DCS - general Unscheduled power cut Wed. morning (08.02.2012, human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.

Slides:



Advertisements
Similar presentations
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 The TRD Ethernet network at Point 2 David Emschermann Physikalisches Institut Universität Heidelberg.
Advertisements

AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
EMCal DCS and related Issues with Shutdown/Installation B. S. Nilsen M. Cherney J. Fujita.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
FF - August 30th 2004 Meeting ALICE radiation tolerance. Some reasons for this meeting: A part very inner detectors (Pixels and SDD), ALICE has wide grey.
TC meeting P2 planning wks 7&8 A.Tauro
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 CTP offline software status (Offline week) A.Jusko and R.Lietava.
1 Responsibilities & Planning DCS WS L.Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Muon System Safety Issues Burkhard Schmidt.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
V4-20-Release P. Hristov 08/08/ Changes: v4-20-Rev-38 #85151 Memory leak in T0 DQM agent. From rev #85276 AliGRPPreprocessor.cxx: Port to.
3D Workshop Outline & Goals Dirk Düllmann, CERN IT More details at
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
Mario Sitta 1 CERN – Mon. 7 Jul., 2008 Status of ITS v11Hybrid geometry Mario Sitta Univ. Piemonte Orient. & INFN Alessandria.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
1 Status of the CSC system M. Ignatenko (UCLA) CSC Operation and DPG meeting CERN January 18, 2012.
ALICE TC Meeting – CV Detcool1 LHC stop 31 May, 1-2 June – CV/DETCOOL Interventions Cavern interventions: 31 9:15: Sampling with RP.
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
P. Kuijer1 System run coordinator meeting
(Alice COsmic Ray Detector) Status Report
V4-18-Release P. Hristov 21/06/2010.
Calibration: preparation for pa
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
TS2 preparatory meeting
Production status – christmas processing
ALICE Status 4th CERN-Korea meeting
v4-18-Release: really the last revision!
ITS Cooling: Xmas Plan Claudio Bortolin.
Experience between AMORE/Offline and sub-systems
Corr framework Computing in High Energy and Nuclear Physics
November technical stop activities:
Presentation transcript:

DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had to start again. OK on Thursday. 48V consolidation tests on Fri –Switch off all DCS (timing to be defined) –Detector equipment (including gas and cooling) shall be in a state to support power interruptions –Restart DCS in the afternoon: only new DCS cluster, except agreed exceptions. –Some ‘restart issues’ might persist over the weekend (not all experts are available on Friday) 14/2/12TC meeting - A.Augustinus1

DCS – migration status Phase II (all SW upgrades completed on old HW) –All done except for: AD0, PHS, SPD, SDD, MCH-GMS, LHC I/F All systems have been allocated new hardware Migration to new hardware –See table ( Done - Ongoing - Not started ) Remarks –SPD will start ‘after drilling’ –SDD will start –Gas will be done this week 14/2/12TC meeting - A.Augustinus2 ACO AD0 EMC FMD HMP MCH MTR PHS PMD SPD SDD SSD TOF TPC TRD T0 V0 ZDC Gas MCH-GMS TRI LHC I/F Phase II Allocated Migrated

DCS - plans DCS on-call started –Only for operation issues, not for support on migration Next week mornings: Integration sessions, –Integrating detector DCSes in central DCS, checking compatibility issues –Central operation tests 14/2/12TC meeting - A.Augustinus3