1 More Standard Costing & Variance Analysis Week 10.

Slides:



Advertisements
Similar presentations
3 hr 5 hr 8 hr Hours worked Charge
Advertisements

Welcome to Who Wants to be a Millionaire
Flexible Budgets and Standard Costs
14-1 Chapter 14 Risk and Managerial (Real) Options in Capital Budgeting © Pearson Education Limited 2004 Fundamentals of Financial Management, 12/e Created.
Fill in missing numbers or operations
Ozone Level ppb (parts per billion)
Flexible Budgets and Overhead Analysis
Flexible Budgets, Variances, and Management Control: II
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Chapter 8 Markups and Markdowns: Perishables and Breakeven Analysis.
1 1  1 =.
1  1 =.
Partial Products for Multiplication
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
1 Standard Costing & Variance Analysis Week 9. 2 Managing Production Control of Costs within manufacturing is vital To keep product costs to a minimum.
1 Intro to Financial Management of the Organisation Week 12 WACC & Revision.
1 More Standard Costing & Variance Analysis Week 10.
Absorption Costing and Activity Based Costing
Who Wants To Be A Millionaire?
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Welcome to Who Wants to be a Millionaire
Welcome to Who Wants to be a Millionaire
1 s Share 2 s Share 3 s Share settles with 1 for $200,000 (the limit of 1 s insurance policy) settles with 1 for $700,000 Fault allocation: =0%, 1 =50%,
Case Study.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Introduction to Cost Behavior and Cost-Volume Relationships
Fixed and Variable Costs. Median income per household member in the U.S. in 2006 was in the range from: 1)$15,000-20,000 2)$20,000-25,000 3)$25,000-30,000.
Budgeting and Variances
PERCENT OF INCREASE OR DECREASE
7 - 1 ©2003 Prentice Hall Business Publishing, Cost Accounting 11/e, Horngren/Datar/Foster Flexible Budgets, Variances, and Management Control: I Chapter.
Flexible Budgets, Variances, and Management Control:II
Cost-Volume-Profit Relationships
Money Math Review.
Managing Capacity.
2009 Foster School of Business Cost Accounting L.DuCharme 1 Inventory Costing and Capacity Analysis Chapter 9.
Capacity Planning For Products and Services
Capacity and Constraint Management
© 2012 Pearson Prentice Hall. All rights reserved.
Area of triangles.
Slide 1 Notebook Friday, 22 August 2014Registration Respect yourself - Respect each other - Respect the environment Starter How many words can you find.
Making Landmark or Friendly Numbers (Multiplication)
Cost-Volume-Profit Analysis
Subtraction: Adding UP
Equal or Not. Equal or Not
Slippery Slope
Look at these sequences. What is happening? 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 10, 20, 30, 40, 50, 60, 70, 80, 90, , 200, 300, 400, 500, 600, 700, 800,
Week 1.
Number bonds to 10,
Beat the Computer Drill Divide 10s Becky Afghani, LBUSD Math Curriculum Office, 2004 Vertical Format.
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
Let’s take a 15 minute break Please be back on time.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Chapter 11 Flexible Budgeting and the Management of Overhead and Support Activity Costs.
LONG-RUN, SHORT-RUN AND DIMINISHING RETURNS Chapter 20 Presentation 2.
X-box Factoring. X- Box 3-9 Product Sum Factor the x-box way Example: Factor 3x 2 -13x (3)(-10)= x 2x 3x 2 x-5 3x +2.
Cost-Revenue Analysis for Decision Making
Copyright © 2003 Pearson Education Canada Inc. Slide 7-91 Chapter 8 Flexible Budgets, Variances, and Management Control: II.
Part 1 Study Unit 7 Review Jim Clemons, CMA.
Flexible Budgets Static Budget Based on estimate of sales and production levels Compare costs associated with actual production to costs for budgeted production.
Chapter 17 Overhead Cost Management Flexible Budgets.
F2:Management Accounting. Designed to give you knowledge and application of: Section E: Budgeting & standard costing E2. Functional budgets E4. Basic.
Production Cost Variance Analysis
8 Chapter Variance analysis.
Presentation transcript:

1 More Standard Costing & Variance Analysis Week 10

2 Fixed Overhead Variances With Fixed Overheads we use BUDGETED fixed overheads Fixed Overheads are absorbed into units of output Total variance : Difference between actual fixed oh and absorbed fixed oh (ie under- or over- absorbed fixed oh) Expenditure variance : difference between budgeted fixed oh and actual fixed oh Volume variance : difference between budgeted production volume and actual production volume X std absorption rate per UNIT

3 Fixed Overhead Variances Scenario Product X Budgeted output = 1,000 Std time to produce a unit = 2 hours Budgeted fixed oh (FO) = £20,000 Therefore: fixed oh absorption rate (FOAR) per unit = 20,000 = £20 1,000

4 Fixed Overhead Variances Scenario Actual Data Fixed Overhead = £20,450 Actual Output = 1,100 units Actual hours worked = 2,300

5 Total Variance Actual fixed oh = 20,450 Absorbed fixed oh (1,100 units X FOAR £20) =22,000 Variance 1,550 (F) (ie £1,550 of fixed oh OVERabsorbed)

6 Expenditure Variance (this is the easy one) Budgeted fixed oh = 20,000 Actual fixed oh =20,450 Variance 450 (A)

7 Volume Variance (Budgeted output – Act output) X FOAR (1,000 – 1,100) X 20 = 2,000 (F) Summary Expenditure 450 (A) Volume2,000 (F) Total1,550 (F) BUT……..

8 Fixed Overhead Volume Variance – Sub Variances Volume Variance can be split into Efficiency variance Capacity variance We have FOAR per UNIT, need to calculate FOAR per HOUR FOAR per hour = Budgeted Fixed OH Budgeted hours (1,000 X2) = 20,000/2,000 = £10

9 Fixed Overhead Volume Variance – Sub Variances Efficiency (Std hrs – Act hrs) X FOAR per hr = (2,200 – 2,300) X 10 = 1,000 (A) Capacity (Budgeted hrs – Actual hrs) X FOAR = (2,000 – 2,300) X 10 = 3,000 (F) Volume 2,000 (F)

10 Fixed Overhead Volume Variance – Sub Variances NOTES Notes 1 Std hrs : Std time per unit = 2 hrs 1,100 units actually made Therefore Std hrs = 2 X 1,100 = 2,200 Notes 2 Budgeted hours = capacity Here 2,000 hrs were budgeted for but actual hours exceeded that so effectively exceeded capacity

11 Back to Acme Blocks Fixed & Variable overheads Budgeted production = 1,000 units (blocks) Budgeted fixed oheads = £0.30 per unit Budgeted variable oheads = £0.10 per unit Budgeted fixed oh absorption rate (hourly) 50 £6.00 per hour = 300 Budgeted variable oh absorption rate (hourly) 50 £2.00 per hour = 100

12 Acme Blocks – Actual Data Fixed overheads 68 £6.20 = £ Variable overheads 68 £1.80 = £ Note 10 hours idle

13 Acme Block - Analysis Total Variance 1,200 units should cost (1,200 X 10p) = Actual cost = Variance 2.40 (A)

14 Sub Variances Expenditure variance Productive hours (68-10) = hrs should incur (58 X 2) = Actual overheads = Variance 6.40 (A) Efficiency Variance (Std hrs – Productive hrs) X VOAR If 1,000 units budgeted to take 50 hrs, Then 1,200 units should take 60 hrs (60 – 58) X 2 = 4.00 (F) Summary 6.40 (A) (F) = 2.40 (A)