Run Coordinator Weekly Report EG6 Commissioning October 19-25 Raffaella De Vita.

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

Run Plan Document E04-007: Threshold Pion Production.
FROST G9b FROST status update May 24 - June 13, Run Coordinators: Mike Dugger, Eugene Pasyuk, Barry Ritchie.
MWPC Commissioning: A Status Report What the MWPC’s do and how Data taking Jan-Feb 2000 Results from the Analysis.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Luminosity Monitor Commissioning MICE Collaboration Meeting March 2010 Paul Soler, David Forrest Danielle MacLennan.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Neutron Structure Functions and a Radial Time Projection Chamber The Structure of the Neutron The BoNuS Experiment at CLAS A New Proton Recoil Detector.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Luminosity Monitor UKNF Meeting 7 June 2010 Paul Soler, David Forrest Danielle MacLennan.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calibration of the gain and measurement of the noise for the apv25 electronics K. Gnanvo, N. Liyanage, C.Gu, K. Saenboonruang From INFN Italy: E. Cisbani,
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Idea for next data taking at FNAL Dec-14 th 2008 ScECAL S. Uozumi (Kobe)
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Run Coordnator Report 2012/04/ /04/10 Jixie Zhang
Measurement of Exclusive  - Electro-production from the Neutron in the Resonance Region Jixie Zhang Physics Department Old Dominion University 11/30/2006.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
FEE for TPC MPD__NICA JINR
2007 IEEE Nuclear Science Symposium (NSS)
Weekly PDL report (Jul 7-14)
Saikat Biswas, A. Abuhoza, U. Frankenfeld, C. Garabatos,
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Week coordinator report - C. Marchand
PADME L0 Trigger Processor
Luminosity Monitor Status
CMS Preshower: Startup procedures: Reconstruction & calibration
Focus Coil Quench Detector
ScECAL+AHCAL+TCMT Combined Beam FNAL
Status of n-XYTER read-out chain at GSI
BESIII EMC electronics
Commissioning of the ALICE-PHOS trigger
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
GEANT Simulations and Track Reconstruction
The CMS Tracking Readout and Front End Driver Testing
SOS Cerenkov Purpose: provide PID for NA Cerenkov efficiency studies
PID meeting Mechanical implementation Electronics architecture
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita

Run Plan for the Week Data Taking at 5.78 GeV –Runs with different settings of RTPC HV and solenoid field (534 A, 450 A) for running condition –DAQ tests –Optimization of RTPC FEE Configuration Pass Change (5  1) on Thursday 22nd Data Taking at 1.2 GeV –Measurement of elastic scattering on He4 for calibration purpose: electron trigger only, 80 50% LT –RTPC HV scans for choice of optimal condition for detection of alpha particle

Severe Problems: Power Outage on Tuesday 20th at 9:08 pm: –Power in the Counting Room maintained thanks to UPS and emergency generator –Torus and Solenoid ramped down –Loss of cryogenics –Power restored at 10:15 pm –Technicians and System Experts down in the Hall to recover various system –Recovery work continued till afternoon of Wednesday –Major Failure: –Target gas control box because of water dripping from higher levels –EC Sector 5 HV mainframe –Beam restored Wednesday night Fast and efficient recovery from difficult situation thanks to the hard work of all technicians and system experts Many thanks to Krister for repairing the target gas control box in record time

Other Problems Recurring trips of RTPC HV because of high humidity level. Seem to be connected to air flow from fan used for preamplifier cooling. Problem solved by modifying air pipe direction Noise on RTPC signal preamplifier still being investigated Bad RTPC FECs replaced Various accesses for DAQ related resets (bonuspc1, ec2) IC HV power supply DC trips in R2S2 (low gas flow) and R2S3 (limp gas bag, leak?) Sniffer alarm because of blown fuse EC discriminator in sector 1 outer replaced

Beam Quality Beam quality has been fairly good both at 5.78 and 1.2 GeV Problems noted: –Orbit locks intentionally turned off for a few days by MCC Orbit locks for restored on Monday –Few detector trips induced by bad beam position after long trips in the last few days; problem is being addressed

Choice of Solenoid Field Choice between 534 A and 450 A: 534 A provides better shielding from Moeller electrons 450 A gives better efficiency for detection of low momentum tracks in RTPC Measurement of trigger rate, IC rates, DC occupancy and currents indicate the running with 450 A Solenoid current can be sustained up to beam currents of 100 nA or more:  Trigger 100 nA:  Electron Trigger ≈ 1.2 KHz  Neutral trigger ≈ 4 KHz (will be reduced by increasing thresholds)  DC 50 nA ≈ 1 %  IC 50 nA < 25 KHz on inner crystals

nA Electron trigger rate ≈ 600 Hz

RTPC FEE Configuration Optimization of ADC (ALTRO chip) settings: starting point based on BONUS setup 100 samples/ch at 10 MHz sampling frequency  10 us sampling window dynamic pedestal subtraction: a variable pedestal is determined for each channel as the average of samples outside the acquisition window zero suppression for data volume reduction based on glitch filter Basic detection schemeFinal Samples

RTPC Response to  source Two  (Am241) sources installed in the RTPC Signal measured in self triggering mode Trigger signal from left and right RTPC sides are built as the sum of 16 GEM channels corresponding to the source closest pads Clear signal (40-80 mV) visible on the scope

1.2 GeV Running Low energy run for RTPC calibration via the measurement of elastic scattering on He4: Elastic scattering cross section higher at low energy and small electron scattering angles Electron detected in CLAS Elastic events selected thanks to over-constrained kinematics (p e ↔  e ) 4-momentum of recoiling He4 can be calculated from electron variables Comparison with reconstructed tracks from RTPC allow to perform calibration and determine resolution and efficiency Running Conditions: Beam Current : nA Target Pressure: 75 psig DAQ rate (Roc Lock mode): KHz Dead Time: 50 % Electron Trigger Only: CC x EC (ECtot = 200 mV)

1.2 GeV Running

Event Reconstruction

Elastic Events on He4

RTPC-CLAS Correlations

RTPC DAQ Running in ROC Lock mode Implementation of pipeline readout still in progress: –First tests showed that rate of few kHz can be achieved –Synchronization problems have been observed: Trigger is issued and processed by readout controller Data sampling is performed Acquired sample are stored in ADC Multi Event Buffer BUT NO READOUT OPERATION is initiated by the controller –Reason not understood –Communication with CERN Group to identify and implement a solution is in progress

Pending Issues High Frequency noise on the RTPC signal has been observed Noise seems to be associated with data read-out operation Noise level is of the order of mV but varies in different crates (left side is more noisy) May not be a problem for the signal extraction because appears after the sampling window trigger sampling window readout starts

Plans for Upcoming Week Continue data taking at 1.2 GeV till Wednesday Data for different RTPC HV settings are been analyzed to choose optimal running condition for 6 GeV Pass change (1  5) after Tour on Wednesday Energy change (6.07 GeV) on Thursday Next Run Coordinator is Eric Voutier