3rd ASAS TN Workshop 19 April – 21 April 2004 1 3rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Military Airworthiness Workshop, EU2009.CZ, Olomouc, Czech Republic, 5 June 2009 – M. Allouche WG73 SG2 Briefing Michael Allouche, SG2 Leader WORKING GROUP.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
Overview of the interoperability Regulation
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Data Link Convergence ICAO DLSG and ADG Activities ICAO ACP 5 July 2006 José Roca CASCADE Deputy Programme Manager
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ASAS TN 2nd Workshop 6-8 October ADS-B Safety Analysis (ASA & GSA) Bob Darby EUROCONTROL ADS Programme ASAS Thematic Network Second Workshop 6-8.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Extending GPS and Galileo interoperability: from frequency/signals to integrity Francisco Salabert Head of GNSS Policy Office DDAS/ EUROCONTROL.
‘One Sky for Europe’ EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 VALIDATION DATA REPOSITORY Overview.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
European Commission International Civil Aviation Organization Status of industry standards for GNSS CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May.
The ICAO Standardization Process. 2 Introduction Not going to attempt an introduction to ICAO Nor all its documentation ICAO produces international standards.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
1 Global Aviation Safety Plan Capt. Len Cormier. 2 Global Aviation Safety Plan  The first edition of GASP was issued in 1997  GASP was used to guide.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
EHealth Interoperability – EU Commission activities Dr Octavian Purcarea Unit H1 – ICT for Health Directorate ICT for citizens and businesses DG INFSO.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
1 Presentation to ASAS TN2 17 th September 2007 Mel Rees Head of Surveillance EUROCONTROL EUROCONTROL SURVEILLANCE STRATEGY.
ASAS TN2 Final Seminar Paris, April 2008 Recommendations by the ASAS Thematic Network Ken Carpenter.
ASAS Thematic Network 2.5 Towards an ASAS-Global Network.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
Air Traffic Management activities in ETSI Jørgen Friis Deputy Director-General DOCUMENT #:GSC13-GRSC6-23 FOR:Presentation SOURCE:Jørgen Friis AGENDA ITEM:4.5.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
ASAS TN2 Final Seminar Paris, April Jean-Marc Loscos, DSNA chairman of the Airborne Surveillance Subgroup of the Aeronautical Surveillance.
European Organisation for the Safety of Air Navigation RFG ASPA-S&M Requirements Determination ASAS-TN th September Malmo, Sweden.
International Civil Aviation Organization Global Runway Safety Symposium ICAO’s Harmonization Initiatives John Illson Air Navigation Bureau 25 May 2011.
A consolidated starting point from DFS / AENA / LFV ASAS Thematic Network Workshop Toulouse, Is ASAS /ADS-B needed for ANSP strategy?
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
4 th Workshop, Amsterdam, April 2007 Progress since 2003 First workshop in 2003 (Rome) Large number of successful R&D projects in US and Europe.
International Civil Aviation Organization Overview of the Block Upgrades Concept Tai Feng Air Navigation Commissioner International Civil Aviation Organization.
European Commission 1 Interoperability of Air Traffic Management systems for the Single European Sky.
Workshop on preparations for ANConf/12 − ASBU methodology
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
International Cooperation
Global Air Navigation System ~ Planning Mechanisms ~
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
EUROCONTROL SURVEILLANCE STRATEGY
ASSTAR Project Overview & User Forum Objectives
Workshop on preparations for ANConf/12 − ASBU methodology
Session – 4: Existing ICAO Standards relating to Air Traffic Control
Objectives of the Workshop
Marine Strategy Framework Directive (MSFD)
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
ICAO Forum on Integration and Harmonization of NextGen and SESAR into the Global ATM Framework 8-10 September 2008 Lex Hendriks Deputy Director DAS, EUROCONTROL.
ICAO EUR HLSC Preparatory Seminar
International Civil Aviation Organization
The ATM Standardisation Coordination Group
Presentation transcript:

3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid Global Harmonisation”) Jörg Steinleitner EUROCONTROL ADS Programme

3rd ASAS TN Workshop 19 April – 21 April Introduction l The “Requirements Focus Group” (RFG) performs the “Co-ordinated Requirements Determination” of Package I. l The work of the group is a very important step towards world-wide interoperability, related to both the operational procedures and the technical infrastructure of Package I : v In line with related ICAO ANC/11 recommendations. l In accordance with the rationale of the definition of Package I, the RFG supports a pragmatic approach towards the early and efficient implementation of Package I. l The group is in line with the provisions of the (European) Master Plan/Working Arrangements for Package I.

3rd ASAS TN Workshop 19 April – 21 April “Co-ordinated Requirements Determination” l “To establish requirements that require co-ordination among organisations involved in the development, qualification, approval and operation of the CNS/ATM system” : v In support of ATS provider operational approval, operator operational approval, and aircraft type design approval. l It consists of the following processes : v Operational Services and Environment Information Capture (OSEIC); v Operational Safety Assessment OSA (OHA, ASOR); v Operational Performance Assessment (OPA); v Interoperability Assessment (IA).

3rd ASAS TN Workshop 19 April – 21 April RFG Objectives l To harmonise between Europe, the USA and other regions the definition of the operational applications contained in Package I and the environments they are operating in. l To establish the Package I Safety, Performance and Interoperability requirements. l To produce deliverables that will be proposed as input to and in co-operation with : v International Civil Aviation Organisation (ICAO) panels; v Regional Co-ordination Groups; v Standards Organisations (e.g. EUROCAE, RTCA); v Regulatory Authorities.

3rd ASAS TN Workshop 19 April – 21 April RFG Members l The RFG is a joint European/US activity : v Principal membership of experts from EUROCONTROL, FAA, EUROCAE WG51 and RTCA SC-186. l RFG is open to additional membership : v Australia has joined already, Japan is about to do so. l “Co-ordinated” requirements determination asks for the involvement of all relevant stakeholder categories : v Required for highly integrated systems such as Package I; v Inclusion of operational and technical experts : © Air Navigation Service Providers; © Airspace Users; © Airframe, ATM and Avionics Equipment Industry; © Regulatory Authorities.

3rd ASAS TN Workshop 19 April – 21 April RFG Deliverables l The RFG will deliver (through an iterative process) : v Operational Service and Environment Definition (OSED); v Safety and Performance Requirements (SPR) standard; v Interoperability Requirements (INTEROP) standard. l In line with ED78A/DO-264 Guidelines. l Relationship with other Package I deliverables : v Top-down : © Based on strategy, concept and operational requirements documentation; © Requirements flow down to systems documentation (e.g. MASPS). v Bottom-up : © Use existing systems documentation as initial input; © Feed-back to documentation (e.g. concept) at a “higher” level.

3rd ASAS TN Workshop 19 April – 21 April Use of RFG Deliverables l By States: v Through their experts within ICAO panels and working groups; v To develop operational and technical standards (e.g. PANS- ATM, PANS-OPS, Annex 10, …) l By Industry: v Through their representations within RTCA and EUROCAE; v To develop technical standards (e.g. MASPS, MOPS, …) for the development and certification of equipment. l By Regulatory Bodies: v To facilitate the end-to-end approval of the operational applications.

3rd ASAS TN Workshop 19 April – 21 April Package I Master Plan : Relationship of Deliverables

3rd ASAS TN Workshop 19 April – 21 April RFG “Reporting Authorities” l European reporting authorities : v EUROCONTROL for OSED document; v EUROCAE WG51 for SPR and INTEROP standards. l USA reporting authorities : v Split along Ground and Airborne Surveillance Applications; v FAA for GSA OSED, SPR and INTEROP; v RTCA SC-186 for ASA OSED, SPR and INTEROP. l RFG will keep the relevant FAA and EUROCONTROL bodies informed through Action Plan 1 and Action Plan 10 of the FAA/EUROCONTROL R&D Committee.

3rd ASAS TN Workshop 19 April – 21 April RFG Organisation * incl. operational interoperability matters** incl. technical interoperability matters

3rd ASAS TN Workshop 19 April – 21 April RFG High-Level Schedule

3rd ASAS TN Workshop 19 April – 21 April RFG Recent and Upcoming Events l RFG/3 held from 1st to 4th December 2003 (USA) : v Kick-off of joint AD and SPR sub-groups. l OSED v1.0 delivered mid February 2004 : v Based on Former European OSED HG work; v Triggered intensive comment and issue resolution process. l AD SG/2 and SPR SG/2 meetings held from 29th March to 1st April 2004 (USA) : v Finalising the OSED v1.0 resolution process; v Progressing on joint “fast-track” SPR work. l OSED v1.1 to be delivered end April 2004 l RFG/4 will be held from 21st to 24th June (Europe) : v Finalisation of “Initial OSED” and “Pre-SPR” deliverables.

3rd ASAS TN Workshop 19 April – 21 April SUR Conclusion l The RFG work is focused to foster the implementation of an initial set of ADS-B enabled applications (Package I). l The RFG work is essential because it is necessary to develop co-ordinated operational and technical requirements for world-wide interoperability of Package I. l The RFG is looking for harmonisation. l The RFG needs to be pragmatic and takes benefit of the work already performed (e.g. ASA MASPS, OSEDs). l The RFG supports but does not replace existing standardisation bodies and processes. The RFG has a huge responsibility for the early implementation of ‘Package I’ applications