated (see remarks for WPS below) iii)remember to keep trace of the welds also in a welding book (see attached A73-MODIFIED.pdf and Comments to Manufacturing QA documentation_ ppt) Welding and brazing procedure qualification record including CERN acceptance criteria in Section 4.2 (WPQR and BPQR) Missing The document sent (NWV-BRZ-001) is a BPQ. See BPQR.pdf for the BPQR template Missing NWV-EBW-001; NWV-EBW-002; NWV-EBW- 003; NWV-EBW-004 and NVW-EBW-005 are not WPQR. Please, see attached WPQR template according to ASME (WPQR ASME EXAMPLE.pdf) Welding and brazing procedure specification (WPS and BPS) Ok by document NWV-BPS-001. Just a correction on page 2: you should say that “BPQRs supported by this WPS”. Ok Welders performance qualification (GTAW), Welding and Brazing Operators Performance Qualifications (electron-beam welding and vacuum brazing) - WPQ, WOPQ and BOPQ The document NWV-BRZ-001 is a BPQ, but was sent as a BPQR. The title should be corrected accordingly (see NWV-BRZ- 001_modified.pdf) Missing

CERN, 4th of December 2014 Crab cavities - comments on documentation from Niowave4 #RequirementsComments on documentation from Niowave 7 Manufacturing procedures (whenever required by Annex 6.3) i)Methanol is very toxic and should be handled with extreme care. A test for replacing methanol with ethanol would be advantageous in our opinion ii)Niobium Handling and Machining Processes: According to engineering specification “The protecting niobium oxide layer is damaged at temperatures above 150 °C.” (not 200°) iii)For your information we use for deburring SiC based tools (here-attached CRATEX product) 8 Test procedures (whenever required by Annex 6.3) Just a remark on 100-RT-001(Rev8): the procedure is correct and in compliance with ASME V. It should be noted that the mentioned procedure has to follow also CERN engineering specifications (EDMS N° , pg. 11, table 6) 9 EB welded and vacuum brazed samples according to the requirements specified in Section NDT personnel qualifications Leak detection Operator Qualification & Leak check certification: qualifications according to ISO 9712 or SNT-TC-1A, and written procedure in compliance with EN13885 or ASME V are requested. These documents do not meet neither ISO nor ASME requirements. 11Manufacturing and inspection plan (MIP) - list of all manufacturing and quality control operations It would be useful to issue an overall MIP document, instead of a MIP for each part. Please see the example attached Comments to Manufacturing QA documentation.ppt.