EVN-NREN meeting, Schiphol, 28-1-2005, A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe.

Slides:



Advertisements
Similar presentations
Connecting Academic Networks The ORIENT, TEIN and GÉANT Projects: International Research Networks John Chevers, DANTE International eVLBI Workshop Shanghai,
Advertisements

Project Partners Project Collaborators The Council for the Central Laboratory of the Research Councils Funded by EPSRC GR/T04465/01
The CVN Real Time Correlator Zhang Xiuzhong, Chen Zhong Shanghai Astronomical Observatory China 4th e-VLBI Workshop Sydney
PERT – EVN-NREN –Amsterdam 28/1/05 – Toby Rodwell The PERT and Network Performance Monitoring EVN-NREN, Amsterdam 28//01/05.
First e-EVN Science and Future Astronomy projects via EXPReS Michael Garrett Joint Institute for VLBI in Europe e-VLBI Workshop, Sydney, 13 July 2005.
Arpad Szomoru Joint Institute for VLBI in Europe
© 2006 Open Grid Forum Interactions Between Networks, Protocols & Applications HPCN-RG Richard Hughes-Jones OGF20, Manchester, May 2007,
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk Kevin Dudevoir Jason SooHoo MIT Haystack Observatory 24 March 2006 EVN TOG meeting.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
E-VLBI Development at Haystack Observatory Alan Whitney Chet Ruszczyk MIT Haystack Observatory 10 Jan 2006 IVS General Meeting Concepion, Chile.
Electronic Transmission of Very- Long Baseline Interferometry Data National Internet2 day, March 18, 2004 David LapsleyAlan Whitney MIT Haystack Observatory,
E-VLBI Development at Haystack Observatory 5 th Annual e-VLBI Workshop Haystack Observatory 20 September 2006 Alan R. Whitney Kevin Dudevoir Chester Ruszczyk.
Next Gen. Correlator Workshop, Groningen, June 2006, A. Szomoru, JIVE NEW USE for An old correlatoR Arpad Szomoru Joint Institute for VLBI in Europe.
Current LBA Developments Chris Phillips CSIRO ATNF 13/7/2005.
E-VLBI: Connecting the Global Array of Radio Telescopes through High-Speed Networks Participating U.S. organizations: MIT Haystack Observatory MIT Lincoln.
Marcin Okoń Pozna ń Supercomputing and Networking Center, Supercomputing Department e-Science 2006, Amsterdam, Dec Virtual Laboratory as a Remote.
E-VLBI at ≥ 1 Gbps -- “unlimited” networks? Tasso Tzioumis Australia Telescope National Facility (ATNF) 4 November 2008.
E-VLBI over TransPAC Masaki HirabaruDavid LapsleyYasuhiro KoyamaAlan Whitney Communications Research Laboratory, Japan MIT Haystack Observatory, USA Communications.
International Networking for e-VLBI. What is JIVE? Operate the EVN correlator and support astronomers doing VLBI. A collaboration of the major radio-
High Data Rate Transfer for HEP and VLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester Netwrokshop33 March 2005.
High Bandwidth Data Acquisition and Network Streaming in VLBI Jan Wagner, Guifré Molera et al. TKK / Metsähovi Radio Observatory.
Support for Radio Astronomy Michael Enrico DANTE.
High Rate Internet Data Transfer for eVLBI Ralph Spencer, Richard Hughes-Jones and Simon Casey The University of Manchester All Hands Sept 2005.
VLBI/eVLBI with the 305-m Arecibo Radio Telescope Chris Salter Tapasi Ghosh Emmanuel Momjian Arun Venkataraman Jon Hagen.
4th e-VLBI workshop, Sydney, July 2005, A. Szomoru, JIVE e-VLBI and EXPReS Arpad Szomoru.
Arecibo (JIVE/EXPReS +) Presented by : Tapasi Ghosh Other active players: Arun Venkataraman, Chris Salter, & Emmanuel Momjian. A brief history.
Data Transport Challenges for e-VLBI Julianne S.O. Sansa* * With Arpad Szomoru, Thijs van der Hulst & Mike Garret.
E-VLBI FP6 Proposal. Outline Background The Call Content of Proposal & Aim Possible Participants Overall preparation plan.
Masaki Hirabaru NICT Koganei 3rd e-VLBI Workshop October 6, 2004 Makuhari, Japan Performance Measurement on Large Bandwidth-Delay Product.
Connect. Communicate. Collaborate GÉANT2 User Support for eVLBI John Chevers, Project Manager, DANTE Forskningsnet Konference 2005 Middelfart, Denmark.
76-m Lovell Telescope Jodrell Bank, UK Even big telescopes see no more detail than the naked eye High bandwidth data transfer - the future of European.
IVS General Meeting, Feb 2004, Ottawa eVLBI Research in the European VLBI Network Steve Parsley JIVE
Westerbork Netherlands Dedicated Gbit link Onsala Sweden Gbit link Jodrell Bank UK Dwingeloo DWDM link Cambridge UK MERLIN Medicina Italy Chalmers University.
Connect. Communicate. Collaborate Support by GÉANT2 and NRENs for eVLBI in Europe John Chevers, DANTE In collaboration with: Toby Rodwell (DANTE) Steve.
Data Transport Challenges for e-VLBI Julianne S.O. Sansa* * With Arpad Szomoru, Thijs van der Hulst & Mike Garret.
E. Momjian, T. Ghosh, C. Salter, & A. Venkataraman (NAIC-Arecibo Observatory) eVLBI with the 305 m Arecibo Radio Telescope ABSTRACT Using the newly acquired.
Final EU Review - 24/03/2004 DataTAG is a project funded by the European Commission under contract IST Richard Hughes-Jones The University of.
1 Masaki Hirabaru and Yasuhiro Koyama PFLDnet 2006 Febrary 2, 2006 International e-VLBI Experience.
1 eVLBI Developments at Jodrell Bank Observatory Ralph Spencer, Richard Hughes- Jones, Simon Casey, Paul Burgess, The University of Manchester.
Current Network Architecture. First eVLBI with JIVE: September 2004 The first eVLBI test observations took place on Sept. 10, The source, ,
TOG, Yebes, November 2007, A. Szomoru, JIVE Arpad Szomoru, JIVE EXPReS progress, Mark5 and e-VLBI.
Data-Acquisition and Transport – Looking Forward to 2010 and Beyond Definition of ‘Data-Acquisition and Transport’ Continuum of Transport Options Limitations.
5 th e-VLBI Workshop, Haystack Observatory, September 2006, A. Szomoru, JIVE e-VLBI Developments at JIVE Arpad Szomoru.
SA1: Production e-VLBI service Arpad Szomoru JIVE.
SA1: second year overview Arpad Szomoru JIVE January 30EXPReS Board Meeting, Utrecht, the Netherlands: SA1Slide #2 Outline Accomplishments in 2007.
2007 April 17EXPReS Annual ReviewSlide #: 1. EXPReS Annual Review April 17 EXPReS Project Team JIVE, Coordinating Institution.
PRESENTATION DATEEXPReS- TITLE OF YOUR PRESENTATIONSlide #1 What is EXPReS? EXPReS = Express Production Real-time e-VLBI Service Three year project (March.
NEXPReS Period 3 Overview WP5 Cloud Correlation Arpad Szomoru, JIVE.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
8 th EVN Symposium, Torun, September 2006, A. Szomoru, JIVE Recent e-EVN Developments Arpad Szomoru.
FABRIC WP1.2 Broadband Data Path: Protocols and Processor Interface Bonn 20/09/07 Ralph Spencer The University of Manchester.
TOG, Torun, April 2009 Arpad Szomoru, JIVE EVN/JIVE Technical developments.
NEXPReS Period 3 Overview WP2 EVN-NREN Richard Hughes-Jones, DANTE.
Recent experience with PCI-X 2.0 and PCI-E network interfaces and emerging server systems Yang Xia Caltech US LHC Network Working Group October 23, 2006.
SPIE, Orlando, May 2006, A. Szomoru, JIVE VLBI in Transition Arpad Szomoru Joint Institute for VLBI in Europe.
NEXPReS WP5 - Cloud Correlation Work Package Overview Arpad Szomoru JIVE.
Presentation Title Presentation subtitle Your name Your title, organisation.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
SA1: Production e-VLBI service Previous 12 Month Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
SA1: Production e-VLBI service Period 2 Overview Arpad Szomoru JIVE EXPReS is made possible through the support of the European Commission (DG-INFSO),
TOG, Dwingeloo, March 2006, A. Szomoru, JIVE Status of JIVE Arpad Szomoru.
SA1: technical progress
SA1: overview, first results
SA1: Production e-VLBI service
E-EVN developments in 2006 Arpad Szomoru.
Transport Protocols over Circuits/VCs
e-EVN: practical considerations
SA1: third year overview
SCARIe: eVLBI Software Correlation Over Dynamic Lambda Grids
High-Performance Data Transport for Grid Applications
Presentation transcript:

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Recent eVLBI developments at JIVE Arpad Szomoru Joint Institute for VLBI in Europe

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Outline Introduction Protocols, tuning issues Tests and results ftp-based Dual buffered Single buffered Real-time Jumbo frames Network monitoring Centralised control

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Introduction Move to disk-based operations nearly complete More reliable, data quality Cheaper to maintain Ease of use Direct access compared Unattended operations eVLBI: the future? No consumables High bandwidth Fast turn-around Disk based recording eVLBI using fiber

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE for the EVN and JIVE Feasibility of eVLBI:- Costs, timescales, logistics. Standards:- Protocols, parameter tuning, procedures at telescope and correlator. New Capabilities:- Higher data rates, improved reliability, quicker response. for GÉANT and the NRENs To see significant network usage with multiple Gbit streams converging on JIVE. Minimum is three telescopes (not including Westerbork) Must be seen to enable new science and not just solve an existing data-transport problem Real-time operation is seen as the ultimate aim, buffered operation accepted as a development stage. POC targets:

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Fibre pair from Amsterdam Optical Splitters GE lines to correlator LX Optics converters Cisco ONS Correlator Interface Current status: JIVE: 6 lambdas via Netherlight, each capable of 1 Gbps 1 Gbps connections to Westerbork, Torun, Onsala, (Metsahovi?), 2.5 to Jodrell 155 Mbps to Arecibo Connection of Medicina at 1 Gbps planned later this year Current status: JIVE: 6 lambdas via Netherlight, each capable of 1 Gbps 1 Gbps connections to Westerbork, Torun, Onsala, (Metsahovi?), 2.5 to Jodrell 155 Mbps to Arecibo Connection of Medicina at 1 Gbps planned later this year

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Protocols Use of existing protocols, available hardware TCP: maximal reliability, very sensitive to congestion UDP: connectionless, fast(er) but not reliable (enough?) Different protocols will be tested in the near future (tsunami?)

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Tuning issues Dramatic improvement of TCP performance possible by adjusting default settings: congestion window: product of roundtrip time and bandwidth size of queues between kernel and NIC SACK (Selective Acknowledgment) implementation MTU size (jumbo frames) Interrupt moderation: cpu may be bottleneck

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Tuning issues Dramatic improvement of TCP performance possible by adjusting default settings: congestion window: product of roundtrip time and bandwidth size of queues between kernel and NIC SACK (Selective Acknowledgment) implementation MTU size (jumbo frames) Interrupt moderation: cpu may be bottleneck

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Mem-mem transfer via patch

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Disk2net2disk via patch, jumbo

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Disk2net-net2disk Dwingeloo-Bologna

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Network stress test (iperf)

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Iperf (TCP) 30s intervals

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Intel(R) SE7501BR2 Intel(R) 7501 chip set Dual Intel(R) Xeon (single, 2.8G, 512K L2 cash installed) Dual channel DDR266 registered SDRAM (512MB) Dual peer PCIX 64/100, 2+2 slots 32/33 PCI, 2 slots On-board TX1000 and T10/100 NICs On-board Ultra320 SCSI On-board PATA Mark 5 Motherboard Upgrade

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Memory-memoryDisk2net-net2disk In2net- net2disk In2net- net2out UDPTCPUDPTCP Bench via patch Idem, jumbo frames Bench via Amsterdam Idem, jumbo frames Westerbork-JIVE Idem, jumbo frames Bologna-JIVE Jodrell-JIVE Arecibo-JIVE8832 Torun-JIVE Onsala-JIVE JIVE-Haystack61271 Test results

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Memory-memoryDisk2net-net2disk In2net- net2disk In2net- net2out UDPTCPUDPTCP Bench via patch Idem, jumbo frames Bench via Amsterdam Idem, jumbo frames Westerbork-JIVE Idem, jumbo frames Bologna-JIVE Jodrell-JIVE Arecibo-JIVE8832 Torun-JIVE Onsala-JIVE JIVE-Haystack61271 Test results

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Huygens descent tracking Data recorded at Mopra and Parkes, flown to Sydney, transported via dedicated 1Gbps lightpath to Jive Peak transfer rate ~400Mbps Use of modified tsunami protocol “slow start” algorithm Transfer freezes occasionally Quite buggy (but not everybody thinks so..)

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE eVLBI Transfer modes ftp-based: bandwidth not critical, has greatly improved response to technical problems at telescopes Dual buffered: recorded on Mk5 diskpack, transferred through disk2net and net2disk, played back at correlator Single buffered: streamed directly from formatters to diskpacks at JIVE Real-time: directly from formatters to correlator without disk buffering

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE eVLBI Transfer modes ftp-based: bandwidth not critical, has greatly improved response to technical problems at telescopes Dual buffered: recorded on Mk5 diskpack, transferred through disk2net and net2disk, played back at correlator Single buffered: streamed directly from formatters to diskpacks at JIVE Real-time: directly from formatters to correlator without disk buffering First real-time eVLBI Image

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE MERLIN, March 2002 eVLBI, September 2004 IRC+10420

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Jumbo frames Tested with: Results inconclusive, but… Transfer between Mk5’s (bench) UDP: <500 Mbps TCP: >500 Mbps, ONLY with jumbo frames Other hardware platform needed?

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Network monitoring BWCTL installed at most stations More measuring points along the way needed Script-based tools for inspection and visualisation of state of network

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Centralised control New operating model for EVN; correlator as integral part of network

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE

Centralised control New operating model for EVN; correlator as integral part of network Monitoring tools at stations Reliability of correlator, stability of Mark5 units Choice of platform?

EVN-NREN meeting, Schiphol, , A. Szomoru, JIVE Conclusions Mark5 not very well suited for eVLBI Hardware limitations (interrupt conflicts, outdated motherboards, proprietary hardware) Software limitation (stuck to kernel 2.4 because of Jungo drivers, proprietary software) Next platform? support for 4Gbps, PCI Xpres? as much off-the-shelf as possible as simple as possible (no disks!) Dedicated lightpaths…