Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can.

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Operations Scheduling
Process Analysis If you cannot describe what you are doing as a process, you do not know what you are doing. W.E. Deming.
6 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Capacity Planning (Long-Term Capacity Planning) 6.
Process Design and Analysis
Process Strategies How to produce a product or provide a service that
11–1. 11–2 Chapter Eleven Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
MBA 8452 Systems and Operations Management
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Quality, Time, and the Theory of Constraints Chapter 19.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Managing Process Flows
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Operating Processes process  A process is a set of tasks to be performed in a defined sequence  A process uses inputs to create outputs that are of value.
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Copyright © 2003 Pearson Education Canada Inc. Slide Chapter 19 Cost Management: Quality, Time, and the Theory of Constraints.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2012 Pearson Prentice Hall. All rights reserved. Balanced Scorecard: Quality, Time, and the Theory of Constraints.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Process Analysis.
1 © The McGraw-Hill Companies, Inc., 2004 Introduction (from Chase) Process Analysis.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
1 A Fundamental Principle of TPS Produce to Demand 1.Make only what is needed when it is needed. 2.Base production and planning on Takt Time. 3.Develop.
Announcement-exam rules
Capacity and Constraint Management
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 29 1.
Managing Processes and Capabilities CHAPTER THREE.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
S7 - 1© 2014 Pearson Education, Inc. Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
The Impact of Variability on Process Performance.
Process Analysis CHAPTER 5. Learning Objectives 1. Recognize three basic types of processes: a serial flow process, parallel processes (such as what happens.
Operations Management For Competitive Advantage 1 Process Analysis Operations Management For Competitive Advantage Chapter 4.
Process Analysis I Operations -- Prof. Juran.
Mohamed Iqbal P Production and Inventory Control- Introduction (1) IEM Production and Inventory Control Introduction Mohamed Iqbal P.
7 Capacity Planning PowerPoint presentation to accompany
Copyright ©2016 Cengage Learning. All Rights Reserved
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management yl.
S7 - 1© 2014 Pearson Education Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh.
Chapter 7s Class 1.
Operations Fall 2015 Bruce Duggan Providence University College.
Chapter 6 Managing Capacity
Trauma center moves to diversion status once all servers are busy (incoming patients are directed to other locations) Figure 7.1.: Process flow diagram.
Suppl Capacity Planning Heizer and Render Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl.
Bottleneck Analysis and Theory of Constraints
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Constraint Management Chapter 7 Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall
S7 - 1 Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh Edition Principles of Operations.
MGT 657 operations management Lecture 6b
Balanced Scorecard: Quality, Time, and the Theory of Constraints
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Analytical Tools for Process Analysis and Improvement
7 3 Capacity Planning PowerPoint presentation to accompany
Process Design and Analysis
Synchronous Manufacturing
Constraint Management
Process Analysis.
Chapter 5 Process Analysis.
Section 2.2 The Graph of a Function
Section 2.2 The Graph of a Function
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Chapter 5 Process Analysis.
Presentation transcript:

Process Analysis process  A process is a set of tasks to be performed in a defined sequence  Process analysis describes how a process is doing and can be improved  Process flow diagrams  Process flow diagrams describe pictorially the process and the flow of product and information in the process  Process performance is measured based on capacity, efficiency and effectiveness

A Sequential Process: Four- Station Assembly Line 20 min/unit 8 min/unit 15 min/unit Task ATask B Task C 10 min/unit Task D

Process Times for Tasks and Systems process time of a task  The process time of a task is the time it takes to perform the task bottleneck time  The bottleneck time is the time of the longest process time in the system throughput time  The throughput time is the time it takes for a product to go through production or for a customer to receive service from start to end (assuming no waiting)

Cycle Times and Bottleneck Pacing system cycle time  The system cycle time is the average time between completion of successive units of product or departures of successive customers  The system cycle time is the process time of the bottleneck  The bottleneck limits the output of the process! blocked tasks that create surplus inventory starved tasks  Other tasks in process are blocked tasks that create surplus inventory or starved tasks that experience idle time as they wait to start their tasks

Determining Capacity  Capacity  Capacity is the number of units of product that a process can produce in a specified time period (e.g. units per hour) capacity  For service processes, capacity is the number of customers who can be served in a specified time period  The capacity of a process is the inverse of the cycle time. To calculate capacity per hour: 1 hour/cycle time in hours = 60 min/cycle time in minutes

Bottleneck Management 1.Release work orders to the system at the pace set by the bottleneck 2.Lost time at the bottleneck represents lost time for the whole system 3.Increasing the capacity of a non-bottleneck task is a mirage 4.Increasing the capacity of a bottleneck increases the capacity of the whole system 5.Capacity at a station can be increased by lowering the process time.

Capacity Analysis  Two identical sandwich lines  Each line has two workers and a toaster to perform the three operations  All completed sandwiches are wrapped Wrap 37.5 sec/sandwich Order 30 sec/sandwich BreadFillToast 15 sec/sandwich 20 sec/sandwich 40 sec/sandwich BreadFillToast 15 sec/sandwich20 sec/sandwich40 sec/sandwich

Theory of Constraints  Five-step process for recognizing and managing limitations Step 1: Step 1: Identify the constraint Step 2: Step 2:Develop a plan for overcoming the constraints Step 3: Step 3:Focus resources on accomplishing Step 2 Step 4: Step 4:Reduce the effects of constraints by offloading work or expanding capability Step 5: Step 5:Once overcome, go back to Step 1 and find new constraints

© 2011 Pearson Education, Inc. publishing as Prentice Hall Capacity Analysis Wrap 37.5 sec Order 30 sec BreadFillToast 15 sec 20 sec 40 sec BreadFillToast 15 sec20 sec40 sec  Toast station has longest processing time – 40 seconds  The two parallel lines each deliver a sandwich every 40 seconds so every 20 seconds a sandwich will come off one of the lines (40 seconds/2 lines)  At 37.5 seconds, wrapping and delivery has the longest processing time and is the bottleneck  Capacity per hour is 3,600 seconds/37.5 seconds/sandwich = 96 sandwiches per hour  Throughput time is = seconds = time customer must wait for sandwich assuming no waiting at any of the stations

Measures of Process Performance  Capacity  Capacity affects revenue potential  Efficiency  Efficiency measures how well processes make use of inputs (e.g. labor, material, equipment) and affects costs and profits  Effectiveness  Effectiveness measures how well the process delivers the customer promise  Quality  Speed (throughput time)  Flexibility & responsiveness  Safety