Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz.

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

EU Developments Transmission Workgroup 6th October 2011.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Information Transparency Proposal Transmission Workstream 2 nd November 2006 Presentation by Abid Sheikh, energywatch and Angela Love, Poyry Energy.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Towards An ‘Electronic Trading Platform’ March 18, 2006 Pakistan Electronic Trading (PAKET) Network Mohammed Imani Executive Director Sidat Hyder Morshed.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
A regulatory framework for gas quality treatment facilities: recap and update.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
RTI,Chennai Learning Objective Given the concepts of Decision Analysis, Option Pricing and Investment Decisions, the trainee will be able to audit the.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
SO Incentives from April 2010 John Perkins. 2 Gas System Operator (SO) Incentives National Grid operates the high pressure Gas Transmission System in.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
VENCorp Revenue Proposal 1 July 2008 to 30 June 2014 Initial Public Forum Presentation.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Better Regulation: Expenditure assessment and incentives 29 April 2013.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Code Governance Review UNC Modification Proposals Chris Shanley - National Grid NTS.
Flow Variations at Entry Transmission Workstream Martin Watson 1 st November 2007.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
UNC (Urgent) Modification Proposal 0044: “Revised Emergency Cash-out & Curtailment Arrangements” UNC Transmission Workstream 11 th August 2005.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Third Workstream meeting re Baseline Re-consultation and Substitution 12 September 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Allocation of Baseline Reduction in the Substitution Methodology Draft Presentation aimed for 11 th June Substitution Workstream John Baldwin Gas Strategies.
A GAS FLOW MODEL FOR THE NTS NETWORK MELVIN BROWN CLAUDIA CENTAZZO JOGT Meeting, London, 5 June 2008.
1 Operating Margins – Request for Proposals Transmission Workstream 6 th April 2006 Dave Smith, National Grid NTS.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Supply Assumptions for Investment Planning Transmission Planning Code Workshop 1 3rd April 2008.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Review Group -140 Thoughts on additional information requirements.
Safety Monitor modifications: Ofgem’s recent decisions Simon Bradbury.
Transfers and Trades Special Transmission Workstream
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Transmission Workstream 6 January 2011
Transmission Planning Code – Draft Document
Transmission Planning Code
Transmission Workgroup 4th October 2012
Transmission Planning Code
Update on European Network Codes
Contracts and Procurement
Exit Capacity Substitution and Revision
Background to National Grid’s Baseline analysis
Potential Alternative Proposal – Interaction with Electricity Capacity Market 23 January 2018.
Development of Entry Capacity Substitution
Transmission Planning Code Review
Entry Capacity Substitution
Proposed Changes to UNC Section O
Entry Capacity Transfer and Trade
Baseline Re-consultation
Open Letter - Summary of Responses
CAM: Next Steps UNC Transmission Workgroup Lisa Martin 9 January 2014.
195AV “Future work” – system flexibility
Presentation transcript:

Consultation on disposal of part of NTS for CCS 11 May 2009 Bogdan Kowalewicz

2 Initial consultation Describe CCS opportunity Outline proposal Present initial analysis Invites responses and seek views on all aspects of proposal

3 Key Issues Regulatory issues Legal framework Considerations for Ofgem in reaching a decision Valuation of assets Commercial options

4 Regulatory concerns Baselines and Buy-back NGG Estimated Impact Value Delivery lead times for an additional compressor Security of Supply Considerations Entry capacity substitution

5 Future flows and network capability Future network requirements NGG view of St. Fergus capability St. Fergus historic flows St. Fergus forecast flows 2013 – 2018

6 Next steps Review Responses Further analysis Publish second consultation document Consultation close on 22 May 2009

7

8

9

10

11