Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.

Slides:



Advertisements
Similar presentations
Project Control: Developing the As-Planned S-Curves
Advertisements

MAINTENANCE PLANNING AND SCHEDULING
IX- CONSTRUCTION PLANNING
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
© Tarek Hegazy – 1 Efficient Scheduling of Repetitive Projects Prof. Tarek Hegazy Computer-Aided Construction Project Management,
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
PROJECT MANAGEMENT CPM/PERT V P B Chakravarthi. K Abhijeet Kumar.
Developing a Project Plan
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Planning & Scheduling Systems: From Design to Fabrication.
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
Industrial Facilities Design
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Chapter 5. Methods of estimating times and costs Using Learning curves Types of costs.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Article Title: Optimization model for resource assignment problems of linear construction projects ShuShun Liu & ChangJung Wang, National Yunlin University.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
Projects CHAPTER 10. Learning Objectives 1. Explain what project management is and why it is important. 2. Identify the different ways projects can be.
1 7. R EPETITIVE C ONSTRUCTION Objective: To understand how production and production rates are affected by repetition of tasks, and to learn how to plan.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Project Management: A Managerial Approach
Scheduling CTC-415. Scheduling Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Project Time Con trol. Control = Monitor + Compare + Analysis + Action  Definition: Controlling  Controlling involves making sure that the results achieved.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
Applying Stochastic Linear Scheduling Method to Pipeline Construction
Intended Learning Outcomes Define the principles of Line of Balance Demonstrate the application of LOB Understand the importance of LOB Understand the.
Line Balancing Problem
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Scheduling CTC-415. Short Interval Scheduling Plan & manage day to day activities Focus on individual activities Goal Oriented to get activity done Two.
11/9/2015 9:42 AM 1 Project Time Control. 11/9/2015 9:42 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
PERT and CPM.
12/2/2015 2:45 AM 1 PROJECT TIME PLANNING Process and Bar Chart Technique.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 10 Projects.
Advanced Science and Technology Letters Vol.74 (ASEA 2014), pp Development of Optimization Algorithm for.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation. Characteristics.
SOFTWARE PROJECT MANAGEMENT
3/18/ :47 AM 1 Time-Cost Trade-Off (Time Reduction = Time Compression = Time Shortening)
Production Planning and control – ME 1009 Unit 1 Introduction.
Prof. Shrikant M. Harle.  Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty.
Chapter 16 – Project Management
Chapter 3 Project Management. Chapter 3 Project Management.
Time Planning and Control Time-Scaled Network
Project Management: PERT/CPM
Maintenance Scheduling
Project Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
TOPIC-8A- PROJECT TIME CONTROL
Project Planning and Scheduling
MAINTENANCE PLANNING AND SCHEDULING
ENGINEERING MANAGEMENT (GE 404)
ENGINEERING MANAGEMENT (GE 404)
Time Planning and Control Time-Scaled Network
Lecture 6: Time-Cost Trade-Offs
CEM 510 Construction Planning & Scheduling Dr Almohawis
Introduction to Scheduling Chapter 1
Project Planning By Phaik San Liew.
PRODUCTION SCHEDULING
LINEAR BALANCE METHOD & MATRIX SCHEDULE
CHAPTER ONE: RESOURCE ALLOCATION AND SCHEDULING
Copyright ©2016 Cengage Learning. All Rights Reserved
Scheduling.
Presentation transcript:

Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.

Characteristics Shows repetitive nature of the construction. Progression of work can be seen easily. Sequence of different work activities can be easily understood. Have fairly high level of detail. Can be developed and prepared in a shorter time period than other formats.

Advantages of LSM Provides more information concerning the planned method of const. than a bar chart. In certain types of projects, LSM offers some advantages over the network approach.

Line of Balance Technique LSM has relationships to the line of balance (LOB) technique, developed by US. Navy in the early 1950s. First applied to industrial manufacturing and production control.

Three diagrams are used in LOB: 1. Production Diagram Shows the relationships of the assembly operations for a single unit. Similar to AOA, except that it shows only one unit of production. 2. Objective Diagram Used to plot the planned or actual number of units produced vs. time. LSM diagram resembles this diagram. 3. Progress Diagram Shows the number of units for which each of the subassembly operations has been completed.

Difference between Objective Diagram and LSM : O.D. is used to schedule or record the cumulative events of unit completion. LSM is used to plan or record progress on multiple activities that are moving continuously in sequence along the length of a single project.

Implementation of LSM Can be used to continuous activities rather than discrete activities. Transportation projects; highway const., highway resurfacing and maintenance, airport runway const. and resurfacing, tunnels, mass transit systems, pipelines, railroads. High-rise building construction Repetitive building units

Elements of the LSM Axis Parameters Location Measure of progress. In high-rises and housing const., measures may be stories, floors, subdivisions, apartments, housing units In Transportation projects, distance (ft. or mile can be used, but division by stations (100ft.) is common) is general.

Time Hours, days, week, or month - depends on the total project time and level of detail desired in the schedule. Preferable to prepare the schedule based on working days and convert to calendar days only at the end.

Activity Production Rates Obtained by the usual estimating methods as a function of the activity, equip. characteristics, labor, and job conditions. The initial rate should be associated with the min. direct cost of accomplishing the single activity.

Activity Interruption and Restraint Prod. rate may vary with locations or time periods. Progress may be interrupted intentionally and restraints may occur between activities due to limited equip. or crews.

Buffers When const. activities progress continuously in a chain, some spacing between activities is required. This spacing serves as a buffer and may be required distance or time interval between activities.

Activity Intervals Used to describe the period of time between the start and finish of an activity at a particular location. Intervals can be indicated by broad line, two narrow lines, etc. Monitoring Progress Working or calendar can be marked with a moving symbol or a line, tape, etc. vertically across the diagram. Progress on individual activities would be marked by location rather than time.

1. Project Time Optimization The total project time may be such that indirect costs and liquidated damages assessed are more costly than the expense of accelerating certain activities. Cost-duration analysis can be used to minimize the total cost, as follows :

a) Identify all activities that can be accelerated or decelerated. b) Among the above, consider only those that are at a buffer limitation at both the start and the finish of the activity. c) Of these, select the one activity with the lowest cost slope associated with acceleration (or deceleration). d) Accelerate (or deceleration) the activity rate of production the maximum feasible amount. e) Repeat the above steps successively until the optimum project cost and associated duration is obtained.

2. Discrete Activities Discrete are best scheduled by other methods. Once the duration is determined by network analysis, it can be scheduled on the LSM diagram and coordinated with the linear activities. 3. Seasonal Adjustments When developing LSM, appropriate adjustments can be made for seasonal effect on construction progress.

4. Project Progress and Resource Management Project progress is often estimated by the S- curve when bar chart development. In LSM, the determination of activity progress is facilitated and made more rigorous.