Supported by Legal disclaimer: The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of.

Slides:



Advertisements
Similar presentations
Energy Savings from Intelligent Metering and Behavioural Change Intelligent Metering EIE/04/107/SO January December 2006.
Advertisements

Legal disclaimer: The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the European.
Supported by Legal disclaimer: The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of.
Legal disclaimer: The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the European.
Project Outputs and Opportunities for Future Involvement Professor Clive Roberts Director of Railway Research University of Birmingham.
Why the Covenant of Mayors? 75% of European population live in urban areas 80% of energy consumption and CO 2 emissions come from cities 1.9% is the growth.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
EU-wide establishment of enduring national and European support networks for sustainable urban mobility Contract Number: IEE/12/698/SI Duration:
This project is funded with support from the European Commission " Legal disclaimer: the contents of this material is the sole responsibility of implementing.
1 eBRIDGE: empowering e-fleets for business and private purposes in cities The sole responsibility for the content of this publication lies with the authors.
Project duration: 36 monthsAugust 2009 Project supported by the „Intelligent Energy Europe“- Programme of the European Community
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
You are a Smart Consumer USmartConsumer Contract number: 13/590/SI Project duration: 36 months (03/ /2017) Last modified:
The sole responsibility for the content of this presentation lies with the Clean Fleets project. It does not necessarily reflect the opinion of the European.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
The sole responsibility for the content of this document lies with the authors. It does not necessarily reflect the opinion of the European Union. The.
DEEP – Dissemination of Energy Efficiency Measures in the Public Building Sector (EC DG TREN, ) LIFE CYCLE COSTING A Tool for Energy Efficient.
1 M ESH PROJECT : P RODUCTION OF A M ANUAL FOR S TATISTICS ON E NERGY C ONSUMPTION IN H OUSEHOLDS Developing energy consumption data to meet users needs.
Main Objective The main objective of ACTIVE ACCESS is to increase the use of cycling but especially walking for short everyday trips.
European Quality in Individualized Pathways in Education.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP6 Communication and dissemination 10-11/07/2012COGEN Europe.
Tailored training for professionals in the rural tourist sector-FORESTUR” ES/06/B/F/PP Budapest, June 2006.
Energy-Efficiency-Watch (EEW) - Basics on the project – Dr. Jan Geiss Secretary General EUFORES Coordinator of the EEW SpanishWorkshop In cooperation with.
ECOMOBILITY SCHEME TO INCENTIVIZE ENERGY-EFFICIENT TRANSPORT ECOMOBILITY SHIFT IEE/09/924/SI – ECOMOBILITY SHIFT –
IEE/10/SI May May 2014 (36 Months) The sole responsibility for the content of this publication lies with the authors. It does not necessarily.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
Social capital development as a tool of youth civic participation in Eastern Europe countries Riga, 30 of March, 2015 Project Social capital development.
Project duration: 36 months ( – ) Contract number: IEE/12/738/SI
TCA VENet | evaluation Dietmar Paier Center for Education and Economy, Research & Consulting Graz, Austria 3rd project meeting , Werl.
Iulia Degeratu Ministry of Environment and Forests TESTING INDUSTRIAL SYMBIOSIS APPROACH IN ROMANIA.
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
The sole responsibility for the content of this presentation lies with the authors. It does not necessarily reflect the opinion of the European Communities.
STEER – A Recipe for Sustainability Brussels 1-2 July 2014 V. Argyraki Project Officer, EASME, Unit B1 Managenergy event for STEER projects.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
Mr William Gillett European Commission Head of Unit, Intelligent Energy Executive Agency (IEEA) From Policy to Action “Supporting the development of CHP.
6-7 / 3 /2006 INSEAD Campus - Fontainebleau WP5: Exploitation and Dissemination General approach and scheduling on deliverable: D5.1 Dissemination and.
Introduction of the ‘SDI-EDU for regional and urban planning‘ project Karel JANECKA 1 1 University of West Bohemia, Faculty of Applied Sciences Department.
ENABLE Building capacity in renewables in the health, education and water sectors to help meet poverty reduction targets in sub-Saharan Africa January.
CAST Project funded by the European Commission, Directorate-General Energy & Transport, under the 6th RTD Framework Programme.
Supported by The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the Community. The.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
ESSnet Workshop Cologne 2011 ESSnet on measuring global value chains.
This project has been funded with support from the European Commission. This publication [communication] reflects the views only of the author, and the.
Covenant of Mayors A commitment towards Europe’s energy and climate policy Meeting of the AER working group on energy and climate change, Brussels, 12.
United Nations Economic Commission for Europe Statistical Division Data Initiatives: The UNECE Gender Database and Website Victoria Velkoff On behalf of.
The industrial relations in the Commerce sector EU Social dialogue: education, training and skill needs Ilaria Savoini Riga, 9 May 2012.
Supporting Development of Photovoltaics in the European Union New Member States Network IEE/07/809/SI Duration: Oct – Sept Coordinator:
Antonio Mocci Mestre, January 17, 2011 Lead partner: Governance of the project monitoring, evaluation and dissemination systems.
United Nations Economic Commission for Europe Statistical Division Knowledge Management and Information Sharing: The Structure of UNECE’s work on Gender.
Impact assessment and evaluation of ERA-NET effectiveness Juliana Zweifel, Bert Beck, Katrien Broekaert, Iver Thysen, Agris Nikitenko, Markus Loetscher.
Empowerment of practitioners to achieve energy savings in urban transport Empowerment of practitioners to achieve energy savings in urban transport IEE/10/274/SI ,
SMARTSET Sustainable MARketdriven Terminal Solutions for Efficient freight Transport Contract Nr: IEE/12/714/SI Duration:
EUNetPaS is a project supported by a grant from the EAHC. The sole responsibility for the content of this presentation lies with the author(s). The EAHC.
HNSciCloud Project MSc in Project Engineering delivered by Professor Gilles Vallet Oxford Academics for Computing Science Department, University of Chester.
SEGmented Marketing for ENergy efficient Transport SEGMENT SEGmented Marketing for ENergy efficient Transport IEE/09/ SEGMENT: 19-Apr-10 to 18-Apr-13.
Contract N°: IEE/10/280/SI Duration: June, 1° 2011 – May, 31° 2014 Slides date: 31/05/14 Solar Thermal in major renovations and protected urban.
Community for Risk Management & Assessment Kick-off January 20 th Brussels N. van Os Veiligheids Regio Zuid-Holland Zuid (Safety Region South-Holland South)
ERA-PLANET KoM, Brussels February 2016 WP4- Follow-up and monitoring of projects Dr. Joan Masó Center of Research in Ecology and Forestry Application.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Co-funded by the European Union Ref. number: LLP FI-ERASMUS-ENW OI-Net The European Academic Network for Open Innovation ,
Total Resource and Energy Efficiency Management System for Process Industries The sole responsibility for the content of this document lies with the authors.
OPTIMALE OPTIMALE Optimising professional translator training in a multilingual Europe
CIVINET UK, Ireland and beyond!
First Partners’ Meeting
Developing energy consumption data to meet users needs
Civil Protection Financial Instrument – Prevention Projects
TRAILBLAZER Transport and Innovation Logistics by Local Authorities with a Zest for Efficiency and Realization 1 July 2010 – 31 June 2013 „The sole responsibility.
for sustainable urban mobility Contract Number: IEE/12/698/SI
SenGoR - Seniors Go Rural
Assessment of Reporting on Competent Authorities
Presentation transcript:

supported by Legal disclaimer: The sole responsibility for the content of this presentation lies with the authors. It does not represent the opinion of the European Communities. The European Commission is not responsible for any use that may be made of the information contained therein. Sustaining impacts beyond project life : ENERQI - STEER Workshop – Brussels the 1st July Energy efficiency by using daily customer's quality observations to improve public transport

Summary of Enerqi project 1.A common methodology => measure the quality of PT services perceived by users. 2.With a common tool => online platform to … manage the relationship with volunteers (information and incentive), use data from the questionnaires filled out (reporting and analysis). Main objectives Improve the attractiveness of PT services, to increase the use of PT and so reduce the consumption of energy.

Main outputs and outcomes  Main experience from the Netherlands (Brabant)  Several deliverables : states of art (WP2), methodology (WP3), tool and process (WP4), models for dissemination (WP6), … Available on Enerqi’s website : Expected quality of service Perceived quality of service Delivered quality of service Desired quality of service SatisfactionPerformance  New activities New quality monitoring, new survey’s activity for certain partners, For Tisséo : complete the circle of quality measurement.

After the project … Keep the best !!! … and integrate it to the quality process of Tisséo. Methodology / Process It’s a good way to improve the quality of service, provided we have available resources (material, human, financial) Tool / Platform Functionalities of the tool aren’t enough for Tisséo needs (management of observers, survey building,…)

Coordinator (1): DTV Consultants (NL) Partners (12): CARRIS (PT)POLIS (BE) CRES (GR)STP, Alba Iulia (Ro) Agency de l’Energie de Plovdiv-EAP (BG) TIS (PT) FGM-AMOR (AT)TISSEO (FR) Graz Linien (AT)TISSEO-SMTC (FR) Lancashire County Council LCC (UK) URTP (Ro) 8 demonstrators Lisbonne (CARRIS) Athènes (CRES) Plovdiv (EAP) Graz (Graz linien) Lancashire County (LCC, Transdev) Alba Iulia (STP) Toulouse (TISSEO) Brabant (Veolia, Arriva) Consortium

Key points ! 1.Be clear about the local needs, the objectives Even if it’s an European project, the aim is to apply it in local way. Tisséo case Online relationship: the most efficient way to exchange with Toulouse’s citizen ( ing used to recruit volunteers and online survey) Incentive : gift voucher (every 3 months) and annual lottery permit to maintain a high level of response and a good fidelity

Key points ! 2.Subcontractor : only on tasks that don’t impact on the other partners of the consortium. Tisséo case Delays in all the project because of Tisséo difficulties with his subcontractor (writing the common methodology)

Key points ! 3.Have available resources to continue after the project Materials, humans, financial, subcontractors, … Is that always possible without European subvention ? Tisséo case During the project : 1 full-time person + Enerqi tool + subcontractor (nearly 40,000€/year) Transitional step : 1.5 full-time persons + subcontractor (nearly 55,000€/year) And now : 1 full-time persons + new subcontractor (nearly 45,000€/year)

Operator of public transport of Toulouse Marie Fourcade, Marketing Manager Thank you for your attention