Joint Council and Planning Commission Workshop November 4, 2013
1. Call to Order 2. Welcome and Recognition – Chairman Larry McCullough 3. Pledge of Allegiance and Invocation – Council Member Jack Estridge 4. Approval of the agenda
Cluster Subdivision Overlay Discussion By: Penelope G. Karagounis, Lancaster County Planning Director
Cluster subdivisions are residential developments which offer an alternative to traditional subdivision design, with the principle purpose being to encourage open space in exchange for a reduced lot size.
“Cluster Development” or the grouping of residential, commercial, or industrial uses within a subdivision or development site, permitting a reduction in the otherwise applicable lot size, while preserving substantial open space on the remainder of the parcel; “Overlay Zone” or a zone which imposes a set of requirements or relaxes a set of requirement imposed by the underlying zoning district when there is a special public interest in a particular geographic area that does not coincide with the underlying zone boundaries.”
Promotes integrated site design that is considerate to the natural features and topography Protect environmentally sensitive areas and protect natural features Minimizing non-point source pollution through reducing the area of impervious surface Encourage more areas of open space for recreation and social interaction
Reduced Infrastructure Costs Benefits to Wildlife Stormwater Management Access to Open Space Preserve Rural Character Encourage recreational uses, such as hiking and biking Create open space buffers between homes and adjacent agricultural uses Create a sense of a community
Town of Fort Mill City of York City of Rock Hill Greenville County City of Charleston
Permitted only in low to moderate density single-family residential districts, specifically in R-30, R-30P, R-15, and R- 15P Zoning Districts. Minimum Acreage Requirement = 30 acres Only Single-Family Homes are allowed in a Cluster Subdivision Overlay District Proposed Density: 2.5 dwelling units an acre or 1.5 dwelling units an acre/depending underlying zoning district No less than 25% of the site acreage shall be set aside for open space.
Must rezone the property to the Cluster Subdivision Overlay District if the underlying zoning is either R-15, R-15P, R-30, or R-30P. Front Setback = 20’ Side Setback = 7’ or 5’ with conditions Rear Setback = 30’
Minimum acreage Minimum lot area Variety of lot sizes Setbacks Traffic Impact Analysis Street R/W note
6. Adjournment Council Members District 1: Larry McCullough, Chairman District 2: Charlene McGriff District 3: Bob Bundy, Vice Chairman District 4: Larry Honeycutt District 5: Steve Harper District 6: Jack Estridge, Secretary District 7: Brian Carnes