E 1 David Murphy 31-Oct-06/1-Nov-02 Agenda + U.S. VSOP-2 Support Plans.

Slides:



Advertisements
Similar presentations
Sacramento Local Agency Formation Commission (LAFCo) ANALYSIS OF PROPOSED SMUD SPHERE OF INFLUENCE AND ANNEXATION Presented by Chris Tooker Friday, October.
Advertisements

16 th International Laser Ranging Workshop, Poznan Poland, Oct. 14 th, 2008 Laser Ranging (LR)-Lunar Reconnaissance Orbiter (LRO) Data Flow and Scheduling.
CCSDS XML Telemetric and Command Exchange (XTCE)
1 Administrative Units - Compact Planning Details.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
DMS Systems Design Review 3
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
Identifying Priority Projects for Funding Joan LeBlanc GOMC Council Coordinator.
June 2004 SIW-4 - IP in Space Implementation Guide 1 Handbook for Using IP Protocols for Space Missions James Rash - NASA/GSFC Keith Hogie, Ed Criscuolo,
2010 W EST V IRGINIA GIS C ONFERENCE Wednesday, June 9, 2010.
January Software Research and Technology Infusion 14 January 2008 Presented by Lisa Montgomery, NASA Pavan Rajagopal,
1 NUOPC National Unified Operational Prediction Capability 1 Review Committee for Operational Processing Centers National Unified Operational Prediction.
ANNUAL REPORT TO THE COLLEGE SENATE SUNY ONEONTA MAY 7, 2012 Strategic Planning Council.
WFMOS Status Report Doug Simons Gemini Observatory January 2008.
SOFIA Proposal Timeline Millimeter/THz Development at the NRAO CDL 1 18-Feb-2011: NRAO Science/Engineering Advisory Panels in place 25-Feb-2011: NRAO Science.
Summary of Timeline Discussion: The three timeline options in the following slides reflect opportunities to evaluate progress on the draft and potential.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Panel P1J: Navigation Data May 2001 CCSDS P1J Status Report P1 Plenary Meeting May 23, 2001 TSG Meeting May 24-25, 2001 Pasadena, California, USA Felipe.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
Recent Developments NASA IDL/MDL study indicated technical feasibility of an ISS mission NASA IDL/MDL cost estimate was well above Earth Venture limits.
TRANSFORMING U.S. INVENTION INTO INNOVATION Bridging the Commercialization Gap at U.S. Universities and Federal Research Institutions Presentation to Boston.
ESA DDOR cross support Slide 1 CCSDS Fall Meeting 2007 ESA  DOR cross support Mattia Mercolino, ESA/ESOC.
Label Design Tool Management Council F2F Washington, D.C. November 29-30, 2006
1 Academic Departments - Compact Planning Details.
13-17 October 2008 Berlin, Germany eb - 1 SMWG Closing Plenary Report Fall 2008 Meeting Erik Barkley 17 October 2008.
ALMA Week, 2004 March 3-5, in Garmisch, Germany ALMA Operations Plan: Progress Report Darrel Emerson (NRAO) David Silva (ESO) JAO Operations Group
ASTRO-G project VSOP-2 – VLBI Space Observatory Programme times higher sensitivity. 10 times higher frequency observation 10 times higher resolution.
Probabilistic Technology Initiative for NASA Pam Caruso Technical Assistant to the Director, Engineering NASA/Marshall Space Flight Center Presented to.
May 18, 2004Ron Allen, STScI Lunch Talk1 Space Interferometry Mission (SIM) Update - May 2004 Ron Allen SIM Mission Scientist Space Telescope Science Institute.
Outlook for European role in the VSOP-2 mission L.I. Gurvits JIVE, Dwingeloo, The Netherlands VSOP-2 meeting Pasadena, CA, USA,
Constellation Space Transportation Planning Office July 30, 2009.
Pursuing High Value Healthcare Optimizing Laboratory Testing Year 2 Kick Off September 1oth, 2-3PM 1.
Cryosphere and the Next Decadal Survey KCJ. NAS Organization Committee on Earth Science and Applications from Space: support scientific progress in Earth.
Lt Col Tim Brown HQ AFSPC/DA5F Launch and Test Range Activities Update May 2006.
Delta-DOR SIG Minutes of the meeting Heppenheim, Germany October 2nd, 2007 Roberto Maddè ESA/ESOC
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
“Inspiring our students to reach their full potential.”
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Action Items 1 November Action Items - I Assess frequency coverage at 22 GHz vs. science goals, and decide whether lower frequency should be changed—Murata,
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
10/31/2006VSOP-2 Tracking Station Meeting 1 Lessons Learned From VSOP-1 Larry R. D’Addario JPL.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
EMIS Update: State Board of Education January 11, 2016.
Preparing for the Future: NASA's Planning for the Decadal Survey
Boulder Junction Town Road Improvement Project
Status of the Planning Working Group’s (PWG) Efforts
SIS-DTN WG Wednesday Afternoon
The European Contribution to eXTP
Potential NASA Funding Sources
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
L. Kogan (NRAO), S. Likhachev, I. Girin, & V. Ladigin (ASC)
Mattia Mercolino, ESA/ESOC
Electric Vehicles and the Environment (EVE IWG)
NRAO-GB Support for VSOP-2
Portfolio Management Process & Customer Request Management
Iowa College Aid Processing System (ICAPS)
Gustaaf van Moorsel September 9, 2003
VLBA Correlator Interfaces for VSOP-2
PARCA Timeline.
Action Items Following these success of VSOP, science targets of VSOP-2 approach the central region of AGN. studies of accretion disks and jets in AGN.
XRN Feb 19 Minor Release - Status Update
Proposed June 2020 UK Link Major Release Scope / Governance Timeline
Status report of OBD Task Force
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Presentation transcript:

e 1 David Murphy 31-Oct-06/1-Nov-02 Agenda + U.S. VSOP-2 Support Plans

e 2 31-October-06 Agenda - 31 Oct 8:30- 9:00 Arrive at JPL Visitors center, get coffee 9:00- 9:15 Welcome and Introduction - Murphy 9:15- 9:45 VSOP-2 Mission Update - Hirax 9:45-10:00 European plans for VSOP-2 support - Gurvits 10:00-10:15 U.S. plans for VSOP-2 support - Murphy 10:15-11:30 Tracking Station Requirements - Murata/Kono -overall requirements: number and distribution tracking stations -individual tracking station requirements 11:30-12:00 ISAS VSOP-2 tracking station - Murata/Kono 12:00-1:00 *** Lunch *** 01:00-1:30 Potential Spanish VSOP-2 tracking - Lopez Fernandez station 1:30-2:00 Potential NRAO Green Bank tracking station - Langston 02:00-2:30 Potential JPL tracking stations - D'Addario/Jones 02:30-3:30 VSOP tracking stations lessons learned - Ulvestad/D'Addario/Langston/Smith 3:30-4:30 Tracking station design discussion - All -can we generate a common design? -share components? -place uplink on small nearby antenna?

e 3 31-October-06 Agenda - 1 Nov 8:30-9:00 Arrive at JPL Visitors center, get coffee 9:00-10:00 Tracking station input and output products - Murata/Kono - in: schedule file -in: frequency predicts -out: time-correction file -out: telemetry data file -out: VLBI data 10:00-10:30 Correlator interface issues - Ulvestad 10:30-12:00 Future plans - All -Possible scenarios for sharing international tracking of VSOP-2 -A plan for convergence to a tracking plan (actions and schedules) -Future interactions/meetings of this group 12:00-1:00 *** Lunch *** 1:00-4:00 Future plans continued /More discussions on tracking station design -All 4:00-4:30 Summary

e 4 31-October-06 U.S. VSOP-2 Support Plans Identify a source of funding in current challenging NASA environment where priorities are being re-directed towards ‘Apollo on steroids’ shuttle replacement vehicle Very different situation from when NASA decided to support VSOP In general NASA has open competitions for science missions Need to find a suitable competition and win selection! Only game in town appears to be 35 M$ Midex Mission of Opportunity (MoO) Our good cards: -VSOP-2 is already approved in Japan -ARISE decadal report legacy Our bad cards: -Relatively small U.S. VLBI community -Currently little support available to prepare proposal

e 5 31-October-06 Rough VSOP-2 Midex MoO Timeline Sept ‘06 VSOP-2 presentation at JPL to try and get internal JPL concept study funds Nov ‘06 JPL decides on concept studies to support Nov ‘06 - Mar ‘07 Undertake concept study Mar ‘07 JPL concept study review Mar ‘07 Draft Midex Proposal released Apr ‘07-Jan ‘08 Prepare VSOP-2 Midex MoO Jan ‘08 Submit VSOP-2 Midex MoO Jan ‘08+ NASA Midex Selection

e 6 31-October-06 Possible Uses of 35 M$ MoO Funding 1.Use of NRAO’s VLBA 2.Use of NRAO’s VLBA correlator 3.NRAO Green Bank tracking station 4.1 or more JPL tracking stations (locations TBD) 5.On-board JPL GPS receiver + GPS analysis support 6.U.S. science support (funding for U.S. PIs, experiment planning software) 7.JPL project office 8.Other - TBD

e 7 31-October-06 Concept Study What trades will be performed in a concept study? -Determine best of use limited MoO resources -Determine best distribution of responsibilities between U.S., Japanese, European and other international partners What are the top three technical issues that would be addressed? -Design, number, and locations of tracking stations -GPS/phase-referencing study -What correlator and VLBA upgrades need to be undertaken to support VSOP-2 What are the top three programmatic issues that would be addressed? -Sharing of mission responsibilities with Japanese and U.S./international partners -ITAR/TAA/MOU issues -Formation and operation of U.S. MoO team What support would you need from outside JPL -NRAO + university support