One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for.

Slides:



Advertisements
Similar presentations
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Advertisements

Presentation to Orleans Levee District Lake Pontchartrain And Vicinity Levees LPV September 2006 Presentation to Orleans Levee District Lake.
Permanent Protection System Opinion of Probable Cost May 2010 Courtesy USACE Photograph Courtesy USACE.
Fort Bend Flood Management Association Flood Risk Reduction Symposium October 3rd, 2014 (Part-A) Brazos River at San Felipe - USGS Gage Fort Bend County.
US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
CPRA Board Meeting, Baton Rouge, LA May 15, 2013 Coastal Protection and Restoration Authority.
HSDRRS Wave Overtopping Risk Reduction for Return Events Greater than 100 yr. By: John Monzon, P.E. Flood Protection Division Chief and Rickey Brouillette,
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
New Orleans Levee Failure Physical Modeling Mateo Arimany Albert Bleakley February 2010.
Before Katrina, you had a 1% chance every year of flooding this deep from Hurricanes Notes: The depth map tool is a relative indicator of progress, over.
Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection Project, TAMUG Bill Merrell, George.
US Army Corps of Engineers BUILDING STRONG ® LOUISIANA COASTAL AREA (LCA) PROGRAM UPDATE June 16, 2010 Presented by: Bren Haase, OCPR Mark Wingate, USACE.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
New Orleans’ Levee Failures Chalston Layacan Elizabeth Lenker Jamie Mellies.
BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® Support to Gulf Coast Recovery U.S. Army Engineer Research and Development Center Coastal.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
US Army Corps of Engineers BUILDING STRONG ®. Slide 2.
US Army Corps of Engineers BUILDING STRONG ® West Onslow Beach/ Topsail Beach West Onslow Beach/ Topsail Beach Coastal Storm Damage Reduction Project Town.
Mid-Barataria Diversion - Status Update committed to our coast Andrew Beall Project Manager Governor’s Advisory Commission Meeting December 5, 2012.
“Closing” the Mississippi River Gulf Outlet (MRGO): Environmental and Economic Implications Coastal Wetland Planning, Preservation, and Restoration Act.
TROPICAL STORM LEE September 1-6 After Action Report.
Scientists versus the local community: A case study in post-Katrina New Orleans Amy E. Lesen, Ph.D. Dillard University, New Orleans, LA and Pratt Institute,
North Metro Rail Line FasTracks Citizens Advisory Committee September 18, 2013.
University of North Texas Libraries U.S. Army Corps of Engineers, Map of USACE Engineer Divisions and Districts.
BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Lake Pontchartrain & Vicinity LPV- 03.2B, West Return Floodwall,
US Army Corps of Engineers BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System CPRA Team New Orleans 17 May 11.
April, 2008 Office of Coastal Restoration & Management PROJECT UPDATE Office of Coastal Restoration & Management PROJECT UPDATE.
History Established in 1909
US Army Corps of Engineers BUILDING STRONG ® Kansas Citys, Missouri and Kansas Flood Risk Management Project Presentation to Kansas City Industrial Council.
US Army Corps of Engineers BUILDING STRONG ® Prioritizing Investments within the USACE Levee Safety Program Process and Methodology Overview Jason Needham,
Savannah Harbor Expansion Project
Greater New Orleans Area Hurricane & Storm Damage Risk Reduction System Smart Rivers Conference, Opening Plenary Session Col. Edward Fleming Commander,
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
DRAFT CORPS OF ENGINEERS CONTRACTS: Louisiana Coastal Area, Mississippi River Gulf Outlet, and Lake Pontchartrain & Vicinity Presented to the Coastal Protection.
US Army Corps of Engineers BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Armoring Brief Team New Orleans U.S.
North Metro Rail Line Request for Proposals (RFP) Commerce City Council August 19, 2013.
By: Rahel Samarakkody Hurricane Katrina Basic Facts Homes and People How Hurricane Katrina Effected the people The Wellington Avalanche Homes and People.
US Army Corps of Engineers BUILDING STRONG ® The Nature Conservancy’s Climate, Risk & Resilience 2013 Learning Exchange Col. Richard Hansen U.S. Army Corps.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
Earthquake Recovery Programme Pre-Synod Archdeaconry Meetings June – August 2015.
SOUTHWEST COASTAL AND SOUTH CENTRAL PROJECTS – Update and Path Forward CPRA Meeting January 22, 2013 committed to our coast.
CPRA UNO Meeting August 13, urplus Funds 2008 $300 Million Surplus Funds Act 3 of the nd Extraordinary Legislative Session provides for:
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers 1 Coastal Protection and Restoration Advisory Committee 3 April 2006 D
05C112011B Template Master – Update Tracking Number and Date Information Here Update tracking number and date on this slide Template Master – Update Tracking.
Presentation to the Little Rock SAME Small Business Symposium by LTC Mark Jernigan Deputy Commander, New Orleans District April 28, 2009 Presentation to.
1 An Approach to Levee Assessment and Contingency Planning Presentation to the National Waterways Conference 7 September 2006 Portland, Oregon By Rob Vining.
New Orleans Hurricane Protection System Overview by Mike Park HPS Program Manager Task Force Hope U.S. Army Corps of Engineers March 19, 2008.
US Army Corps of Engineers BUILDING STRONG ® U.S. Army Corps of Engineers New Orleans District 75 th Annual Association of Levee Boards of Louisiana COL.
Fiscal Year 2009 Annual Plan: Ecosystem Restoration and Hurricane Protection in Coastal Louisiana Draft.
Implementing the Master Plan Kyle Graham Deputy Executive Director CPRA June 20, 2012 committed to our coast.
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
US Army Corps of Engineers BUILDING STRONG ® Walla Walla District Update LTC Timothy Vail Oct 15, 2014.
US Army Corps of Engineers BUILDING STRONG ® USACE Hurricane Preparedness Victor A. Landry III Operations Manager, GIWW USACE, New Orleans District 20.
Donaldsonville, LA to the Gulf of Mexico Feasibility Study.
US Army Corps of Engineers BUILDING STRONG ® Name of Levee Segment Presenter Name Presenter Title Duty Location Date of Presentation.
Donaldsonville, LA to the Gulf of Mexico Feasibility Study.
I-225 Rail Line Chuck Culig, Project Manager Tuesday, April 2, 2013 RTD Board of Directors Update.
US Army Corps of Engineers BUILDING STRONG ® Inner Harbor Navigation Canal Lock 2016 Dewatering Marine Industry Day USACE - New Orleans District 20 May.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Comite River Diversion Project Status Update November 7, 2018 Bobby Duplantier, USACE Patrick Landry, DOTD.
25th Avenue Grade Separation
25th Avenue Grade Separation
Fab-Five Projects New Orleans FY19-FY23
US Army Corps of Engineers Civil Works Audit: Journey to an Opinion Briefing for: ASMC PDI National Capital Region March 6, 2008.
Challenges and Opportunities in Addressing Climate Change
Presentation transcript:

One Team: Relevant, Ready, Responsive, Reliable 1 MRGO Closure Status Next Steps & Status USACE & State negotiate and sign MOA Plans & Specifications for Closure Structure at Bayou La Loutre are Complete Repair IHNC Lock –Baptiste Collette is being dredged – est. completion by 30 June –IHNC Lock is scheduled to be de-watered Aug 1 – Oct 1, 2008 –MRGO will not be physically closed until the IHNC Lock is operable IHNC contingency working group –Navigation stakeholders and District Operations staff establishing contingency plans for service interruptions at IHNC Lock Complete Environmental Clearance for Closure Structure –Record of Decision on LEIS is ready for signature by the Assistant Secretary of the Army for Civil Works Construct the closure structure –Target contract award late summer 2008 –Target completion by June 1, 2009

New Orleans Hurricane Storm Damage Risk Reduction System Overview by Mike Park HSDRRS Program Manager Task Force Hope U.S. Army Corps of Engineers May 21, 2008

One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers ® 3 Agenda HSDRRS: State of the System Construction Status 2008 Hurricane Season System Improvements HSDRRS: State of the System Construction Status 2008 Hurricane Season System Improvements

One Team: Relevant, Ready, Responsive, Reliable Legend Federal Federal Non-COE Non-Federal 5 Parishes 350 Miles of Levee/Floodwall 68 Pumping Stations (Fed & Non-Fed) 4 Gated Outlets New Orleans Area Hurricane Storm Damage Risk Reduction System

One Team: Relevant, Ready, Responsive, Reliable 5 State of the System NOLA storm surge protection exceeds pre-Katrina levels; area has better protection than ever before.NOLA storm surge protection exceeds pre-Katrina levels; area has better protection than ever before. The Corps has made significant progress and continues to work to meet our 2011 goal for 100-year level of protectionThe Corps has made significant progress and continues to work to meet our 2011 goal for 100-year level of protection Corps awarded largest civil works design-build contract in Corps history on April 3, 2008 ($700M)Corps awarded largest civil works design-build contract in Corps history on April 3, 2008 ($700M) Funding StatusFunding Status –$7.1 B appropriated to date; FY 2009 budget requests additional $5.7 B which includes funds to reach 100-year level of protection –Total federal commitment of $12.8 B

One Team: Relevant, Ready, Responsive, Reliable US Army Corps of Engineers ® 6 Construction Status Total expected construction contracts: ~325 Awarded 150+ construction contracts for $2.1B Overall Program Estimate: ~$14.6B 47 construction contracts worth $1.4B ongoing 2008 and Beyond 2008 – Anticipate awarding about 40+ contracts for around $2B Awarded IHNC Surge Protection w/Advance Measures Award 30+ contracts for Levees, Floodwalls and Armoring Award 3 contracts for pump station repairs Award 3 contracts for SELA (interior drainage) Total expected construction contracts: ~325 Awarded 150+ construction contracts for $2.1B Overall Program Estimate: ~$14.6B 47 construction contracts worth $1.4B ongoing 2008 and Beyond 2008 – Anticipate awarding about 40+ contracts for around $2B Awarded IHNC Surge Protection w/Advance Measures Award 30+ contracts for Levees, Floodwalls and Armoring Award 3 contracts for pump station repairs Award 3 contracts for SELA (interior drainage)

One Team: Relevant, Ready, Responsive, Reliable 7 IHNC Surge Protection Objectives: Provide protection to New Orleans East / New Orleans Metro / IHNC-MRGO / St. Bernard area.Provide protection to New Orleans East / New Orleans Metro / IHNC-MRGO / St. Bernard area. Complete protection by 2011 with advanced measures (risk reduction) by June 2009Complete protection by 2011 with advanced measures (risk reduction) by June 2009Status Awarded 3 APR 08 a design-build contract to Shaw E&I for $695M – largest in Corps historyAwarded 3 APR 08 a design-build contract to Shaw E&I for $695M – largest in Corps history Formal partnering sessions APR 08Formal partnering sessions APR 08 Wide stakeholder engagementWide stakeholder engagement Environmental Compliance process ongoing, completes in July 2008Environmental Compliance process ongoing, completes in July 2008 Scheduled to begin construction late summer 2008Scheduled to begin construction late summer 2008 conceptual rendition

One Team: Relevant, Ready, Responsive, Reliable Hurricane Season System Improvements Outfall Canal Closures – Pumping capacity raised to 16,000 cfsOutfall Canal Closures – Pumping capacity raised to 16,000 cfs London Ave. Canal – Load Test enabled raising SWE to 5 ft., increasing carrying capacity by 30%London Ave. Canal – Load Test enabled raising SWE to 5 ft., increasing carrying capacity by 30% Levee raising projects underway around the system; St. Charles, Jefferson, Orleans, St. Bernard and Plaquemines Parishes.Levee raising projects underway around the system; St. Charles, Jefferson, Orleans, St. Bernard and Plaquemines Parishes. Floodwall construction and stabilization – New floodwalls under construction to 100-year standards. Interim measures applied to stabilize and strengthen existing I-walls.Floodwall construction and stabilization – New floodwalls under construction to 100-year standards. Interim measures applied to stabilize and strengthen existing I-walls.

One Team: Relevant, Ready, Responsive, Reliable Hurricane Season System Improvements Strengthened transitions and armored floodwallsStrengthened transitions and armored floodwalls Grass along MRGO to prevent erosionGrass along MRGO to prevent erosion Repairing non-federal pump stations (18 complete, 7 in construction and 5 in design)Repairing non-federal pump stations (18 complete, 7 in construction and 5 in design) Storm proofing 32 existing interior drainage pump stations in Jefferson and Orleans ParishesStorm proofing 32 existing interior drainage pump stations in Jefferson and Orleans Parishes 5 Safe houses in Jefferson Parish5 Safe houses in Jefferson Parish

One Team: Relevant, Ready, Responsive, Reliable 10 Harvey Canal Floodwall Jan 2008 Mar 2008

One Team: Relevant, Ready, Responsive, Reliable 11 St. Bernard Levee Work Verret to Caernarvon

One Team: Relevant, Ready, Responsive, Reliable 12 Bayou Segnette Pump Station Completed Safe House Dec 2006

One Team: Relevant, Ready, Responsive, Reliable 13 Where Are We Now?

One Team: Relevant, Ready, Responsive, Reliable 14 Questions? You can access the Task Force Hope Newsletter here: hps/Status_Report_archive.htm hps/Status_Report_archive.htm You can assess your risk as of 1 June 2007 at: You can assess your risk as of 1 June 2011 at: hps/100maps.htm hps/100maps.htm

New Orleans Hurricane Storm Damage Risk Reduction System Overview by Mike Park Program Manager Task Force Hope U.S. Army Corps of Engineers May 21, 2008