Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC.

Slides:



Advertisements
Similar presentations
Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services or
Advertisements

Connecticut Brownfield Sites
Chemical Analysis of Water
BoRit Superfund Site Timeline
Environmental Protection Commission Overview Vision: Environmental Excellence in a Changing World.
SWMU 48, 62 and AOC G/SWMU 49 Update Joint Base Charleston Weapons Partnering Meeting December 4, 2013.
S53X Environmental Audit – 140 to 204 Western Avenue, Westmeadows VIC Anthony Lane Tullamarine Community Meeting, 12 March 2014.
1 Prevention and Remediation In Selected Industrial Sectors: Small Sites in Urban Areas Athens, Greece June 3-5, 2006 NATO/CCMS PILOT STUDY.
Laboratory Tests for Petroleum Pre ME tests: TPH by EPA SW s Gasoline and Fuel Oil: DEP and Gasoline and Fuel Oil: DEP.
Agenda What is BCCC? Health Data Possible Environmental Health Hazards Next Steps Lunch.
H23A14 Briton Ferry Gas Works Land Contamination Antreas Christodoulides Georgios Efstathiou Antreas Christodoulides Georgios Efstathiou.
Environmental Investigation by Con Edison Former E115th Street Gas Works November 13, 2007.
Former Landfill Environmental Management Plan Update May 8, 2012.
Science CAPT Embedded Task Review Brownfield Sites.
GHS Science CAPT Embedded Task Brownfield Sites. Does this place look familiar?
Rhode Island Department of Environmental Management
Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.
Sam Winer Motors Technical Outreach Support for Communities Michigan State University East Lansing, MI November 29, 2001.
OLD P&LE RAILYARD MCKEES ROCKS Brownfields and Economic Revitalization of the Inner City Ipek Erzi Priscila Vargas.
Phase I and Phase II Environmental Site Assessments Environmental Specialist Brownfields/Voluntary Cleanup Program June 2014.
DRAFT Field Sampling Guidance To be used this field season by DEC and consultants Initial focus on soil, groundwater, and vapor intrusion Future versions.
Monitoring Design, Available Data, and Filling Data Gaps for Determining Whether Shale Gas Development Activities Contaminate Surface Water or Groundwater.
General Electric – Housatonic River Project November 6, 2002 Overview of NAPL and Groundwater Programs Mike Nalipinski EPA New England Mike Nalipinski.
Contamination and other issues  Source Point sources Point sources Non-point sources Non-point sources Naturally occurring Naturally occurring  Reactions.
What We Know (and Don’t Know) about the Effects of Oil and Gas Development on Water Quality Martz Conference, June 5-6, 2014 Prof. Joe Ryan University.
CCRPC Board Training Climate & Brownfields September 19, 2012 Julie Potter, Senior Planner.
Overview of USGS Groundwater Quality Assessment Activities and Related Data in Alabama 2011 Alabama Water Resources Conference September 9, 2011, Perdido.
Gradient CORPORATION Vapor Intrusion Attenuation Factors (AFs) – Measured vs. EPA Defaults A Case Study Presented by Manu Sharma and Jennifer DeAscentis.
Presentation to the Restoration Advisory Board Plan for Site Investigation: Munitions Response Program (MRP) Site 1 Carr Point Shooting Range March 18,
Colorado’s Groundwater Protection Program Monitoring and Protecting Groundwater During Oil and Gas Development Natural Resources Law Center Intermountain.
Site Activities Update Park – Euclid RP Group Community Advisory Board Meeting January 16, 2013.
 HYDRAULIC FRACTURING 101: What Every Representative, Environmentalist, Regulator, Reporter, Investor, University Researcher, Neighbor and Engineer Should.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
The Contaminated Sites Cleanup Process (18 AAC 75)
SITE STATUS UPDATE TOP STOP PETROLEUM RELEASE SITE GUNNISION, UTAH Morgan Atkinson – Division of Environmental Response and Remediation, Project Manager.
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
Waste Management Strategy Outline - Geography - Future Needs – 5 and 25-Year Time Frames - Capacity - Near-Term Needs - Long Term Needs.
Pavillion Groundwater Investigation Pavillion Wyoming Phase I Sampling Results August 11, 2009.
U.S. Department of the Interior U.S. Geological Survey Monitoring perchlorate in shallow ground water in the Central United States National Water-Quality.
FRC Area 3 Site Bioremediation (August 24, 2003 – August 7, 2005) Tests were performed in two phases: (1) a clean water flush to remove bulk nitrate, Al,
1, 12/2/ Key factors for a successful ISCO application with Permanganate Prepared by: Richard W Lewis CPG Program Manager ERM.
Today’s Topics Hartford Iron site assessment Cleanup to date Cleanup steps to come What can you do.
Kuskokwim Watershed Council Key Parameters for Baseline Water Quality Assessment © David Griso.
Chad, Jacob, Ethan and Adam dwater-pollution-kids html.
FAIR Meeting April 6, Groundwater Results – Fall 2003 Benzene ND 1,000 ug/L Product.
goldentigers.org Snake River Exhibit A Water Flow Rate (No EPA Standard) Fish Kill Provided By: Consulting Scientists and Engineers M J J A S O N D J.
RUN OFFS By: Mosammat Taher. WHAT IS A RUN-OFF? A run off is when water flows over land areas and mixes with soil, minerals, and other contents This is.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
Risk Assessment and Monitoring for Environmental Chemicals SURIN AREE Environmental Scientist Thailand.
1. 2 Jonah Field, Wyo. 40 acre spacing JonahBasinphoto03lrg.jpg 550×367 pixels.
Long-Term Management of Contaminated Soil and Groundwater – Iwilei District, Honolulu April 16, 2015.
Wisconsin Department of Natural Resources Perspective on the Industrial Sand Industry March 24 th 2016.
EPA Targeted Brownfields Assessment Applications for Culturally Sensitive Sites The TseWhitZen Village Cemetery Restoration Project Joanne LaBaw, EPA Matthew.
Groundwater Pollution Week 04 – Types of Pollution 2.
Omaha Riverfront Redevelopment Project Brownfields 2004 C. Dale Jacobson, P.E., DEE.
Water. Facts About Water 97% of all water on the Earth exists within the oceans. 97% of all water on the Earth exists within the oceans. Of the 3% freshwater.
Groundwater Pollution
Environmental Cleanup Program Status
Exhibit A: Monitoring well and surface water sampling locations.
Leaking Underground Storage Tanks
East Hennepin Avenue Site
Qays Jasim Saud Syed E. Hasan Department of Geosciences
RINGWOOD MINES/LANDFILL SITE PUBLIC MEETING December 6, 2016
Drought in Upper Colorado Basin
Groundwater Pollution
From Tanker Roll-Over to NFA
Xylene Kenzie Trent.
Hold Your Breath—Ohio EPA’s TCE Initiative
Jacob Piske, Eric Peterson, Bill Perry
Chapter 17 Water Sample Analysis.
Presentation transcript:

Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC

Area History DOT plans Minnie Street Connector DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs) Widespread contamination stops project (petroleum, solvents, metals, PCBs) MSLUG Project - Railroad and ~15 RPs MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River Primary focus is public drinking water wells on other site of the Chena River 2002 – – 2004 ADEC begins FAIR project (larger than MSLUG) ADEC begins FAIR project (larger than MSLUG) 2002 Well point investigation conducted and coordinated sampling begins 2002 Well point investigation conducted and coordinated sampling begins 2003 Risk Management Workplan completed by EPA 2003 Risk Management Workplan completed by EPA

Area History DOT plans Minnie Street Connector DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs) Widespread contamination stops project (petroleum, solvents, metals, PCBs) MSLUG Project - Railroad and ~15 RPs MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River Primary focus is public drinking water wells on other site of the Chena River 2002 – – 2004 ADEC begins FAIR project (larger than MSLUG) ADEC begins FAIR project (larger than MSLUG) 2002 Well point investigation conducted and coordinated sampling begins 2002 Well point investigation conducted and coordinated sampling begins 2003 Risk Management Workplan completed by EPA 2003 Risk Management Workplan completed by EPA

MSLUG

October 1993 April 1994 March 1994 September 1993

Area History DOT plans Minnie Street Connector DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs) Widespread contamination stops project (petroleum, solvents, metals, PCBs) MSLUG Project - Railroad and ~15 RPs MSLUG Project - Railroad and ~15 RPs USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River 2002 – – 2004 ADEC begins FAIR project (larger than MSLUG) ADEC begins FAIR project (larger than MSLUG) 2002 Well point investigation conducted and coordinated sampling begins 2002 Well point investigation conducted and coordinated sampling begins 2003 Risk Management Workplan completed by EPA 2003 Risk Management Workplan completed by EPA

FAIR AREA

Four Tank Farms – fuel delivered by rail UNOCAL Tanks Saupes Tanks Willners Tanks Van Gas Tanks

FAIR AREA – Baseline Sampling

Benzene ND <5 ug/L 5-99 ug/L ug/L >1,000 ug/L Product Groundwater Results

Groundwater Results – Fall 2003 Benzene ND <5 ug/L 5-99 ug/L ug/L >1,000 ug/L Product

Groundwater Results – Spring 2004 Benzene ND <5 ug/L 5-99 ug/L ug/L >1,000 ug/L Product

GRO ND <1.3 mg/L mg/L mg/L >100 mg/L Product Groundwater Results

Groundwater Results – Fall 2003 GRO ND <1.3 mg/L mg/L mg/L >100 mg/L Product

Groundwater Results – Spring 2004 GRO ND <1.3 mg/L mg/L mg/L >100 mg/L Product

DRO ND <1.5 mg/L mg/L mg/L >100 mg/L Product Groundwater Results

Groundwater Results – Fall 2003 DRO ND <1.5 mg/L mg/L mg/L >100 mg/L Product

Groundwater Results – Spring 2004 DRO ND <1.5 mg/L mg/L mg/L >100 mg/L Product

RRO ND <1.1 mg/L mg/L mg/L >100 mg/L Product Groundwater Results – Spring 2004