The IGS contribution to ITRF2013 – Preliminary results from the IGS repro2 SINEX combinations Paul Rebischung, Bruno Garayt, Xavier Collilieux, Zuheir.

Slides:



Advertisements
Similar presentations
2006 AGU Fall Meeting. 14 Dec. 2006, San Francisco – Poster #G43A-0985 Jim Ray (NOAA/NGS), Tonie van Dam (U. Luxembourg), Zuheir Altamimi (IGN), Xavier.
Advertisements

Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | A | Cambridge MA V F.
Reference Frames for GPS Applications and Research
The Role of GNSS in Modern Reference Frames
IAG Sub-Commission 1.3c Regional Reference Frames for North America 1 Regional Reference Frames for North America Current Status & Future Plans of Regional.
3. Geocentre and scale Comparison of weekly and daily IGS reference frames: the first year Peter J Clarke, School of Civil Engineering and Geosciences,
Seasonal Position Variations and Regional Reference Frame Realization Jeff Freymueller Geophysical Institute University of Alaska Fairbanks.
Jim Ray & Jake Griffiths, NOAA/National Geodetic Survey Xavier Collilieux & Paul Rebischung, IGN/LAREG S UBSEASONAL GNSS P OSITIONING E RRORS Linear rate.
Jake Griffiths & Jim Ray NOAA/National Geodetic Survey Acknowledgement: Kevin Choi SUBDAILY ALIAS AND DRACONITIC ERRORS IN THE IGS ORBITS Harmonics of.
POD/Geoid Splinter Summary OSTS Meeting, Hobart 2007.
International Terrestrial Reference Frame - Latest Developments Horst Müller 16th International Workshop on Laser Ranging, Poznan, Poland, October
ILRS Workshop, Poznan, Poland, October Status of ITRF Development and SLR Contribution Zuheir Altamimi Xavier Collilieux David Coulot IGN France.
The IGS contribution to ITRF2014 Paul Rebischung, Bruno Garayt, Zuheir Altamimi, Xavier Collilieux 26th IUGG General Assembly, Prague, 28 June.
SOPAC's Instantaneous Global Plate Motion Model: Yehuda Bock, Linette Prawirodirdjo, Peng Fang, Paul Jamason, Shimon Wdowinski (TAU, UMiami) Scripps Orbit.
Workshop, Miami, June 2008 ITRF2005 residuals and co-location tie issues Zuheir Altamimi IGN, France Some features of ITRF2005 residuals ITRF2005 vs IGS05.
Jim Ray & Jake Griffiths, NOAA/National Geodetic Survey Xavier Collilieux & Paul Rebischung, IGN/LAREG S UBSEASONAL GNSS P OSITIONING E RRORS Linear rate.
Jim Ray & Jake Griffiths NOAA/National Geodetic Survey STATUS OF IGS ORBIT MODELING & AREAS FOR IMPROVEMENT Earth radiation pressure (albedo) accelerations.
IGS Analysis Center Workshop, Miami Beach, 2-6 June 2008 M. Fritsche, R. Dietrich, A. Rülke Institut für Planetare Geodäsie (IPG), Technische Universität.
2013 AGU Fall Meeting – 9 December 2013 – San Francisco, CA – Poster #G13B-0933 Status of IGS Core Products J. Griffiths NOAA,
GNSS Observations of Earth Orientation Jim Ray, NOAA/NGS 1. Polar motion observability using GNSS – concepts, complications, & error sources – subdaily.
RFWG report ______________________ IGS 39th Governing Board Meeting San Francisco, 3 December
Jim Ray, NOAA/National Geodetic Survey Xavier Collilieux & Paul Rebischung, IGN/LAREG Tonie van Dam, University of Luxembourg Zuheir Altamimi, IGN/LAREG.
1 North American Reference Frame (NAREF) Working Group Mike Craymer Geodetic Survey Division, Natural Resources Canada 2nd SNARF Workshop Montreal, May.
1/17 REFAG Symposium 6 October 2010 – Marne-la-Vallée, France Recent Results from the IGS Terrestrial Frame Combinations __________________________________________________________________________________________________.
IGS Analysis Center Workshop, 2-6 June 2008, Florida, USA GPS in the ITRF Combination D. Angermann, H. Drewes, M. Krügel, B. Meisel Deutsches Geodätisches.
IGS Workshop, June 02, Validation of GNSS Satellite Orbits C. Flohrer, G. Beutler, R. Dach, W. Gurtner, U. Hugentobler 1, S. Schaer, T. Springer.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
AGU Fall meeting Quality assessment of GPS reprocessed Terrestrial Reference Frame 1 IGN/LAREG and GRGS 2 University of Luxembourg X Collilieux.
SNARF: Theory and Practice, and Implications Thomas Herring Department of Earth Atmospheric and Planetary Sciences, MIT
Testing intraplate deformation in the North American plate interior E. Calais (Purdue Univ.), C. DeMets (U. Wisc.), J.M. Nocquet (Oxford and IGN) ● Is.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
Earth Sciences Sector SLIDE 1 NAREF & CBN Velocity Solutions for a New Version of SNARF Mike Craymer Joe Henton Mike Piraszewski 8th SNARF Workshop AGU.
Assessment of Reference Frame Stability trough offset detection in GPS coordinate time series Dragan Blagojević 1), Goran Todorović 2), Violeta Vasilić.
ESOC Navigation Support Office IGS Workshop 2008 Miami ESOC IGS Reprocessing T.A. Springer, F. Dilssner, E. Schoenemann, I. Romero, J. Tegedor, F. Pereira,
Geocenter motion estimates from the IGS Analysis Center solutions P. Rebischung, X. Collilieux, Z. Altamimi IGN/LAREG & GRGS 1 EGU General Assembly, Vienna,
Geocenter Variations Derived from GRACE Data Z. Kang, B. Tapley, J. Chen, J. Ries, S. Bettadpur Joint International GSTM and SPP Symposium GFZ Potsdam,
1/16 ITRF2008-P: Some evaluation elements and impact on IGS RF products Paul Rebischung, Bruno Garayt, 16 April 2010 ITRF2008-P: SOME EVALUATION ELEMENTS.
IGS Workshop 2008, June 2-6, Miami Beach First activities of the IGS Antenna Working Group — Comparison of ground- and space-based satellite antenna maps.
International Workshop on Laser Ranging, October 2008, Poznań (Poland) Quality assessment of the ILRS EOP „Daily” Product G. Bianco Agenzia Spaziale.
IGS Analysis Center Workshop, Miami Beach, June 2008 Current Status of the IGS Reprocessing Peter Steigenberger Technische Universität München Gerd.
Do Annual Geopotential Variations Affect IGS Products ? J. Ray NOAA/NGS with major help from S. Bettadpur, J. Ries U. Texas/CSR T.-S. Bae Sejong U. X.
PENDING & PROPOSED MODEL CHANGES: SESSION RECOMMENDATIONS IGS core products AC modeling documentation Troposphere modeling Higher-order ionospheric corrections.
PBO Frame Definition using SNARF Version 1.0 Tom Herring MIT.
5/18/2994G21D-04 Spring AGU Realization of a Stable North America Reference Frame Thomas Herring Department of Earth Atmospheric and Planetary, Sciences,
Workshop, Miami, June 2008 IGS Contribution to ITRF Zuheir Altamimi & Xavier Collilieux IGN, France.
Vertical velocities at tide gauges from a completely reprocessed global GPS network of stations: How well do they work? G. Wöppelmann 1, M-N. Bouin 2,
12/12/01Fall AGU Vertical Reference Frames for Sea Level Monitoring Thomas Herring Department of Earth, Atmosphere and Planetary Sciences
Aug 6, 2002APSG Irkutsk Contemporary Horizontal and Vertical Deformation of the Tien Shan Thomas Herring, Bradford H. Hager, Brendan Meade, Massachusetts.
OSTST Meeting, Hobart, Australia, March 12-15, 2007 On the use of temporal gravity field models derived from GRACE for altimeter satellite orbit determination.
1/16 35th IGS Governing Board Meeting December 13, 2009 – San Francisco TRANSITION OF THE IGS REFERENCE FRAME COORDINATION FROM NRCAN TO IGN - STATUS AND.
Importance of SLR in the Determination of the ITRF Zuheir Altamimi IGN, France Geoscience Australia, Canberra, August 29, 2005 SLR Strength: its contribution.
Jason-1 POD reprocessing at CNES Current status and further developments L. Cerri, S. Houry, P. Perrachon, F. Mercier. J.P. Berthias with entries from.
Insensitivity of GNSS to geocenter motion through the network shift approach Paul Rebischung, Zuheir Altamimi, Tim Springer AGU Fall Meeting 2013, San.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Status and Future of the IERS Combination Efforts Markus Rothacher GeoForschungsZentrum.
Astronomical Institute University of Bern 1 Astronomical Institute, University of Bern, Switzerland * now at PosiTim, Germany 5th International GOCE User.
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Strategies for Weekly Routine Generation of Combined IERS Products Markus Rothacher.
Consistency of Crustal Loading Signals Derived from Models & GPS: Inferences for GPS Positioning Errors Quantify error budget for weekly dNEU GPS positions.
Systematic errors in IGS terrestrial frame products Paul Rebischung, Zuheir Altamimi (with contributions from Ralf Schmid, Jim Ray & Wei Chen)
Contemporary Horizontal and Vertical Deformation of the Tien Shan
Reference Frame Representations: The ITRF from the user perspective
How to constrain the origin, orientation and scale
Analysis Center + Reference Frame Working Group
Reference Frame Working Group
ESOC IGS Reprocessing T. Springer, F. Dilssner, E. Schoenemann,
Proposal for long station names in SINEX format Paul Rebischung Unified Analysis Workshop, Paris, July 2017 Good morning. So I’m going to.
Reference Frame Working Group Report
CNES-CLS Dynamical modelling of GPS orbits
Motivation Time Series Analysis Spectra and Results Conclusions
Combination of reprocessed orbit, clock and ERP products
Presentation transcript:

The IGS contribution to ITRF2013 – Preliminary results from the IGS repro2 SINEX combinations Paul Rebischung, Bruno Garayt, Xavier Collilieux, Zuheir Altamimi AGU Fall Meeting 2014, Abstract G11C-07, San Francisco, 15 December

The IGS 2 nd reprocessing (repro2) 2 Re-analysis of GNSS data collected by the IGS network since 1994 using the latest models and methodology –Reduce systematic errors in IGS products –Provide IGS contribution to ITRF2013 Main updates since repro1: –Daily data integrations (instead of weekly) –GLONASS data processed by some ACs –IGb08/igs08.atx framework –IERS2010 Conventions –New yaw attitude models for eclipsing satellites –A priori modeling of Earth radiation pressure and antenna thrust –See details at:

Analysis Center submissions 3 Contributions from 7 operational ACs + 2 TIGA contributions Submitted products include: –Satellite orbits and clocks –Terrestrial frames and EOPs (daily SINEX files)

1 st combinations (1/2) 4 WRMS of station position residuals (i.e., of daily « AC – combined » differences) –Outlying days for several ACs: ongoing re-submissions

1 st combinations (2/2) 5 Smoothed WRMS ULR: –Large systematic errors in East –Issue in sub-network combos –Ongoing re-submissions GRG: –Large systematic errors in Up –Pronounced semi-annual variations in North and Up –Under investigation →2 nd combinations with GRG, ULR & GTZ included for comparison only

MIT seems to dominate in Up (and North). –Because « classical » WRMS are biased in favor of ACs with non-common stations. →Use Sillard (1999)’s unbiased WRMS 2 nd combinations (1/2) 6 Smoothed WRMSSmoothed, unbiased WRMS # stations in AC solutions

GFZ’s North WRMS vs. mean ionosphere TEC: –Error in 2 nd order ionospheric corrections –New products submitted, but still affected by several issues →3 rd combinations with GFZ included for comparison only 2 nd combinations (2/2) 7 Smoothed, unbiased WRMS ― GFZ’s North WRMS ― a + (b x mean_TEC)

3 rd combinations 8 Smoothed, unbiased WRMS Inter-AC agreement after 2004: –Horizontal: ≈ 1 – 1.5 mm –Vertical: ≈ 3 – 4 mm –Comparable to the weekly repro1 results Substantial degradation before 2000 (and 1997) –Much less marked in repro1: 3D RMS of repro1 combination residuals

Spectral analysis Stacked periodograms of station position residuals (computed using stations with > 3000 days of data) EastNorth Up Background: flicker + white noise Spectral peaks at: –Annual period; GPS draconitic harmonics –Fortnightly periods (14.8, 14.2, 13.7 & 13.2 d) –9.1 d (MIT); 8.2 & 7.8 d (COD, ESA, MIT); 7.0 d (MIT); 3.65 & 2.2 d (GRG) 9

Scale 10 AC / ig2 scale offsets ACOffset (mm) Rate (mm/yr) WRMS (mm) cod emr esa jpl mit Inter-AC agreement: 0.3 – 0.5 mm –Scale rate differences < 0.1 mm/yr Combined scale rate wrt IGb08: mm/yr –Contribution to ITRF2013 scale rate? ig2 / IGb08 scale offsets

Origin: Y component AC / ig2 Y origin offsets ACOffset (mm) Rate (mm/yr) WRMS (mm) cod emr esa jpl mit ― ig2 / IGb08 Y origin offsets ― SLR / ITRF2008 Y origin offsets (cf. G11C-08) Inter-AC agreement: ≈ 3 – 5 mm –nearly 10 times larger than for scale Y component of combined origin: –Good agreement in phase with SLR –Annual amplitude slightly over-estimated 11

Origin: X component AC / ig2 X origin offsets ACOffset (mm) Rate (mm/yr) WRMS (mm) cod emr esa jpl mit ― ig2 / IGb08 X origin offsets ― SLR / ITRF2008 X origin offsets (cf. G11C-08) Inter-AC agreement: ≈ 3 – 5 mm –nearly 10 times larger than for scale X component of combined origin: –Annual amplitude under-estimated –Broad spectral peak around 3.12 cpy 12

Origin: Z component AC / ig2 Z origin offsets ACOffset (mm) Rate (mm/yr) WRMS (mm) cod emr esa jpl mit ― ig2 / IGb08 Z origin offsets ― SLR / ITRF2008 Z origin offsets (cf. G11C-08) Inter-AC agreement: ≈ 6 – 9 mm –nearly 20 times larger than for scale Z component of combined origin: –Spoiled by GPS draconitic harmonics –Annual signal out-of-phase with SLR 13

Earth Orientation Parameters 14 AC / ig2 X-pole differences AC / ig2 Y-pole differences AC / ig2 X-pole rate differencesAC / ig2 Y-pole rate differences AC / ig2 LOD differences ACXPO μ as YPO μ as XPOR μ as/d YPOR μ as/d LOD μ s/d cod emr esa jpl mit WRMS of EOP residual time series Inter-AC agreement: ≈ 30 μas; μas/d; μs/d

Summary 15 Station positions: –Post-2004 inter-AC agreement comparable to weekly repro1 results –Substantially worse in early years Scale: –Excellent inter-AC agreement –Contribution to ITRF2013 scale rate? Origin: –No substantial improvement EOPs: –Inter-AC agreement slightly improved compared to repro1

Next steps 16 Expected by end of January 2015: –Re-submissions (COD, GFZ) –Extensions to 2014 (COD, ESA, MIT) Final combined solutions due by end of February 2015 If time allows, study station residual time series: Form long-term cumulative solution –Revised discontinuity list –Modeling of post-seismic deformations ULAB North residuals

Thanks for your attention! 17

Pole coordinates 18 AC / ig2 X-pole differences AC / ig2 Y-pole differences

Pole rates 19 AC / ig2 X-pole rate differences AC / ig2 Y-pole rate differences

Length of day 20 AC / ig2 LOD differences Normalized periodograms

Origin: X component 21 AC / ig2 X origin offsets Normalized periodograms

Origin: Y component 22 AC / ig2 Y origin offsets Normalized periodograms

Origin: Z component 23 AC / ig2 Z origin offsets Normalized periodograms

Annual – East cod emr esa gfz grg jpl mit gtz ulr 24

Annual – North cod emr esa gfz grg jpl mit gtz ulr 25

Annual – Up cod emr esa gfz grg jpl mit gtz ulr 26

Relative formal errors: pole coordinates 27 σ XPO / median(σ sta ) [mas/mm] σ YPO / median(σ sta ) [mas/mm]

Relative formal errors: pole rates & LOD 28 σ XPOR / median(σ sta ) [mas/d/mm] σ YPOR / median(σ sta ) [mas/d/mm] σ LOD / median(σ sta ) [ms/d/mm]

Relative formal errors: geocenter 29 σ XGC / median(σ sta ) [mm/mm] σ YGC / median(σ sta ) [mm/mm] σ ZGC / median(σ sta ) [mm/mm]